Attached to the e-mail Operational Works Application OPW19/0133 - DA Form 1 - Pre-lim Construction Management Plan - Civil Plans - 10 Opal St Cooroy.

Attached to the e-mail MCU19/0013 & RAL19/0003 - Response to Information Request - 10 Opal St Cooroy.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

        PROPOSED DUPLEX

INTEGRATED WATER MANAGEMENT PLAN

              VERSION 0

                  FOR

           ROBERT ERHARTER
                HOUSE 10
     LOT 6 on RP82318186 OPAL LANE,
                COOROY
               APRIL 2019




                                      Callaghan & Toth
                                        Civil, Environmental &
                                        Hydraulic Engineers
Log in to download the original file

Storm Water - Lex Toth.pdf · 441 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 10 pages

Page 2

                                                                                                              Callaghan & Toth


                                                 DOCUMENT HISTORY

Document Reference:                                    No: 1905 SWQMP_Rev0.doc

Project Manager:                                       Robert Erharter

Author:                                                Lex Toth

Client:                                                Robert Erharter

Contact Person:                                        Robert Erharter




DISTRIBUTION LIST

                                               POSITION ON
    NAME            ORGANISATION               MANAGEMENT               REVISION          REVISION         REVISION        REVISION
                                                  TEAM                      0                 1               2               3
Robert Erharter                                   Client                    1
Lex Toth            Callaghan & Toth                 Author                 1
Billy Glover        Noosa Council            Assessment Officer             1




REVISION LIST

          REVISION                     DATE DISTRIBUTED                        ISSUED BY                         CHECKED BY

             0                            10 April 2019                         Lex Toth                       Jane Davissen




             The information contained in this report is confidential and proprietary to Callaghan & Toth Civil,
             Environmental & Hydraulic Engineers. It may only be used by the person to whom it is provided,
                  for the stated purpose for which it is provided, and must not be imparted to any third person
             without the prior written approval of Callaghan & Toth. Callaghan & Toth reserves all legal rights
                  and remedies in relation to infringement of its rights in respect of its confidential information.
                                                           ©
                                                  Callaghan & Toth
                                                         2019




Erthart                                           1905 SWMP_Rev0.doc                                               April 2019   2
1905

Page 3

                                                                                                     Callaghan & Toth

CONTENTS

1.     INTRODUCTION................................................................................................. 4
     1.1     Response to Conditions of Approval ............................................................ 4
2.     DESCRIPTION.................................................................................................... 4
3.     FLOODING ......................................................................................................... 4
4.     STORMWATER DESIGN AND ASSESSMENT.................................................. 8
     4.1     Proposed On-Site Stormwater Treatment Process ...................................... 8
       4.1.1      Rainfall Data ........................................................................................... 8
     4.2     Hydrology ..................................................................................................... 8
CONCLUSIONS ......................................................................................................... 9
APPENIDX 1: Summary of Retention Calculation Results ....................................... 10




LIST OF REFERENCES

1.         EN HEALTH (2004) Guidance on the Use of Rain Water Tanks.
2.         Engineers Australia (2006) Australian Runoff Quality. Australian Runoff Quality
           Guidelines.
3.         Healthy Waterways (2006) Water Sensitive Urban Design Technical Design
           Guidelines for South East Queensland
4.         Queensland Development Code Part 4.3 (Oct 2008) Alternative Water Sources.
5.         Water by Design, MUSIC Modelling Guidelines for South East Queensland – Version
           1 (December 2010)
6.         Water by Design, Deemed to Comply Solutions – Stormwater Quality Management
           (South East Queensland), May 2010
7.         Wong, T., Breen, P. & Lloyd, S. (2000) Water Sensitive Road Design – Design
           Options for Improving Stormwater Quality of Road Runoff. CRC for Catchment
           Hydrology Technical Report No 00/1.



LIST OF FIGURES


Figure 1.1                   Proposed Stormwater Quality Management Layout                                              6
Figure 4.1                   Typical Rainwater Tank                                                                     7



LIST OF TABLES

Table 1.1           Response to Information request                                                                      5




Erthart                                       1905 SWMP_Rev0.doc                                         April 2019     3
1905

Page 4

                                                                                  Callaghan & Toth

1.        INTRODUCTION

The site subject to this report is at No.10 Opal Street Cooroy. One existing house on the lot
is to be added to by a new dwelling to the rear.

The stormwater management assessment undertaken in this project considers the increase
in impervious area of the lot due to the proposed additional building and measures which
can be incorporated into the design to attenuate the resultant increase in runoff back to
predevelopment levels.

The existing dwelling catchment drains to Opal Street.

