FPE Ref: 6693-240215-1.0



  2.0 ROLES & RESPONSIBILITIES
  The Construction Foreman shall ensure full compliance with the CEMP by all staff, sub-contractors, and
  visitors. Key personnel proposed as part of the implementation of the CEMP are identified in Table 2.
  It is noted that the General Environmental Duty, cultural heritage Duty of Care and General Biosecurity
  Obligation shall always apply to all personnel at the site.

  Table 2. Key personnel

   Roles                Responsibilities                                                    Organisation
                             ▪   Ensure all relevant approvals / permits are obtained prior
   Construction                                                                             QLD Built Pty Ltd
                                 to works;
   Manager
                             ▪   Ensure that relevant legislation, codes, and policies are
                                 complied with;
                             ▪   Ensure all relevant requirements of this CEMP are
                                 implemented as required;
                             ▪   Provide adequate resources to ensure environmental
                                 management, training and CEMP requirements are
                                 implemented; and
                             ▪   Reporting to the Department of Environment and Science
                                 and other State entities as required by permits and
                                                            T
                                 approvals.
                                                 AF

                             ▪   Ensuring project operations are performed in accordance
   Construction                                                                             QLD Built Pty Ltd
                                 with CEMP requirements;
   Foreman
                             ▪   Ensure all personnel on site have undertaken a site
                                 induction;
                                           R



                             ▪   Ensuring non-compliances are reported and corrective
                                     D



                                 actions are taken;
                             ▪   Ensuring staff and subcontractors fulfil their
                                 environmental obligations;
                             ▪   Reviewing environmental procedures;
                             ▪   Undertake monitoring and reporting requirements;
                             ▪   Establish and maintain the incident register, complaints
                                 register and compliance checklists and report this
                                 information to the Construction Manager;
                             ▪   Direct all works for machinery and truck operators;
                             ▪   Arranging and attending inspections and meeting;
                             ▪   Schedule periodic meetings with operational staff to
                                 discuss and record improvement opportunities, keeping
                                 up to date with industry guidelines;
                             ▪   Assigning project staff to perform CEMP duties; and
                             ▪   Perform regular inspections of the site works to identify
                                 areas that require improvements.
                             ▪   To undertake site works as instructed by the Construction All personnel
   All Staff /
                                 Foreman;
   Subcontractors            ▪   To ensure all equipment used and works undertaken are
                                 in compliance with this CEMP;
                             ▪   To report all incidents, spills, or non-conformances with
                                 the CEMP to the Construction Foreman; and




15 February 2024                   Construction Environmental Management Plan                               5
                           79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville
                                                       QLD

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.