Original source · versioned page text
Minor Change Report 132008 478 02 {As Published}
Figure 7 – Proximity to nearest resident
The proposed roof includes 13 x 200W LED lights at various mounting heights. The direction of
the proposed lights face towards the court, thus soften light pollution towards the adjacent dwelling
houses. Further, the proposed use of the basketball court is between 7:30am and 3pm and
therefore it is unlikely the lights will be used on a regular basis. The mature vegetation and direction
of the proposed lights facing away from the nearby dwelling houses will not result in the proposal
adversely affecting the amenity enjoyed by nearby residential uses and complies with
Performance Outcome PO27 of the Community Activities Code.
Stormwater Runoff
The application proposes to change the current drainage arrangements for runoff from the
basketball courts towards the bioretention basin.
The application proposes to direct an additional 550m2 of catchment area towards the outlet pipe
into the drainage swale. This area already shows evidence of scour alongside the edges of the
outlet of the drain, suggesting that the velocity of flows in that area are resulting in the scour.
Additional catchment will increase this existing scour.
Further, the application proposes to direct an additional 265m2 to the concrete spoon drain to the
west. No information has been provided regarding whether the additional flows are within the
capacity of the drain, or whether they will overflow and cause scour.
Page 9 of 13
Document Set ID: 21473273
Version: 4, Version Date: 18/05/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.