The new dwelling site currently drains to Opal Lane as shown on Figure 1.1. the proposed
new drainage system will replicate the existing catchment split.


1.1       Response to Conditions of Approval

TABLE 1.1: Response to Information Request
NUMBER CONDITION                                                          RESPONSE
7a           Detail of proposed tank (location, dimensions, level)        Details shown on Figure
                                                                          1.1
7b           Detail of proposed drainage system (pipe sizes and           Details shown on Figure
             grades)                                                      1.1
7c           Existing and proposed surface levels to demonstrate that     Details shown on Figure
             suitable clearances can be achieved                          1.1
7d           Comment regarding the capacity of the existing drainage      Refer Section 4.2 of this
             system in Opal Street to be achieved                         report
7e           Indications of the various catchment areas within the site   Refer Section 3 of this
             and certification that states if the development is          report
             constructed in accordance with the design there will be no
             worsening of drainage conditions on adjoining properties,
             Opal Street and Opal Lane.


2.        DESCRIPTION

The site is on a 1,009 m2 parcel of land which has frontage to both Opal Street and Opal
Lane. There is an existing underground drainage system with a channel in Opal Street. Opal
Lane road has recently been extended past this site to serve a new development at 8 Opal
Lane.


3.        FLOODING

The existing house drains toward Opal Street. The downpipes discharge into an existing
gully pit in Opal Street.
No.8 Opal Street has an overland flow path along the west boundary which is designed to
take the stormwater overland flow from sag in Opal Street.
The runoff from the existing half of the property currently drains to a low point at the south
west corner of No. 10 Opal Lane. The plan figure 1.1 shows the new development will
maintain this flow path and therefore have no effect on the neighbouring property.


Erthart                              1905 SWMP_Rev0.doc                              April 2019   4
1905

Page 5

                                                                         Callaghan & Toth

The rear half of Opal Street drains to Opal Lane and the laneway kerb capacity has been
designed to convey this runoff. This SWMP proposes to not alter these catchment
boundaries.




Erthart                          1905 SWMP_Rev0.doc                         April 2019    5
1905

Page 6

 

 

 

      
      
   
   
 

 

 

 

 

 

 

 

LEGEND — EXISTING SERVICES . :
| \ m4 ae Toth Environmental
BOUNDARY :
us Environmental &
EASEMENT Hydraulic Engineers
féfis/ ssi spf is f PO BOX 2305
BUILDING NOOSA HEADS 4567
AAA CONCRETE y! 6/41 Sunshine Beach Road
=] Phone 54749081, Fax 54749041
— DRAINAGE www.callaghanandtoth.com.au
designed | ADT datum AHD DERIVED
i ste es — EDGE. OF ‘BITUMEN crown 1 oy 10192
$i FENCE checked [CL__| Origin (BM.) RL 111.413
| | —S —p ——s —— — __ DRAINAGE CHANNEL
approved
N ooo CEE SURVEYED. BY
OVERHEAD POWER MAX WATTERSON & ASSOCIATES
PHONE (07) 54426121
SEWER
(———e—————————™
SEWER RISING MAIN project
W ———— ___ WATER MAIN PROPOSED 2 LOT
T ———— _ TELSTRA 10 OPAL STREET
COOROY Q. 4563
@™ WATER METER
Ke)
i | TELSTRA PIT ————————
Client
POW
OWER POLE ROBERT ERHARTER
a
_ EEE
LEGEND — PROPOSED SERVICES title

OPAL LANE STORMWATER

Le NEW CONCRETE DRIVEWAY DETENTION & DRAINAGE PLAN
OO)

—
DN100 PVC STORM WATER PIPE HOUSE 10

+  ——— —__DN9O PVC STORMWATER PIPE LOT 6 on RP 82318

CATCHMENT BOUNDARY Parish of TEWANTIN
County of MARCH
DETENTION TANK 0 DEY SUNSHINE COAST COUNCIL

DETENTION TANK T0 DETAIL 5
Locality of COOROY

En

_————
SCALE

100mm% DOWNPIPE FROM GUTTERS p=] ]0_1.25 2.5 3.75 5 6.25 Meters 12.5}
SS
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
3,000L TANK

WET LINE TO TANK INLET

 

 

 

Sw SW

 

 

 

 

 

 

WET LINE TO TANK INLET

 

 
  
    
   
 
    

  

 

 

NEW 3,000L ROOFWATER
DETENTION TANK TO DETAIL

 

 

 

 

1:250(A3) DO NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED

 

REVISIONS

 

revision
A | PREMILIMARY

100mm OVERFLOW PIPE

 

