Appendix A - Preliminary Engineering Plans

Attached to the e-mail RAL21/0009 - Response to information request - Gould Email 1 of 2.

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
   GENERAL NOTES:                                                                                                                                                            SEWER NOTES:
                                                                                               COMPACTED FILLING
  1. ALL WORK ON THIS CONTRACT IS TO BE CARRIED OUT IN                                                                                                                      GENERAL
     ACCORDANCE WITH THE JOB SPECIFICATION AND TO                                               1. ALL COMPACTED FILL SHALL BE MATERIAL OF MINIMUM CBR 15%.                                                                                                             30.MANHOLE & MAINTENANCE SHAFT LIDS SHALL BE Ø600 CAST IRON TYPE AND RENDERED
                                                                                                 THE MAXIMUM PERCENTAGE (BY MASS) OF                                        1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT SOUTH EAST QUEENSLAND
     THE SATISFACTION OF THE LOCAL AUTHORITY AND THE                                                                                                                                                                                                                       TRAFFICABLE (CLASS D) WITHIN STREET CARRIAGEWAY OR WHERE VEHICULAR LOADING IS LIKELY.
                                                                                                                                                                                SEWERAGE CODE (SEQ CODE) SPECIFICATIONS AND STANDARDS.                                     REFER TO SEQ CODE STANDARD DRAWING SEQ-SEW-1307-1 & SEQ-SEW-1308-1 FOR
     ENGINEER.                                                                                        MATERIAL                                                              2. UNLESS SPECIFIED OTHERWISE, ALL MATERIALS AND WORK SHALL COMPLY WITH THE RELEVANT
                                                                                                2. PASSING THE 0.425MM SIEVE SHALL BE 22%. THE MAXIMUM                                                                                                                     DETAILS.
                                                                                                                                                                                AUSTRALIAN STANDARDS.
   2. THE CONTRACTOR IS TO CONTACT ENERGEX, TELSTRA,                                            PLASTICITY INDEX SHALL BE 6%. THE GRADING CURVE OF THE                                                                                                                  31.SEWER COVER AND SURROUND TO FINISH FLUSH WITH ROAD AND FOOTPATH PAVEMENTS.
                                                                                                                                                                            3. THE CONSTRUCTION OF THE SEWERAGE WORK SHOWN ON THIS DRAWING SHALL BE SUPERVISED
      COUNCIL AND OTHER SERVICE AUTHORITIES AND                                                 MATERIAL SHALL BE SMOOTH WITH 100% OF MATERIAL PASSING                          BY AN ENGINEER WHO HAS R.P.E.Q REGISTRATION. SEWERAGE WORKS NOT COMPLYING WITH          32.CONCRETE INFILL MAINTENANCE STRUCTURE COVERS ARE NOT ACCEPTED BY UNITYWATER.
      LOCATE EXISTING UNDERGROUND SERVICES PRIOR TO                                             THE 19mm SIEVE. ALL COMPACTED FILL SHALL BE COMPACTED                           THIS REQUIREMENT WILL NOT BE PERMITTED TO CONNECT INTO THE UNITYWATER SEWERAGE          33.ALL MAINTENANCE SHAFT RISER LIDS TO BE BETWEEN 100MM AND 225MM FROM COVER LID.
      CONSTRUCTION.                                                                             AT OPTIMUM MOISTURE CONTENT TO 100% COMPACTION TO                               SYSTEM.                                                                                 34.MAINTENANCE HOLE NECK TO BE MAXIMUM 350MM DEEP.
                                                                                                AS1289 - E1.1. ALL FILL SHALL BE PLACED IN COMPACTED LAYERS                 4. ALL WORK ASSOCIATED WITH LIVE SEWERS OR MAINTENANCE HOLES SHALL BE CARRIED OUT BY        35.ALL MAINTENANCE SHAFTS TO BE TYPE J1, 300MM SHAFT UNLESS NOTED OTHERWISE,
  3. CONDUIT LOCATIONS IF SHOWN ON THE PLANS ARE                                                NO MORE THAT 150MM THICK. THE CONTRACTORS IS TO CARRY                           UNITYWATER AT THE DEVELOPER'S COST.                                                        WITH LIFT OFF LIDS AND FINISHED 50MM ABOVE FINISHED SURFACE LEVEL TO ALLOW FOR TOP
     PROVISIONAL ONLY AND THE CONTRACTOR IS TO LIAISE                                           OUT ONE COMPACTION TEST EVERY 500M², FOR EVERY SECOND                       5. ALL PIPES AND MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE "ACCEPTED                 DRESSING UNLESS IF LOCATED WITHIN ROAD OR FOOTPATH PAVEMENT (TO BE FINISHED FLUSH).
