Council archive · source document
Appendix E - Revised Stormwater Management Plan · MCU21/0175
Plans and drawings: the text below has words only, no drawings.
Very large file (13.5 MB): may take a few minutes to open.
26 July 2022
Table of Contents
EXECUTIVE SUMMARY 2
1 PURPOSE 5
2 INTRODUCTION 5
2.1 Project Description 5
3 SITE CHARACTERISTICS 6
3.1 Site location 6
3.2 Topography and Existing Site Drainage 6
4 SITE DATA 7
5 STORMWATER 7
5.1 Flooding 7
5.2 Lawful Point of Discharge 7
5.3 Site Based Stormwater Management Plan 7
5.4 Operational Phase 8
5.5 Proposed Stormwater Quality Treatment Devices 13
5.6 Construction Phase (Sediment and Erosion Control) 14
6 CONCLUSION 17
7 LIMITATIONS OF REPORT 17
Excellence with Economy in Engineering 3
l:\8000-8999\8200-8299\8293\reports\26-07-22 stormwater management plan_issue e.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Revised Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.