2019-07-09 S&O Agenda - Item 5 - Attachment 1 - Building and Facilities Asset Management Plan

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Figure 3 identifies all buildings and facilities assets that have a modelled condition based on their
remaining life and does not reflect the physical condition of those assets. Undertaking physical
condition assessments of the assets represented in Figure 2 is required. Physical condition
knowledge will assist in developing a more realistic approach to developing renewal plans that are
prioritised and planned. This information is utilised in prioritising the physical condition assessments.




Figure 3: Modelled condition of building components by quantity

The breakdown of replacement costs by asset condition is depicted in the graphs below (figures 4,
5 & 6). The importance of these graphs are to identify the value of each asset classes’ condition and
where future investments are required to renew or rehabilitate the buildings and facilities assets. The
importance of the financial value against each condition enables Council to identify the necessary
funding requirements of each asset class into the future. Once an asset is rehabilitated or renewed
the condition rating will be adjusted within the asset management system (T1). The timing and
renewal of the assets will be addressed in the annual review of the renewal program and will be
reflected in Council’s 10-year Capital Works Program.




Asset Management Plan: Buildings and Facilities                                                 Page 12
Log in to download the original file

2019-07-09 S&O Agenda - Item 5 - Attachment 1 - Building and Facilities Asset Management Plan(PDF, 3MB).pdf · 3.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.