     WITH THE ENGINEER, TELSTRA AND THE ELECTRICAL                                              LAYER OF FILL.                                                                  PRODUCTS AND MATERIALS" LIST.                                                              REFER TO SEQ SEWER CODE STANDARD DRAWING SEQ-SEW-1314-2 FOR DETAILS.
     CONSULTANT FOR THEIR FINAL PLANS IMMEDIATELY                                               3. REMOVE ALL EXISTING FILL FROM THE SITE. COMPACT THE TOP                  6. EACH ALLOTMENT SHALL BE SERVED BY A DN100 PVC PROPERTY CONNECTION. FOR                   36.REFER TO SEW CODE STANDARDS DRAWING SERIES SEQ-SEW-1300 FOR MAINTENANCE
     PRIOR TO LAYING ROAD AND FOOTPATH CONDUITS.                                                                                                                                ALLOTMENTS OTHER THAN SINGLE RESIDENTIAL, A DN150 PVC PROPERTY CONNECTION SHALL BE         STRUCTURE, MANHOLE AND DROP DETAILS.
                                                                                                300MM OF THE NATURAL GROUND UNDER THE BUILDING TO A
                                                                                                DISTANCE OF 1.5M BEYOND THE EXTERNAL PERIMETER OF THE                           PROVIDED.
   4. THE ENGINEERING DESIGN IS BASED PARTLY ON A DATA                                                                                                                      7. PROPERTY CONNECTIONS SHALL BE LOCATED WITHIN THE PROPERTY AS SHOWN IN THE DRAWINGS.
                                                                                                BUILDING TO 100% MODIFIED COMPACTION. THE COMPACTED                                                                                                                     AS CONSTRUCTED DATA
      TERRAIN MODEL COMPUTER GENERATED FROM THE                                                                                                                             8. PROPERTY CONNECTION BRANCHES SHALL EXTEND INTO THE PROPERTY A MINIMUM OF 500MM
      SITE SURVEY AND SOME ELEMENTS OF THE SURVEY                                               FILL (AS PER CF.1.) SHALL BE COMPACTED IN LAYERS TO 95%                                                                                                                 37.IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL AS CONSTRUCTED AND QUALITY,
                                                                                                STANDARD COMPACTION TO WITHIN 300mm OF THE FINISHED                             AND A MAXIMUM OF 750MM.
      DATA ARE INTERPOLATED AND MAY VARY FROM THE                                                                                                                           9. WHERE PIPES ARE LAID IN FILL, THE FILLING SHALL BE CARRIED OUT IN LAYERS NOT EXCEEDING       INFORMATION IN ACCORDANCE WITH THE SEQ CODE, UNITYWATER AND THE LOCAL AUTHORITY
       ACTUAL SITE CONDITIONS. THE CONTRACTOR SHALL                                             GROUND LEVEL. THE REMAINING 300MM OF FILL SHALL BE                                                                                                                          REQUIREMENTS, TO THE CERTIFYING ENGINEER.
