Original source · versioned page text
Storm Water - Lex Toth
Attached to the e-mail Operational Works Application OPW19/0133 - DA Form 1 - Pre-lim Construction Management Plan - Civil Plans - 10 Opal St Cooroy.
Attached to the e-mail MCU19/0013 & RAL19/0003 - Response to Information Request - 10 Opal St Cooroy.
Callaghan & Toth
CONTENTS
1. INTRODUCTION................................................................................................. 4
1.1 Response to Conditions of Approval ............................................................ 4
2. DESCRIPTION.................................................................................................... 4
3. FLOODING ......................................................................................................... 4
4. STORMWATER DESIGN AND ASSESSMENT.................................................. 8
4.1 Proposed On-Site Stormwater Treatment Process ...................................... 8
4.1.1 Rainfall Data ........................................................................................... 8
4.2 Hydrology ..................................................................................................... 8
CONCLUSIONS ......................................................................................................... 9
APPENIDX 1: Summary of Retention Calculation Results ....................................... 10
LIST OF REFERENCES
1. EN HEALTH (2004) Guidance on the Use of Rain Water Tanks.
2. Engineers Australia (2006) Australian Runoff Quality. Australian Runoff Quality
Guidelines.
3. Healthy Waterways (2006) Water Sensitive Urban Design Technical Design
Guidelines for South East Queensland
4. Queensland Development Code Part 4.3 (Oct 2008) Alternative Water Sources.
5. Water by Design, MUSIC Modelling Guidelines for South East Queensland – Version
1 (December 2010)
6. Water by Design, Deemed to Comply Solutions – Stormwater Quality Management
(South East Queensland), May 2010
7. Wong, T., Breen, P. & Lloyd, S. (2000) Water Sensitive Road Design – Design
Options for Improving Stormwater Quality of Road Runoff. CRC for Catchment
Hydrology Technical Report No 00/1.
LIST OF FIGURES
Figure 1.1 Proposed Stormwater Quality Management Layout 6
Figure 4.1 Typical Rainwater Tank 7
LIST OF TABLES
Table 1.1 Response to Information request 5
Erthart 1905 SWMP_Rev0.doc April 2019 3
1905