Council archive · source document
qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (17.3 MB): may take a few minutes to open.
BASIN TYPE - SETTLING ZONE VOLUME ;
(m}) Vs BASIN TYPE - SEDIMENT STORGAE ZONE VOLUME (m’) Vss
L d BASIN ID TYPE B TYPE D (80°4ILE) | TYPED (85°%ILE) TYPE D
egen TYPE B TYPE D (85%ILE) | VOLUME MIN. (m*) | VOLUME MIN. (m*) | VOLUME MIN. (m*) | VOLUME MIN. (m*)
30% of Vs 50% of Vs 50% of Vs RUSLE
Dirty Water Flow Catchment 1 Bas 167 137 50 53 68 26
Path Catchment 2 8 197 161 59 62 81 31
Flow Diversion
Bank WEIR DISSIPATER Source: Esti, Menen, lEantnetar
Geographics, and te GIS
-_ Se eee SIDE MIN. HEIGHT | MEAN ROCK - <u
- Woven Fabric RecN se Bare ps ware FREEBOAR| coi twayto| size-pso | WIDTH1| WIDTH 2 | LENGTH
. (linx) (m) | Dim) TOB (m) (mm) (m) (m) (m)
@ Basin
[2 Access Track
Catchment
Areas
K
SS
Catchment Area 2
Note:
The locations of Erosion and Sediment Control measures are
indicative only. Actual locatione are to be determined on sito
and in keeping with the principals and intent of this erosion and
Seciment contol plan
DRAWN BY:
Tim Doherty
CPESC #9116
CLIENT: QLD Built
a
/ IN - THLE:
1 Earthworks
79 - 83 E \di No Rd
CATCHMENT ID | AREA (HA) R K Ls Pp c A (t/ha/yr) A (t/yr) CONTROL tumunal Noosa
0.91 13 499 232 65 TYPE1 SCALE AT A1: DATE: DRAWN: CHECKED
— : = NIS 17/02/2024 TD ™D
0.91 13 1 232 5 TYPE 3
Catchment 2 0.91 13 199 232 7 TYPE1 PROJECT NO: DRAWING NO: REVISION
2 0. f .00 232 77 om 's
PED ri [I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.