                                                                                                COMPACTED IN TWO LAYERS TO 95% STANDARD COMPACTION.                             300MM (LOOSE) IN DEPTH AND SHALL BE COMPACTED UNTIL THE COMPACTION IS NOT LESS
      LIAISE WITH THE ENGINEER AND SURVEYOR AND SET                                                                                                                             THAN 95% OF THE MATERIALS MAXIMUM COMPACTION WHEN TESTED IN ACCORDANCE WITH             38.THE NECESSARY TESTING AND COMPLIANCE INFORMATION TO BE PROVIDED TO THE CERTIFYING
      OUT THE WORKS ONLY FROM APPROVED REFERENCE                                                COMPACT ALL FILL TO A DISTANCE OF 1.5M BEYOND THE                                                                                                                           ENGINEER INCLUDES, BUT IS NOT LIMITED TO:
                                                                                                EXTERNAL PERIMETER OF THE BUILDING.                                             A.S.1289 (MODIFIED COMPACTION). TESTING SHALL BE CARRIED OUT AFTER EACH ALTERNATIVE
      PEGS AND LEVEL BENCH MARKS.                                                                                                                                               LAYER. IN ALL SUCH CASES, APPROVAL OF CONSTRUCTED SEWERS WILL NOT BE ISSUED BY                     · CONTRACTOR'S ACCREDITATION
                                                                                                                                                                                UNITYWATER UNLESS CERTIFICATES ARE PRODUCED CERTIFYING THAT THE REQUIRED COMPACTION                · PRODUCT AND MATERIAL CERTIFICATES
  5. THE CONTRACTOR IS TO ORGANISE HIS WORKS SO THAT                                                                                                                            HAS BEEN ACHIEVED.                                                                                 · AS CONSTRUCTED SURVEY IN BOTH PDF AND DWG FORMATS AS PER SEQ CODE
     EROSION, DEPOSITION OF SILT, AND STORMWATER                                                                                                                            10.WHERE SEWERS HAVE A GRADE OF 1 IN 20 OR STEEPER, TRENCH STOPS SHALL BE                                ASSET INFORMATION SPECIFICATION AND SIGNED BY A LICENCED SURVEYOR
     RUNOFF FROM THE JOB SITE DOES NOT EXCEED THE                                                                                                                               CONSTRUCTED IN ACCORDANCE WITH THE SEQ SEWER CODE TABLE 8.1.
     PRE CONSTRUCTION RATES AT ANY POINT AS A RESULT                                                                                                                                                                                                                               · ASSET DESIGN AS CONSTRUCTED (ADAC) IN BOTH XML AND PDF FORMATS
                                                                                                                                                                            11.THE CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF EXISTING SERVICES WITH RELEVANT
      OF HIS ACTIONS.                                                                              EARTHWORKS NOTES:                                                            AUTHORITIES BEFORE COMMENCING WORKS.                                                               · AS CONSTRUCTED REDLINE MARK-UP OF DESIGN DRAWINGS
                                                                                                    1. ALL EARTHWORKS SHALL BE IN ACCORDANCE WITH                           12.SEWERS SHALL BE DISUSED/ABANDONED IN ACCORDANCE WITH PROCEDURES SET OUT IN THE                      · VACUUM TEST REPORT
  6. CLEAR ALL VEGETATION FROM THOSE AREAS TO BE
     EXCAVATED OR FILLED. IN OTHER AREAS WHERE                                                         AS3798-1996                                                              SEQ SEWER CODE.                                                                                    · ACCESS CHAMBER VACUUM TEST REPORTS
     CLEARING IS SPECIFIED, SELECTED CLEARING ONLY IS                                               2. STRIP ALL VEGETATION, TOPSOIL & UNCONTROLLED                         13.BENCH MARK AND LEVELS TO AHD.                                                                       · OVALITY TEST REPORT
     TO BE CARRIED OUT BY RETAINING THOSE TREES                                                        FILL & REMOVE FROM SITE.                                             14.EXISTING DWELLINGS NOTED TO BE CONNECTED TO THE NEW SEWER SHALL BE CONNECTED BY A                   · COMPACTION TEST REPORTS FOR ALL TRENCHES
     MARKED BY THE ENGINEER AND LEAVING THE AREA IN                                                 3. CONTROL TESTING OF EARTHWORKS SHALL BE                                   LICENCED PLUMBER IN ACCORDANCE WITH THE RELEVANT STATUTORY AND COUNCIL                             · CCTV FOR ALL NEW SEWER MAINS AND PROPERTY SERVICES, FORMAT AS PER SEQ
     A CONDITION SUITABLE FOR SLASHING.                                                                UNDERTAKEN IN ACCORDANCE WITH AS3798. GEOTECHNICAL                       REQUIREMENTS.                                                                                        CODE REQUIREMENTS
                                                                                                       CERTIFICATION TO BE TO LEVEL 2.                                      15.ALL WORKS ON EXISTING SEWERS TO BE CARRIED OUT BY UNITYWATER PRIVATE WORKS AT THE
                                                                                                                                                                                                                                                                                   · CONCRETE TEST CERTIFICATES OF DELIVERY DOCKETS FOR ALL CONCRETE MANHOLES AND
  7. THE CONTRACTOR IS TO PRESENT UP THE JOB FOR ON-                                                4. ALL FILL MATERIAL SHALL BE PLACED AND COMPACTED                          DEVELOPER'S EXPENSE.                                                                                 STRUCTURES
     MAINTENANCE AND OFF-MAINTENANCE INSPECTIONS                                                       TO THE FOLLOWING STANDARDS (UNO).                                    PIPEWORK                                                                                               · COPY OF PRIVATE WORKS CONNECTION RECEIPT
      WHEN DIRECTED BY THE ENGINEER WITH ALL PIPES,                                                 4.1. COHESIVE MATERIAL - FILL SHALL ACHIEVE A MINIMUM                   16.THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE SEWER DRAINAGE LONGITUDINAL
     ROADS AND ALLOTMENTS FREE OF RUBBISH OR SILT
      AND WITH FOOTPATHS AND PARK AREA SLASHED OR
                                                                                                       DRY DENSITY RATIO (M.D.D.R.) of 138% STD SUBGRADE
                                                                                                     SHALL ACHIEVE 98% STD M.D.D.R.
