Log in to see the plans as drawn The risk from a natural hazard is determined by the combinedcombining an understanding of the nature
of the hazard, how likely it is to occur, and what the consequences might be if it did occur might be.
A hazard is a natural or man-made event that has the potential to cause impacts to human and ecological
systems. This can include people, buildings, values, infrastructure, agriculture, environmental assets and
communities. Hazard modelling helps us understand a hazard's intensity (or magnitude), frequency and
source. It is typically underpinned by mathematical modelsformulas that describe the propagation of the
hazard across the landscape. We useIn most cases, historical data and other information are also
combined in athe mathematical model to estimate the probability of the hazard event occurring.
Understanding the impacts of the event relies on determining the ‘exposure’ – that is, what things will
the hazard will interact with (e.g. people, buildings, infrastructure, habitat etc.); and howas well as the
level of ‘vulnerability’ of each – that is, how will it cope when it is exposed to that hazard? For the
purposes of the CHAP, five difference criteria were used to determine the possible consequences in line
with Council’s risk management guidelines. These were:
Community – Social
Community – Economic
Environmental
Council – Financial
Council – Other
The ‘risk’ to an asset/value is worked outdetermined by combining the likelihood of the event occurring
(in this case, a coastal hazard event), combined with the expected consequence (impacts) of the event
on that particular asset/value (e.g. infrastructure asset, recreational facility, etc). Table 1 shows an
example of how risk is calculated using likelihood and consequence.
LIKELIHOOD CONSEQUENCE
Insignificant Minor Moderate Major Catastrophic
Almost Certain Low Medium High Very High Very High
Likely Low Medium High High Very High
Possible Low Medium Medium High Very High
Unlikely Low Low Medium High Very High
Rare Low Low Low Medium High
Table 1: - Calculating risk
Estimating risk is has always been an uncertain sciencerequires consideration of uncertainty as it involves
forecasting events for which the exact time and location might not be largely unknownknown, but is still
critical for making sureensuring decisions are appropriately informed by the best available information
available at the time.
Determining tolerability to risks
Noosa Council – Coastal Hazards Adaptation Plan Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.