Minor Change Report 132008 478 02 {As Published}

of 13

Page text shows just the words. Original shows the document exactly as it was published.

                                Legend
                                       Eastern Pipe to Drain
                                       Exposed Drain
                                       Spoon Drain

                                                       Figure 9 – Approximate Drain Locations


               Table 1, shows the current, proposed and change of the area over the basketball courts, of which
               drain to concrete spon drain, via eastern drain pipe to the exposed drain and overland flow to
               exposed drain the drain.

                       Area over basketball courts draining:                  Current           Proposed   Change

                       To concrete spon drain                                 435m2             700m2      +265m2

                       Via eastern pipe to drain                              320m2             700m2      +380m2

                       Overland flow to the exposed drain                     550m2             0m2        -550m2

                                             Table 1 – Area over basketball courts draining changes


               The applicant was issued a further advice letter on 22 March 2021, regarding the hours of operation
               for the basketball court, whether the shade sail will alter the existing drainage catchments such
               that will result in scour within each receiving drain, and if the eastern drain was constructed and
               maintained as per the approved design. The applicant failed to provide an adequate response to
               the stormwater questions in the further advice letter. Council requested the applicant engage
               advice form the stormwater engineer that designed the existing system that the proposed shade
               sail structure will drain to. In turn, the applicant provided insufficient information to Council for what
               is considered to be a minor and resolvable issue.
               A new condition is therefore proposed to facilitate the installation of the proposed shade sails and
               as such will not overload the existing drainage system, thus generating scour, water ponding and
               mosquito breeding.




                                                                                                            Page 11 of 13

Document Set ID: 21473273
Version: 4, Version Date: 18/05/2021
Log in to download the original file

Minor Change Report 132008 478 02 {As Published}.pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.