Council archive · source document
qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (17.3 MB): may take a few minutes to open.
FPE Ref: 6693-240215-1.0 1.0 INTRODUCTION 1.1 BACKGROUND QLD Build Pty Ltd (the Contractor) has been engaged by Norhart in relation to 79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD (the site). The works include construction of multiple residential units and landscaping (refer Figure 1). A Site Development Layout Plan has been included as Appendix A. The project generally can be described as the following; The development is composed of 38 residential apartments & townhouses in 7 small individual separate 2 storey buildings, with the following including: ▪ 12 x 2-bedroom 2 storey small dwellings ▪ 24 x 2-bedroom single storey small dwellings ▪ 2 x 3-bedroom split level 2 storey units ▪ Covered car space and storage for each 2-bedroom dwelling and 2 covered spaces for the 2 & 3- bedroom dwellings T ▪ 10 visitor car spaces AF ▪ Common area swimming pool ▪ Demolition of existing dwellings on the site (by others) R This Construction Environmental Management Plan (CEMP) has been prepared by Future-Plus Environmental to assist the Contractor in undertaking site works in a manner that complies with D environmental requirements relevant to the project. 15 February 2024 Construction Environmental Management Plan 1 79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.