Original source · versioned page text
2021-11-15 GC Agenda - Item 7 - Attachment 2 - Coastal Hazards Adaptation Plan with tracked changes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnAdaptation outcomes and associated actions
The assessment of inundation risks to these localities shows the level of risk to most asset type is
acceptable, with the exception of risks to natural areas expected to become intolerable by 2070.
Analysis of socio-economic, environmental, and governance considerations, as well as community
input, indicate the most appropriate adaptation pathway for responding to inundation risks in this
locality is one that seeks the continuing provision of key infrastructure services over the medium- to
long-term. As a result, the preferred adaptation outcome42 for this locality is:
- Service infrastructure assets accommodate the increase in inundation risk through adaptive
design.
Figure 21 shows the expected progression of these preferred outcomes between 2020 and 2100.
Table 23.24 provides a breakdown of actions in support of these outcomes, to be pursued within
the five -year life of this plan.
Pathways Map Legend
Star = trigger points (points in time for when a decision needs to be made)
Circle = commencement or future commencement of adaptation option
Green solid line = active action on this adaptation pathway
Green dotted line = effectiveness of this option may be reduced and require
reassessment
Figure 2121 - Preferred long-term adaptation pathway response to projected coastal inundation risks in these
localitiesCooroibah, Cootharaba, Como & Boreen Point
42 The risk to natural assets in this locality will be addressed via Shire-wide adaptation outcomes
Noosa Council – Coastal Hazards Adaptation Plan Page 81
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.