Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
Construction Management Plan

Principal Contractor Details

Organisation Name                   qldBUILT Pty Ltd

Director                            Dominic Tyacke

Address                             2/20 Technology Dr, Warana QLD 4575

Phone                               0410 332 167

Email                               [email protected]

ABN                                 39 606 947 175

QBCC                                15035880


Project Details

                                “JURA”
Project Name
                                79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD 4566

Client                          Capital Prudential Pty Ltd C/- Norhart Developments
Client Contact                  Mr Matt Denny
Email                           [email protected]                  Phone   On request


Document Control

Amendments to this CMP are approved by the Project Manager and authorised for distribution to all holders of
controlled copies

Revision No.     Details                                                                             Date           Initialled
         1       qldBUILT Construction Management Plan Template                                   30/10/2023           DT
         2       Site Specific CMP: 79 - 83 Eumundi Noosa Road & 26 Headland Drive,               20/02/2024         DT / AL
                 Noosaville QLD 4566




Document:          CMP01      Construction Management Plan        [Version 2.0]            Scheduled Review Date:   30/10/2024

Page 1 of 18       qldBUILT Pty Ltd | Uncontrolled when printed                                   Date Reviewed:    Xx/xx/xx

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.