6.7 WASTE & HAZARDOUS MATERIAL MANAGEMENT
▪ Drips and minor fuel/chemical spills are to be captured using ‘dry’ method spill kits (use absorbent materials not degreasers, detergent
or hosing down) and disposed of appropriately at a waste disposal site.
▪ Ensure there is a suitable number of spill kits for use throughout the project and in locations available for immediate use.
▪ All equipment is to be well maintained, inspected frequently and free from fuel, oil, grease leaks.
▪ No waste is to be burnt on site.
▪ Visible waste is to be removed from site as soon as practicable.
▪ Site workers using chemicals and/or fuel operated machinery should be trained in procedures to prevent soil and water contamination.
T
▪ Under no circumstances are hazardous materials to be placed in an overland flow path or stormwater drain.
AF
Weekly inspections should be carried out to check:
Monitoring
▪ Work practices are conducted in a manner to reduce waste and to manage and dispose of waste appropriately.
R
▪ Work areas to ensure waste is being properly managed.
▪ Waste levels in receptacles to determine when wastes require removal from site.
Reporting
▪
▪
D
Waste tracking records are to be maintained of all waste removed from the site, including disposed wastewater, and removed soil.
Any spills or incidents are to be reported to the Site Foreman immediately.
▪ Overflow of waste receptacles.
Incidents
▪ Migration of hazardous substances, including fuels, to stormwater drains.
If the results of monitoring indicate objectives are not met, the following shall be progressed:
Corrective Actions
▪ Immediately remove any waste that has left the boundaries of the site.
▪ Immediately cease any non-compliant waste management practices.
15 February 2024 Construction Environmental Management Plan 23
79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.