                                                                                                                                                                                SECTIONS. PIPE SIZES ARE LISTED ON THE LONGITUDINAL SECTIONS.                                 ENVIRONMENTAL MANAGEMENT NOTES:
                                                                                                                                                                            17.ALL SEWER PIPES UP TO 3M DEEP SHALL BE RUBBER RING JOINTED UPVC CLASS SN8 UNLESS
     MOWN, AND UNDERGROUND SERVICES OPENED FOR                                                                                                                                                                                                                                 VEGETATION PROTECTION
                                                                                                    4.2. NON COHESIVE MATERIAL - FILL SHALL ACHIEVE A                           NOTED OTHERWISE.
     INSPECTION.                                                                                                                                                                                                                                                               A. TREES LOCATED ALONG FOOTPATH SHALL BE, TRANSPLANTED
                                                                                                       MINIMUM DENSITY INDEX RATIO of 130%                                  18.ALL SEWER PIPES DEEPER THAN 3M SHALL BE UPVC CLASS PN12 UNLESS NOTED OTHERWISE.
                                                                                                                                                                                                                                                                                    PRIOR TO CONSTRUCTION, OR REPLACED IF DESTROYED.
                                                                                                    5. FIELD DENSITY TESTS SHALL BE UNDERTAKEN AT A                         19.ALL LONG RADIUS BENDS (LRB) SHALL BE MINIMUM 3.0M RADIUS FORMED BENDS ONLY WITH
  8. NO WORK IS TO COMMENCE ON THE SITE UNTIL THE                                                                                                                                                                                                                              B. WHEN WORKING WITHIN 4.0M OF TREES, RUBBER OR HARDWOOD
                                                                                                       FREQUENCY OF ONE TEST PER 200M         ³ DISTRIBUTED                     A MAXIMUM DEFLECTION ANGLE OF 45°.
     APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN                                                                                                                                                                                                                                   GIRDLES SHALL BE CONSTRUCTED WITH 1.8M BATTENS CLOSELY
                                                                                                       REASONABLY EVENLY THROUGHOUT FULL DEPTH AND                                                                                                                                  SPACED AND ARRANGED VERTICALLY FROM GROUND LEVEL.
     WRITING AND AN OFFICIAL PRE-START MEETING WITH A                                                                                                                        TRENCHING AND EMBEDMENT
                                                                                                       AREA OR THREE TEST PER VISIT, WHICH REQUIRES THE                                                                                                                             GIRDLES SHALL BE STRAPPED TO TREES PRIOR TO CONSTRUCTION
     REPRESENTATIVE OF COUNCIL AND THE ENGINEER                                                                                                                              20.DETECTABLE MARKER TAPE TO BE INSTALLED WITH ALL SEWERAGE MAINS.
     HAVE BEEN HELD. THE CONTRACTOR IS TO OBTAIN A                                                     MOST TEST. FIELD DENSITY TEST OF EXCAVATED SOFT                                                                                                                              AND REMAIN TO COMPLETION.
