Skip to the record
The gold standard in government transparency.

Council archive · source document

TPC 2705 - Request to change existing approval [As Published] · 51994.1375.02

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

 

 

 

 

 

NEW TIMBER POST AND BEAMS

YZ) MEW BUILDING

 

200 X 200 TIMBER POST

      

ALUMINIUM .

1D BLOCK WALL 200 x 200 TIMBER POST
ALUMINIUM SCREEN 4.8m RENOERE! x
WINDOWS HIGH

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Bun UNE

RENDERED BLOCK WALL

         

      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(STING

TIMBER POST WITH

SATINA GLASS

ALUMINIUM
SCREEN 1.8m

SOUTH ELEVATION

CONCRETE POOL SHELL
{TO ENGINEERS DETAILS) -

TIMBER GATE TO
BTORAGE UNDER
TERRACE

ALUMINIUM,
WINDOWS.

MAX 8.0

RL 45.85

IE OF PITCHING POINT.

 

IN!

 

    

 

 

 

 

 

 

 

 

 

 

 

    

  
   

 

 

 

i 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

le

a

i

 

 

 

 

 

eee reece ween eee a eeeee + SROUND.FLQOR CEILING LINES.

A

 

 

 

2400

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

INO UNE

HANDRAIL - TIMBER POST
WITH SATINA GLASS BETWEEN

NORTH ELEVATION

 

 

"NATURAL GAGKINE LINEAL” 7" NATURAL TGROOAG Gite ~ -

 

 

 

 

 

 

 

 

 

EXISTING & FINTSHED GROUND UNE

  

EXISTING GARAGE

 

design
BSA LICENCE: 1127508

ry
tron
pesca
nanan

PO BOX 135
NOOSAVILLE
QLD 4566

office:
12 WEYBA ST
SUNSHINE BEACH -
QLD 4567

P: (07) 54748 107
F: (07) 54748 108
B: [email protected]
W: www.chrtscloutdesign.com.au

GENERAL NOTES:

Use written dimensions only,
DO NOT scale drawings.
Contractors to verify afl
dimensions on site prior to
commencing works,

Stte tocation is Category N3
or to engineers requirments.
These drawings are to be read
{n conjunction with engineer's.
design and details, the
accompanying building
specification and schedule

of finishes,

"If in doubt, please request

clarification. DO NOT ASSUME,

Project:
PROPOSED RENOVATIONS

tent:
IRWIN GLENN &
MATTHEWS TREVOR

Site Address:

LOT 1 RP 160353,

20 BELMORE TERRACE
SUNSHINE BEACH

Drawing Title:

ELEVATIONS

Date:
14/10/09

Scale:
1:100 @ a2

Drawn By:
C Clout

Amendment Dahes:
CONSTRUCTION
14/10/08

Drawing No:

05.0

 

 

 

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

TPC 2705 - Request to change existing approval [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.