Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2021-03-15 General Committee Agenda

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


             General
         Committee Meeting


              Monday, 15 March 2021

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2021-03-15 General Committee Agenda(PDF, 11MB).pdf · 11.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 76 (of 80)

Section 2

GENERAL COMMITTEE MEETING AGENDA                                  15 MARCH 2021


TABLE OF CONTENTS

ITEM                                                                         PAGE

1      ATTENDANCE & APOLOGIES                                                   3

2      CONFIRMATION OF MINUTES                                                  3

3      PRESENTATIONS                                                            3

4      DEPUTATIONS                                                              3

5      ITEMS REFERRED FROM COMMITTEES                                           4

       1    MCU20/0119 - APPLICATION FOR MATERIAL CHANGE OF USE FOR
            SHORT TERM ACCOMMODATION AT 1/20 NANNYGAI STREET,
            NOOSAVILLE                                                          4

       2    51987.44.02 – MINOR CHANGE TO A DEVELOPMENT APPROVAL FOR
            ENTERTAINMENT AND DINING BUSINESS - TYPE 1 FOOD & BEVERAGES
            AND A RETAIL BUSINESS - TYPE 2 SHOP & SALON – 6 THOMAS STREET,
            NOOSAVILLE                                                          4

       3    NOOSA TRAIL MASTERPLAN                                              4

       4    POTENTIAL AMENDMENTS TO NOOSA PLAN 2020 RELATING TO
            HOUSING CHOICE AND AFFORDABILITY                                    4

       5    PROPOSED LOCAL LAW AMENDMENT – SHORT STAY LETTING –
            REVISED VERSION FOLLOWING PUBLIC CONSULTATION                       4

       6    DRAFT CLIMATE CHANGE RESPONSE PLAN                                  4

6      REPORTS DIRECT TO GENERAL COMMITTEE                                      5

       7    NOOSA AQUATIC CENTRE CAFE LEASE TENDER ASSESSMENT -
            T000031                                                             5

       8    NOOSA NORTH SHORE BEACH          CAMPGROUND      MANAGEMENT
            SERVICES TENDER – T000033                                           9

       9    MCU19/0114 & RAL19/0027 – APPLICATION FOR A SENIORS LIVING
            COMMUNITY, NEW COOROY GOLF CLUBHOUSE & FACILITIES AND
            BOUNDARY REALIGNMENT & ACCESS EASEMENT AT 30, 114, 122 & 144
            MYALL STREET COOROY                                                14

       10   FINANCIAL PERFORMANCE REPORT - FEBRUARY 2021                       66

7      CLOSED SESSION                                                    80




                                                                     Page 2 of 80

Section 3

GENERAL COMMITTEE MEETING AGENDA                                        15 MARCH 2021



1   ATTENDANCE & APOLOGIES




2   CONFIRMATION OF MINUTES

    The Minutes of the General Committee Meeting held on 15 February 2021 be received and
    confirmed.




3   PRESENTATIONS

    Nil.




4   DEPUTATIONS

    Nil.




                                                                            Page 3 of 80

Section 4

GENERAL COMMITTEE MEETING AGENDA                                               15 MARCH 2021


5   ITEMS REFERRED FROM COMMITTEES


    PLANNING & ENVIRONMENT COMMITTEE

    1     MCU20/0119 - APPLICATION FOR MATERIAL CHANGE OF USE FOR SHORT
          TERM ACCOMMODATION AT 1/20 NANNYGAI STREET, NOOSAVILLE
          (Planning & Environment Committee Agenda, 9 March 2021, Item 1, Page 4)
          Reason for referral – Significance of the issue


    2     51987.44.02 – MINOR CHANGE TO A DEVELOPMENT APPROVAL FOR
          ENTERTAINMENT AND DINING BUSINESS - TYPE 1 FOOD & BEVERAGES AND
          A RETAIL BUSINESS - TYPE 2 SHOP & SALON – 6 THOMAS STREET,
          NOOSAVILLE
          (Planning & Environment Committee Agenda, 9 March 2021, Item 2, Page 30)
          Reason for referral – for further consideration


