Minor Change Report 132008 478 02 {As Published}
Legend
Eastern Pipe to Drain
Exposed Drain
Spoon Drain
Figure 9 – Approximate Drain Locations
Table 1, shows the current, proposed and change of the area over the basketball courts, of which
drain to concrete spon drain, via eastern drain pipe to the exposed drain and overland flow to
exposed drain the drain.
Area over basketball courts draining: Current Proposed Change
To concrete spon drain 435m2 700m2 +265m2
Via eastern pipe to drain 320m2 700m2 +380m2
Overland flow to the exposed drain 550m2 0m2 -550m2
Table 1 – Area over basketball courts draining changes
The applicant was issued a further advice letter on 22 March 2021, regarding the hours of operation
for the basketball court, whether the shade sail will alter the existing drainage catchments such
that will result in scour within each receiving drain, and if the eastern drain was constructed and
maintained as per the approved design. The applicant failed to provide an adequate response to
the stormwater questions in the further advice letter. Council requested the applicant engage
advice form the stormwater engineer that designed the existing system that the proposed shade
sail structure will drain to. In turn, the applicant provided insufficient information to Council for what
is considered to be a minor and resolvable issue.
A new condition is therefore proposed to facilitate the installation of the proposed shade sails and
as such will not overload the existing drainage system, thus generating scour, water ponding and
mosquito breeding.
Page 11 of 13
Document Set ID: 21473273
Version: 4, Version Date: 18/05/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.