                                                                                                       GROUND SHALL BE UNDERTAKEN AT A FREQUENCY OF                          21.EMBEDMENT MATERIAL TO BE 7MM SINGLE SIZED CRUSHED ROCK.
     COPY OF THE MINUTES OF THE PRE-START MEETING                                                                                                                            22.SEWER TRENCHING AND BACKFILL SHALL BE AS SHOWN ON SEQ CODE STANDARD DRAWING                    C. TREE ROOTS SHALL BE TUNNELED UNDER, RATHER THAN
     AND SHALL COMPLY WITH ALL REQUIREMENTS                                                            ONE TEST PER 100M ³ DISTRIBUTED REASONABLY EVENLY                                                                                                                            SEVERED. IF ROOTS ARE SEVERED THE DAMAGED AREA SHALL
                                                                                                       THROUGHOUT FULL DEPTH AND AREA.                                          SERIES SEQ-SEW-1200.
     THEREOF.                                                                                                                                                                                                                                                                       BE TREATED WITH A SUITABLE FUNGICIDE. CONTACT RELEVANT
                                                                                                    6. FIELD DENSITY TESTING OF TRENCH BACKFILL SHALL BE                                                                                                                            COUNCIL ARBORIST FOR FURTHER ADVICE.
                                                                                                                                                                            PROPERTY CONNECTIONS
  9. ALL CONSTRUCTION IS TO BE SET OUT BY THE                                                          UNDERTAKEN AT A FREQUENCY OF 1 TEST PER 2 LAYERS                                                                                                                        D. ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN
                                                                                                                                                                            23.ALL PROPERTY CONNECTIONS SHALL BE 100MM DIAMETER UPVC CLASS SN8 AND IN ACCORDANCE WITH
     CONTRACTOR FROM PEGGING OF ROAD CENTRELINE,                                                       PER 20 LINEAR METERS.                                                   SEQ CODE STANDARD DRAWINGS SEQ-SEW-1103-1, SEQ-SEW-1104-1,                                           APPROVED ARBORIST.
     MANHOLE POSITIONS, LOT STAKING AND TBM's PROVIDED                                                                                                                         SEQ-SEW-1104-2, SEQ-SEW-1105-1, SEQ-SEW-1314-1 AND SEQ-SEW-1314-2                               SOIL
     BY THE PRINCIPAL'S LICENSED SURVEYOR.                                                                                                                                     FOR SEWER PROPERTY CONNECTION DETAILS.                                                          A. TOPSOIL AND SUBSOIL SHALL BE STOCKPILED SEPARATELY.
                                                                                                                                                                            24.ALL PROPERTY CONNECTION INSPECTION OPENINGS TO HAVE 2.0M LONG, ORANGE, PVC, 40MM                B. CARE SHALL BE TAKEN TO PREVENT SEDIMENT FROM ENTERING
                                                                                                                                                                               DIA. CONDUIT IN ACCORDANCE WITH SEQ CODE STANDARD DRAWING SEQ-SEW-1104-2.                            THE STORMWATER SYSTEM. THIS MAY INVOLVE PLACING
                                                                                                                                                                            25.BRASS KERB MARKERS ARE TO BE PLACED AT SEWER ROAD CROSSINGS.                                         APPROPRIATE SEDIMENT CONTROLS AROUND STOCKPILES.
                                                                                                                                                                                                                                                                               CREEK CROSSINGS
                                                                                                                                                                            MANHOLES AND MAINTENANCE SHAFTS                                                                    A. SILTATION CONTROL MEASURES SHALL BE PLACED DOWNSTREAM
                                                                                                                                                                                                                                                                                    OF ANY EXCAVATION WORK.
                                                                                                                                                                            26.CONCRETE FOR MANHOLE CONSTRUCTION SHALL BE SPECIAL CLASS SCC40MPA (S40) TO WSA
                                                                                                                                                                               PS-358 & WSA 114:2002 AS PER THE ACCEPTED PRODUCTS AND MATERIALS LIST.                          B. APPROPRIATE SEDIMENT CONTROLS SHALL BE USED TO PREVENT
                                                                                                                                                                                                                                                                                    SEDIMENT FROM ENTERING THE CREEK
                                                                                                                                                                            27.CONCRETE FOR MANHOLES TO USE 10MM CALCAREOUS AGGREGATE.
