Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Storm Water - Lex Toth

Attached to the e-mail Operational Works Application OPW19/0133 - DA Form 1 - Pre-lim Construction Management Plan - Civil Plans - 10 Opal St Cooroy.

Attached to the e-mail MCU19/0013 & RAL19/0003 - Response to Information Request - 10 Opal St Cooroy.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

     APPENDIX 1: SUMMARY OF RETENTION CALCULATION RESULTS
                       10 OPAL ST DUPLEX

Pre-Development Case

501m² Catchment

tc = 6 min., C=0.70
Cf50%=0.85, Cf10%=1.00, Cf1%=1.20

              Q1% flow = 0.0346 m³/s
              Q10% flow = 0.0198 m³/s
              Q50% flow = 0.0125 m³/s


Post-Development Case (No Detention)

501m² Catchment
      Roof = 222m²
      Grass/Landscaping/Driveway = 279m²

tc = 6 min., Roof C=0.98, Grass/Landscape/Driveway C=0.73
Cf50%=0.85, Cf10%=1.00, Cf1%=1.20

              Q1% flow = 0.0384 m³/s
              Q10% flow = 0.0238 m³/s
              Q50% flow = 0.0150 m³/s


Post-Development Case (with Detention)

501m² Catchment
      Roof = 222m²
      Grass/Landscaping/Driveway = 279m²

tc = 6 min., Roof C=0.98, Grass/Landscape/Driveway C=0.73
Cf50%=0.85, Cf10%=1.00, Cf1%=1.20

              Q1% flow = 0.0255 m³/s
              Q10% flow = 0.0158 m³/s
              Q50% flow = 0.0105 m³/s
Log in to download the original file

Storm Water - Lex Toth.pdf · 441 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.