 

 

FILL 0.15m DEEP IN CORNER
To PROVIDE PIPE coveR| |

NEW METAL KERB ADAPTER

 

 

FILES

 

32mm LOW FLOW OUTLET COMPUTER DIRECTORY

XAVJOBS\CT PRON PROG\

aN POR APPROVAL

Sheet 1 of 1 sheets
300x300 FIELD INLET CONCRETE SLAB =
drawing number

DETENTION TANK DETAIL FIGURE 1.1

NOT TO SCALE
XK date 10 APRIL 2019 yy,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 7

 

OVERFLOW PIPE TO GULLY PIT

EXTENDED DETENTION DN32

OUTLET TO GULLY PIT

Co

 

ROOFWATER DOWNPIPE

 

 

eli

 

sot”

FIRST FLUSH DIVERSION

ia TO GARDEN BEDS

 

 

 

 

 

 

Callaghan & Toth

Civil, Environmental &
Hydraulic Engineers

8/41 Sunshine Beach Road

P.O. Box 2305
{ NOOSA HEADS 4567
Ph: 54749081

= www.callaghanandtoth.com.au

project

PROPOSED DUPLEX

location

10 OPAL LANE,
COOROY

TYPICAL RAINWATER TANK

Figure 4.1

 

 

Scale:NTS

 

 

Page 8

                                                                            Callaghan & Toth


4.        STORMWATER DESIGN AND ASSESSMENT


4.1       Proposed On-Site Stormwater Treatment Process

The developed site was divided into Sub-Catchments as shown on Figure 1.1 and the
detention system is listed below:

1. Rainwater Detention Tanks will be required to collect water from all the roof areas of the
   new house. A total of two (2) tanks with a capacity of 3,000 litres per tank will be
   provided for the new house. The tanks are to an overflow pipe discharging to the
   underground drainage system. The total tanks capacity is to be 6,000 litres and is
   adequate for the approximate attenuation of runoff back to predevelopment
   concentrations for AEP1%, 10%, 50%.



4.1.1 Rainfall Data
The meteorological data used for the BOM IFD table for Cooroy was used for the runoff
calculations



4.2       HYDROLOGY

The site has been modelled using HydroCAD 10 to determine the detention capabilities of
the rainwater tanks.

The rainwater detention tanks adopted have been sized so that runoff concentrations are
reduced back to predevelopment levels as shown in our calculations in Appendix 1.

As the existing runoff and catchment extents to Opal Street is not to be affected by this
development, there will be no change to the capacity of drainage to Opal St..

As the new runoff from the new house in Opal Lane is to be attenuated to pre-development
levels, there will be no change to the capacity of existing drainage in Opal Lane.




Erthart                           1905 SWMP_Rev0.doc                           April 2019   8
1905

Page 9

                                                                         Callaghan & Toth



CONCLUSIONS

The Rainwater Detention Tanks are able to attenuate the runoff concentrations back to pre
development levels and so the development will not have an impact on the hydrology of the
existing Lane.




Erthart                          1905 SWMP_Rev0.doc                        April 2019   9
1905

Page 10

                                                       Callaghan & Toth


APPENIDX 1: Summary of Retention Calculation Results




Erthart                   1905 SWMP_Rev0.doc             April 2019   10
1905

Page 11

     APPENDIX 1: SUMMARY OF RETENTION CALCULATION RESULTS
                       10 OPAL ST DUPLEX

Pre-Development Case

501m² Catchment

tc = 6 min., C=0.70
Cf50%=0.85, Cf10%=1.00, Cf1%=1.20

              Q1% flow = 0.0346 m³/s
              Q10% flow = 0.0198 m³/s
              Q50% flow = 0.0125 m³/s


Post-Development Case (No Detention)

501m² Catchment
      Roof = 222m²
      Grass/Landscaping/Driveway = 279m²

tc = 6 min., Roof C=0.98, Grass/Landscape/Driveway C=0.73
Cf50%=0.85, Cf10%=1.00, Cf1%=1.20

              Q1% flow = 0.0384 m³/s
              Q10% flow = 0.0238 m³/s
              Q50% flow = 0.0150 m³/s


Post-Development Case (with Detention)

501m² Catchment
      Roof = 222m²
      Grass/Landscaping/Driveway = 279m²

tc = 6 min., Roof C=0.98, Grass/Landscape/Driveway C=0.73
Cf50%=0.85, Cf10%=1.00, Cf1%=1.20

              Q1% flow = 0.0255 m³/s
              Q10% flow = 0.0158 m³/s
              Q50% flow = 0.0105 m³/s

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.