N13078 - 2014.10.17 - 2 Of 2
Attached to the e-mail OPW14/0197 - Amended Plans for Approval (Email 2 of 5).
FLE, N1B078-150.dwq_DATE; 16-10-2014 TIME: 1559
—2
NOTE:
REFER TO N13078-131 FOR BIO
DETENTION BASIN NOTES AND DETAILS.
PROVIDE 5m? ROCK SCOUR
PROTECTION TO 2.0m WIDE CUT
OUT IN KERB TO ALLOW Q3
MONTH FLOW INTO BIO-SWALE
PROVIDE Sm? ROCK SCOUR
| PROTECTION TO 2.0m WIDE CUT
OUT IN KERB TO ALLOW Q3
| MONTH FLOW INTO BIO-SWALE
600x900 FIELD INLET WITH
GRATED LID. RL 11.15
BIO-RETENTION SWALE
FILTER RL 13.33 AT INLET PIT.
PROVIDE 5m? ROCK SCOUR
PROTECTION TO 2.0m WIDE CUT
OUT IN KERB TO ALLOW Q3
MONTH FLOW INTO BIO-SWALE
7
Xref's: X-ND3O78-TIT X-NIBO78-BASE X-N1307#-CONTOURS USR: Curtis Beorman
AT RL 12.45
\%
PROVIDE 3m? ROCK SCOUR
PROTECTION TO OUTLET
OUTLET INTO BASIN
NOTE
EITHER SIDE OF ELECTRICAL (TYP).
SWALE SECTION WITH NO FILTER MEDIA 0.75m
SUBSOIL
DRAIN AND SWALE PROFILE TO CONTINUE
VARIES
(FINISH PER LANDSCAPE ARCHITECTS
DETAILS)
BIO-RETENTION BASIN DETAILS LEGEND
eee ET BASIN ____ EXISTING SURFACE CONTOUR
IL URFACE AREA (m*) 57
50.1
FILTER SURFACE LEVEL (m) VARIES. — — 2 — — DESIGN SURFACE CONTOUR
TEMPORARY PONDING DEPTH (mm) 300 —— 2 —— SLOTTED PVC PIPE WITH Cl. CAP
TOP OF EMBANKMENT (m) VARIES SUBSOIL CLEAN OUT POINT
sw— PROPOSED STORMWATER PIPE
— 7— SAFETY FENCE - AS DETAILED
STEEL BEAM GUARDRAIL
ROCK ARMOURING SCOUR PROTECTION
BASIN FILTER AREA
N12-250 HORIZONTAL BAR FOR FULL
1200 150 LENGTH OF CONCRETE UPSTAND
PONDING va
N12-300 HOOKED BAR 600 LAP
500mm INLET THROUGH KERB
800mm FILTER MEDIA <0.05-3.4mm
PARTICLE SIZE.
REFER N11043-SK60
FOR MATERIAL COMPOSITION GUIDE
50mm GRAVEL LAYER (PER LANDSCAPE
ARCHITECT SPECIFICATION)
ROAD PAVEMENT AS SPECIFIED
| -—— OPTIONAL POUR BREAK
200
100mm TRANSITION LAYER 0.5-2.0mm —4
PARTICLE SIZE (TYP COARSE SAND)
200mm DRAINAGE LAYER 2.0-5.0mm
PARTICLE SIZE (TYP FINE AGGREGATE)
300 _(MIN.)
SLOTTED 100% PVC PIPE TO STORMWATER
PIT (0.50% MIN GRADE). PIPE TO HAVE MIN
50mm OF SCREENINGS ABOVE
BIOPOD TYPICAL SECTION
\ sm MATERIAL
TYPE 1A (MODIFIED) ('D’ LESS THAN 800mm TOTAL DEPTH)
SCALE 110@A1
TYPICAL SUB-SOIL DRAINS ADJACENT TO
BIORETENTION BIOPODS SHALL BE SOLID PIPE
2x LAYERS SL82 MESH,
| pm MIN. COVER
PROVIDE CONCRETE FILL UNDER PAVEMENT BOX
FOR THE LENGTH INCLUDING 0.5m BOTH ENDS
OF THE BIOPOD AGAINST BACK OF KERB.
FOUND 200 MIN. BENEATH LINE OF INFLUENCE
(L.0.1.) TO BIOPOD AS INDICATED.
SCALE (METRES 7
MCROFIUM No,
‘CLENT
DRAWING TITLE
frit far| eee en T INNOVATION PARKWAY, BIRTINYA QM PROPERTIES \ contra STORMWATER DRAINAGE
a wae nck en 11001 12.3 A Ph (07) 5436 7888 Fax (07) 5493 6630 —_ BROWN SOUTHERN BIO-RETENTION SWALE
bic Drawn creck] ‘°° 8 PROJECT Mo. ‘APPROVED SHAUN PILCHER RPEQ 14593 Brown Consufting (01D) Pty Ltd LAYOUT PLAN AND SECTIONS
i i “| | LAKE DOONELLA NOOSA i tonite Wipe QDs Rabel bem aa
ir N13078 Try [pe bes STAGE Ci - C6 Smart Consulting ‘username Srna N13078-150 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.