N13078 - 2014.10.17 - 2 Of 2
Attached to the e-mail OPW14/0197 - Amended Plans for Approval (Email 2 of 5).
STRUCTURE
NAME
IN/R
OUT/R
1/RW3
2/RW3
B/RW3
(OUT/RW3
/RW4
2/RW4,
3/RW4
4/RW4
5/RW4.
GUT/RW4
V/RWS
2/RWS
3/RWS
4/RWS
S/RWS
G15/P
GIT/S
S/J
G18/T
2/)
G19/U
3/M
G20/V
3/M
STRUCTURE
DESCRIPTION
STD NSC MANHOLE
1050mm DIAMETER
600 x 600 FIELD INLET
ON 1050 DIA, MANHOLE
00 x 600 FIELD INLET
(ON 1050 DIA, MANHOLE
100 x 900 FIELD INLET
600 x 600 FIELD INLET
ON 1050 DIA. MANHOLE
600 x 600 FIELD INLET
ON 1050 DIA. MANHOLE
600 x 600 FIELD INLET
ON 1050 DIA, MANHOLE
600 x 600 FIELD INLET
ON 1050 DIA. MANHOLE
600 x 600 FIELD INLET
ON 1050 DIA. MANHOLE
375mm DIAMETER
CONCRETE HEADWALL
600 x 600 FIELD INLET
550 DIA. ROOFWATER MANHOLE
600 x 600 FIELD INLET
ON 1050 DIA. MANHOLE
600 x 600 FIELD INLET
ON 1050 DIA. MANHOLE
STD NSC SINGLE GULLY
‘STD NSC SINGLE GULLY
STD NSC MANHOLE
1050mm DIAMETER - REFER DETAIL
1050mm DIAMETER - REFER DETAIL
STD NSC SINGLE GULLY
STD NSC SINGLE GULLY
STD NSC MANHOLE
STD NSC MANHOLE
1800mm DIAMETER - REFER DETAIL
STD NSC SINGLE GULLY
STD NSC MANHOLE
1800mm DIAMETER - REFER DETAIL
NOTE:
1. NOTWITHSTANDING THE
STORMWATER STRUCTURE
LEVELS SHOWN, THE
COVER OR GRATE LEVEL
SHALL SUIT THE FINISHED
SURFACE PROFILE.
2. THE PIPE CLASSES HAVE
BEEN DESIGNED FOR
SERVICE LOADS ONLY. THE
CONTRACTOR SHALL
ASSESS ANTICIPATED
LOADS AND UPGRADE THE
PIPE CLASSES IF
NECESSARY IN
ACCORDANCE WITH AS.
3725-1989. CRACKED PIPES
WILL NOT BE ACCEPTED.
3. CONTRACTOR TO CHECK
EXISTING CONNECTIONS
PRIOR TO CONSTRUCTION.
ROOFWATE
N13078-112
« REFER TRENCH COMPACTION
DETAIL ON DRG. N13078-112
PIPE SIZEmm (Class)
375(3)
REFER <LAY{
SWALE
(OUT PLAN
225(U)
FOR DETAIL|S
225(U)
DN 160 TL 10.88 approx)
SEWER LINE
300(3)
ROOFWATER SWALE
REFER LAYOUT PLAN
78-112 FOR DETAILS
N130
225(U)
225(U)
DN 160 (IL 8.16 approx)
SEWER LINE
wee
Tet
225(U)
225(U) 375(3)
i
4
225(U)
225(U)
ISTING SURFACE /~
m
WATERLINE &
ON 150
LI
225(U) 300(U) 375(3) 37513)
L/
fy,
375(3) 375(3)
375(3)
PIPE GRADE %
0.40%
1.00%
3.00%
100%
1.00%
1.00%
100% 115% 1.00%
0.75%
0.75%
0.75% 100% 3.00% 0.40%
3.00% 9.15%
9.68%
PIPE SLOPE 1 in X
FULL PIPE FLOW VELOCITY (m/s
750.00
0,00
100.00
33.33
iM
100.00
100.00
100.00
100.00 86.96 100.00
166 0.85
133,33
0.63
133.33
0.63
3333 100.00 33.33 250.00
121 0.91 0.53
33.33 10.93
54 0.81
10.33
0.74
PART FULL FLOW VELOCITY (m/
DATUM
L 20
133
DATUM RL
(1.0
231
151
1.23
146
158
DATUM RL +5.0
DATUM
RL 1.0
174
3.58
3.55
WATER LEVEL
IN STRUCTURE
6.625
6.625
17.148
13.966
12.813
12.599
16,388
15.035
B63
12.028
8.832
8.710
16.773
16.619
16.573
15.560
13.061
12.143
9.584
9.570
5.124
15.659
10.685
9.382
10.599
9.382
HYDRAULIC
GRADE LEVEL
6.625
6.625
6.625
17.148
11.079
B.966
B.637
12.813
12.745
12.599
16.388
16.327
15.035
14.951
3.613
13.241
12.028
11554
8.832
8.724
8.710
16.773
16.619
16.611
16.575
16544
16.387
5.560
5.202
3.061
12.167
12.143
12.687
9.584.