    3     NOOSA TRAIL MASTERPLAN
          (Planning & Environment Committee Agenda, 9 March 2021, Item 5, Page 62)
          Reason for referral – Significance of the issue


    4     POTENTIAL AMENDMENTS TO NOOSA PLAN 2020 RELATING TO HOUSING
          CHOICE AND AFFORDABILITY
          (Planning & Environment Committee Agenda, 9 March 2021, Item 6, Page 70)
          Reason for referral – Significance of the issue


    5     PROPOSED LOCAL LAW AMENDMENT – SHORT STAY LETTING – REVISED
          VERSION FOLLOWING PUBLIC CONSULTATION
          (Planning & Environment Committee Agenda, 9 March 2021, Item 7, Page 81)
          Reason for referral – Significance of the issue


    6     DRAFT CLIMATE CHANGE RESPONSE PLAN
          (Planning & Environment Committee Agenda, 9 March 2021, Item 8, Page 127)
          Reason for referral – Significance of the issue




    SERVICES & ORGANISATION COMMITTEE
    Nil




                                                                                      Page 4 of 80

Section 5

GENERAL COMMITTEE MEETING AGENDA                                              15 MARCH 2021


6   REPORTS DIRECT TO GENERAL COMMITTEE


    7     NOOSA AQUATIC CENTRE CAFE LEASE TENDER ASSESSMENT - T000031

    Author            Community Facilities Manager, Ash Saward
                      Community Services Department

    Index             ECM/72.02 Noosa Aquatic Centre NAC

    Attachments       1.   Tender Evaluation Summary

    EXECUTIVE SUMMARY
    Not applicable.

    RECOMMENDATION
    That Council note the report by the Community Facilities Manager to the General Committee
    meeting dated 15 March 2021 and
    A. Award tender T000031 to David Evans, trading as Poolside NAC; and
    B. Award the lease agreement for an initial term of two (2) years, commencing 1 April 2021
       at a rate of $45,000 p.a. ex GST and increasing to $50,000 p.a. ex GST in year 2, with
       an option to extend for a further three (3) periods of twelve (12) months each at a rate
       of $55,000 p.a. ex GST in year 3 with CPI increases to be applicable in years 4 and 5, if
       the options are executed. The options to extend will be at Council’s discretion and
       subject to the Contractor’s demonstrated ability to meet the requirements of the lease
       agreement.

    REPORT
    The operation of the Noosa Aquatic Centre (NAC) café has been contracted out to various
    operators since 2009. The most recent lease holders elected to not seek activation of their
    extension option and ceased their operations during the Centre’s Covid-19 closure in 2020.

    Because of the operational uncertainty at the time, management deemed it was best to delay
    approaching the market for a replacement operator until early 2021. Instead, an interim
    management rights arrangement was agreed to with the café’s former manager.

    1.   Tender Process

    An invitation to tender for the operation of the NAC café was publicly advertised by Council
    via Council’s website from the 4 February 2021 and in the Noosa Today print edition on the
    11 February 2021. At tender box close on 25 February 2021, two (2) submissions were
    received, one of which was non-conforming.

    2.   Tender Assessment

    The evaluation panel carried out an assessment of the one (1) conforming tender submission
    from David James Evans, trading as Poolside NAC.




                                                                                  Page 5 of 80

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                 15 MARCH 2021


   This tender was then evaluated using the following price and non-price criteria:

   •       Price
   •       Capability and resourcing
   •       Contract experience and capacity
   •       Methodology
   •       Quality
   •       Health & safety
   •       Environment and sustainability
   •       Contribution to local economy

    Whilst Poolside NAC supplied the only confirming tender response, the panel was pleased
    with the quality of the submission and felt it was a very competitive response.

    Poolside NAC has significant local hospitality industry experience, including as a business
    operator, and is well prepared and equipped to deliver a quality café service at the NAC.
    Poolside NAC demonstrated a clear understanding of the unique contract requirements at
    the NAC and put significant thought into how best to meet the needs of patrons and Council
    alike.

