Storm Water - Lex Toth
Attached to the e-mail Operational Works Application OPW19/0133 - DA Form 1 - Pre-lim Construction Management Plan - Civil Plans - 10 Opal St Cooroy.
Attached to the e-mail MCU19/0013 & RAL19/0003 - Response to Information Request - 10 Opal St Cooroy.
Callaghan & Toth The rear half of Opal Street drains to Opal Lane and the laneway kerb capacity has been designed to convey this runoff. This SWMP proposes to not alter these catchment boundaries. Erthart 1905 SWMP_Rev0.doc April 2019 5 1905