9.524
9517
9.211
G.124
5.627
5.625
15.331
10.685
10.414
9.365
9.241
10.599
10.361
9.365
9.241
PIPE FLOW
(Cumecs)
0.000
0.026
0.051
0.076
0.020
0.038
0.057 0.076 0.094.
0.029
0.029
0,055 0.078 0.100 0.059
0.060 0.090
0.082
DEPTH TO INVERT
0,992
0.294
1941
0.660
3.964,
0.476
0.496
0.325
1932
0.758
1958
0.756
2356
0.758
2322
0,759
4212
1.900
0.692
0.718
0.738
0.699
0.719
0.717
1780
0.785
2.983
1297
1310
14h9
1310
1372
1310
1522
1310
1522
INVERT LEVEL
OF DRAIN
6.308
6.250
16.962
16.700
13,396
12.465
445
12.400
16.225
16.000
14,800
14.600
13.000
12.800
11.236
10,900
TAbT
7.400
16.328
16.298
16.278
16.165
16.145
15.961
14,898
14,500
12.302
12.080
8.539
8.514
14,939
14,882
10.039
8.866
9.986
8.866
DESIGN SURFACE
LEVEL
7.300
6.544
18.903
17.360
12.941
12.725
18.157
16.758
15.356
13.558
11.659
9.300
17.020
17.016
16.864
16.678
5.285
B377
9.849
9.963
16,249
16.254
11349
10.388
11.296
10.388
SETOUT
£5295.658
B
N1206.701
£5307.843
N1199.045
£5161.123
N1132.025
£5190.234
N1121.233
F5194.664
N1120.747
£5166.250
N1219.125
£5187.347
N1211.304
£5206.099
N1204.351
£5224.852
N1197.399
£5252.209
N1187.257
£5256.600
N1185.629
£5235.960
N1006.689
£5235.987
N1010.689
£5221.028
N1010.789
£5230.027
N1033.729
F5244.560
N1070.778
£5247.995
N1077.318
£5292.383
N1257.323
£5297.882
N1254.424
£5234.199
N1337.067
£5234.993
N1335.354
£5236.289
N1239.819
£5245.993
N1231.422
£5234.702
N1234.008
£5245.993
N1231.422
RUNNING
CHAINAGE
0.000
14-390
0.000
26.200
26.200
31.047
5
&
70.
51.247
0.000
22.500
22500
7500
20.00
3
20.00 29.176
91.676
4.683)
62500
96.359
0,000
‘0
=
185559
39.797
F801
26.64; 1.387
83,398
90.785
0.000
o
2
a
0.000
1871
0.000
8
0.000
568
11.568
11
LINE
FILE; NIBO78-134.dvg_ DATE: 16-10-2014 TIME: 15:44
Pxref's: X-NBBOI8-TIT USR; Curtis Boorman
RW3
a
Wh
RW5
TARST | CaLcs [ORAWN]
FF
DATE.
OTA
AMENDMENT DETAILS
5
NT_[ 05.08.14 [LINE RW3 AMENDED TO SUIT BIO SWALE
Ce_| e.10.18 [SECTIONS UPDATED
DESIGN CHECK
O4zmEOzmE>
Palm] o[ oe] >
DRAWN CHECK|
‘SCALE (METRES T
AS SHOWN
WIGROFILM No.
PROJECT No.
N13078
SURVEYOR: RPS
1 INNOVATION PARKWAY, BIRTINYA
Ph (07) 5436 7888 Fax (07) 5493
"APPROVED
[ea
FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTO
6630
SHAUN PILCHER RPEQ. 14593}
MATHEW HILL RPEQ 11578
BRENT THOMAS RPEQ 7862
“CLIENT
QM PROPERTIES
PROJECT
LAKE DOONELLA NOOSA
STAGE C1 - C6
BROWN
Smart Consulting
Pr
(CONSULT AUSTRALIA
a
Brown Consutting (QLD} Pty Ltd
Loge 3, 14 nonaton Pony, Biings QUD Artli 4575,
Tdaghone 07 54709260 Forsimile 7 5470 9282
rien Coburn Mune Spey tapers net Cut
1
Bon!
rr
DRAWING TITLE
STORMWATER DRAINAGE
LONGITUDINAL SECTIONS
SHEET 3 OF 4
‘DRAWING NUMBER
N13078-134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.