                                                                                                                                                                                                                                                                               C. NO SOIL SHALL BE STOCKPILED WITHIN 5M OF THE CREEK.
                                                                                                                                                                            28.ALL SEWER MANHOLES TO BE 1050MM DIAMETER, UNLESS NOTED OTHERWISE, FITTED WITH LIFT              REHABILITATION
                                                                                                                                                                               OFF LIDS AND FINISHED 50MM ABOVE FINISHED SURFACE LEVEL TO ALLOW FOR TOP DRESSING.              A. PRE-DISTURBANCE SOIL PROFILES AND COMPACTION LEVELS ARE
                                                                                                                                                                               REFER TO SEQ CODE STANDARD DRAWING SEQ-SEW-1300-1, SEQ-SEW-1301-1,
                                                                                                                                                                                                                                                                                    TO BE REINSTATED.
                                                                                                                                                                               SEQ-SEW-1302-1, SEQ-SEW-1303-1, SEQ-SEW-1304-1, SEQ-SEW-1305-1,
                                                                                                                                                                                                                                                                               B. PRE-DISTURBANCE VEGETATION PATTERNS SHOULD BE RESTORED.
                                                                                                                                                                               SEQ-SEW-1307-1 AND SEQ-SEW-1308-1 FOR DETAILS.
                                                                                                                                                                                                                                                                               SAFETY
                                                                                                                                                                            29.MANHOLES ARE TO BE CONSTRUCTED AS CAST IN-SITU WHEREVER GROUNDWATER IS                          A. THE DESIGN AND CONSTRUCTION OF THE WORKS SHALL COMPLY
                                                                                                                                                                               ENCOUNTERED AS PER SEQ CODE STANDARD DRAWING SEQ-SEW-1307-1.
                                                                                                                                                                                                                                                                                    WITH ALL QUEENSLAND LEGISLATION.


                                                                                                                                                                                                                                                                              Copyright: The drawing and engineering content shown in this drawing remains the property of Blackall Range
                                                                                                                                                                                                                                                                              Consulting Engineer and may not be copied, altered, sections omitted or erased and changes made without the prior
                                                                                                                                                                                                                                                                              written approval of Blackall Range Consulting Engineer. Acceptance of Blackall Range Consulting Engineer fee proposal
                                                                                                                                                                                                                                                                              or estimate is deemed sufficient to effectuate an agreement. Non-payment of said fee proposal or estimate and
                                                                                                                                                                                                                                                                              subsequent use of Blackall Range Consulting Engineer drawings or material is a breach of said agreement and subject
                                                                                                                                                                                                                                                                              to litigation. ABN 94950162458
Rev. No. Drawn Amendment Details
   0
                                                                                           Drawn
                                                                                           CJF
                                                                                                   Checked
                                                                                                   CJF
                                                                                                             Date
                                                                                                                    Site Classification:    NA          Blackall Range                                         Email: [email protected]
                                                                                                                                                                                                               PO Box 342,TEWANTIN, QLD
                                                                                                                                                                                                               Phone: 54457353                CLIENT:                         PROJECT DETAILS:          Sheet No.              11 of 13
                                                                                                                                                                                                               Mobile: 0419140465
                                                                                                                                                                                                                                                                                                        Date Issued:
                                                                                                                    Soil Classification:    CI          Consulting Civil, Structural & Geotechnical Engineer
                                                                                                                                                                                                                                              B & M GOULD                     ALLOTMENT RECONFIGURATION CAD File:
                                                                                                                                                                                                                                                                                                                     Sept 2021



Copyright: The design and engineering content shown on this drawing remains the property
                                                                                                                    Wind Category:          N3                                                       Campbell J Foster                                                        LOT 401 & 402 HAY STREET  DRAWING NUMBER               REV.
of Blackall Range Consulting Engineer and may not be copied, altered, sections omitted
or erased and changed in any way without the prior written approval from Blackall
Range Consulting Engineer. ABN 94950162458
                                                                                                                    Terrain Category:       2.5                                       MEIAust (CPEng Civil), RPEQ 7228, NER
                                                                                                                                                                                                                                                                              TEWANTIN                  2021-1087-11                  1
Log in to download the original file

Appendix A - Preliminary Engineering Plans.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.