Council archive · source document
Applicants Suspension of Appeal Period - OPW11/0335
TODCONSULTING
civil &. structural engineers
(!) lii!!,jii
TOO CONSULTING PTY LTO DIRECTORS 20 Mary Street Noosaville QLD 4566
ABN 39 128 805 336 S Prystupa B.E., M.I.E.Aust C.P.Eng, R.P.E.Q. PO Box 61 Noosaville QLD 4566
C Dowding B.E., M.I.E.Aust R.P.E.Q. P 07 5449 9600
D Reynolds B.E., M.I.P.W.E.Aust. R.P.E.Q. F 07 5449 9494
E enquir [email protected]
DR: YW 10525-8 www.todconsulting.com
YOUR REF: 08W 11/0335
06 July 2012
The Chief Executive Officer
Sunshine Coast Council
Locked Bag 72
SCMC QLD 4560
ATTENTION: Mark Lewis
Dear Sir
RE: ESSENCE OF PEREGIAN
DAVID LOW WAY, PEREGIAN BEACH
OPERATIONAL WORKS OPW 11/0335
SUSPENSION OF APPEAL PERIOD
for the
I refer to your Decision Notice dated 19 June 2012 providing preliminary approval
above Operational Works. On behalf of the Applicant I hereby request the
formall~
bond.
appeal period be suspended to allow time to arrange payment of the compliance
I trust this meets with your requirements.
Yours faithfully
DOUG REYNOLDS
TOO CONSULTING
103l5’
oPW (I
b.~J.w.... ..../0..........1
R:
lrug~; f’tJ+rJ(’I,rJ& fh,~~I""’8"T
buildings I bridges I mining & civil I roads I subdivisions I structural renewal I urban street scapes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Applicants Suspension of Appeal Period - OPW11/0335Related documentApplication case desk ↗
About this file
- File size
- 402 KB (small file)
- File type
No other editions are linked here.