qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (17.3 MB): may take a few minutes to open.
FPE Ref: 6693-240215-1.0
6.5 CULTURAL HERITAGE MANAGEMENT
Objective To protect and preserve any items of Aboriginal and/or Torres Strait Islander cultural heritage significance that may exist within the impact area.
Potential
An item of cultural significance is found/ damaged or destroyed.
Impacts
Performance
No harm to any cultural heritage values over the site.
Criteria
Control ▪ The site induction will include responsibilities and mitigation measures regarding the cultural heritage duty of care for all personnel.
T
Measures ▪ If any items of cultural significance are located during construction works, the Site Foreman are to be notified and all activities in the vicinity of
AF
the item will cease until items are investigated and management steps are determined.
▪ Where areas or items of cultural significance are identified, the area shall be delineated and protected from adjacent construction activities.
R
▪ Any findings of Aboriginal cultural heritage significance must be reported within 24 hours to Department of Seniors, Disability Services and
D
Aboriginal and Torres Strait Islander Partnerships (DSDSATSIP).
▪ Any findings of other cultural heritage material must be reported to DSDSATSIP / DES.
▪ Works shall not recommence in the area until authorised by DSDSATSIP / DES.
Monitoring Weekly inspections will be carried out to check:
▪ No disturbance is occurring outside designated construction zone; and
▪ Works are being undertaken in accordance with the cultural heritage duty of care.
Reporting ▪ Contractor to maintain a log of inspections, maintenance actions.
15 February 2024 Construction Environmental Management Plan 18
79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.