Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Storm Water - Lex Toth

Attached to the e-mail Operational Works Application OPW19/0133 - DA Form 1 - Pre-lim Construction Management Plan - Civil Plans - 10 Opal St Cooroy.

Attached to the e-mail MCU19/0013 & RAL19/0003 - Response to Information Request - 10 Opal St Cooroy.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                     Callaghan & Toth

CONTENTS

1.     INTRODUCTION................................................................................................. 4
     1.1     Response to Conditions of Approval ............................................................ 4
2.     DESCRIPTION.................................................................................................... 4
3.     FLOODING ......................................................................................................... 4
4.     STORMWATER DESIGN AND ASSESSMENT.................................................. 8
     4.1     Proposed On-Site Stormwater Treatment Process ...................................... 8
       4.1.1      Rainfall Data ........................................................................................... 8
     4.2     Hydrology ..................................................................................................... 8
CONCLUSIONS ......................................................................................................... 9
APPENIDX 1: Summary of Retention Calculation Results ....................................... 10




LIST OF REFERENCES

1.         EN HEALTH (2004) Guidance on the Use of Rain Water Tanks.
2.         Engineers Australia (2006) Australian Runoff Quality. Australian Runoff Quality
           Guidelines.
3.         Healthy Waterways (2006) Water Sensitive Urban Design Technical Design
           Guidelines for South East Queensland
4.         Queensland Development Code Part 4.3 (Oct 2008) Alternative Water Sources.
5.         Water by Design, MUSIC Modelling Guidelines for South East Queensland – Version
           1 (December 2010)
6.         Water by Design, Deemed to Comply Solutions – Stormwater Quality Management
           (South East Queensland), May 2010
7.         Wong, T., Breen, P. & Lloyd, S. (2000) Water Sensitive Road Design – Design
           Options for Improving Stormwater Quality of Road Runoff. CRC for Catchment
           Hydrology Technical Report No 00/1.



LIST OF FIGURES


Figure 1.1                   Proposed Stormwater Quality Management Layout                                              6
Figure 4.1                   Typical Rainwater Tank                                                                     7



LIST OF TABLES

Table 1.1           Response to Information request                                                                      5




Erthart                                       1905 SWMP_Rev0.doc                                         April 2019     3
1905
Log in to download the original file

Storm Water - Lex Toth.pdf · 441 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.