    A comprehensive operations and business plan was included with the submission and this
    gave the evaluation panel a level of comfort regarding Poolside NAC’s preparedness for
    operating the café in a safe, compliant and financially sustainable manner. Given that
    Poolside NAC currently operates the NAC café under a management rights agreement, the
    transition across to become lessee will be seamless and will not result in any level of
    disruption to patrons or Council.

    Previous Council Consideration
    Nil.

    Finance
    Following award of the tender, a lease will be established for an initial term of two (2) years,
    commencing 1 April 2021 at a rate of $45,000 p.a. ex GST and increasing to $50,000 p.a. ex
    GST in year 2, with an option to extend for a further three (3) periods of twelve (12) months
    each at a rate of $55,000 p.a. ex GST in year 3 with CPI increases to be applicable in years
    4 and 5, if the options are triggered. The options to extend will be at Council’s discretion and
    subject to the Contractor’s demonstrated ability to meet the requirements of the lease
    agreement.

    The level of financial return proposed for Council is acceptable and is reflective of some
    continued uncertainty regarding the ability for the NAC to operate in an undisrupted manner
    during the life of the contract (because of potential Covid-19 restrictions).

    Risks & Opportunities
    A formal lease agreement will be established in order to provide clarity for all parties
    regarding contract expectations and obligations. NAC staff will manage the contract in
    accordance with normal management practices to ensure the contract is delivered in a
    manner acceptable to Council for the life of the agreement.

    Council will retain a bank guarantee for an amount equal to three (3) monthly rent instalments
    ($11,250 ex GST) in order to mitigate financial risk.

    The risk of not awarding tender T000031 is that the NAC will be left without a café operator
    beyond 31 March 2021.

                                                                                      Page 6 of 80

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                   15 MARCH 2021


   Consultation
   External Consultation - Community & Stakeholder
   Nil

   Internal Consultation
   Departments/Sections Consulted:

         Chief Executive Officer   X   Community Services                      X   Corporate Services
         Executive Officer         x   Director                                    Director
         Executive Support             Community Development                       Financial Services
                                   x   Community Facilities                        ICT
                                       Libraries & Galleries                   x   Procurement & Fleet
                                       Local Laws                                  Property
                                       Waste & Environmental Health                Revenue Services

         Executive Services            Environment & Sustainable Development       Infrastructure Services
         Director                      Director                                    Director
         Community Engagement          Building & Plumbing Services                Asset Management
         Customer Service              Development Assessment                      Buildings and Facilities
         Governance                    Economic Development                        Civil Operations
         People and Culture            Environmental Services                      Disaster Management
                                       Strategic Land Use Planning                 Infrastructure Planning,
                                                                                   Design and Delivery




                                                                                        Page 7 of 80

Section 8

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021




                                     Page 8 of 80

Attachment 1 — Tender evaluation summary
     NOOSA SHIRE COUNCIL Weighted Attribute Evaluation Spreadsheet - Final Evaluation
        con Te
        Conant
   No. NAME OF TENDERER  PRICE
     (Conforming Tenders Only} (excl of GST)
    1
    eT
    Bp
    CO a               (
    Se
    a
    TT
    Bp
    Sp
    op
     NON-CONFORMING TENDERS                         1
     |Hospitalityandzetail,
     Pf
                          1      2      3     4     5      6     7     3      3     10
 | amtactinorcestemenss | Ome |
                        Poolside NAC
                          Resultant Resultart Resultant Resultant Resultant Resultan: Resultant Resultant Resultant Resultant
     Evaluation Criteria   score ® score & score % score: score # score # score # score # score & score #
                           weighting weighting weighting weightirg weighting weightinc weighting weighting weighting weighting
     caabiysnesurcing | nom | aes | asso | | oe | o | om | 0 | am | 0 | oo | o | ow | © | oo | 0 | om] o | om | © | ooo
     conuacttwerencencarasty | ssw | 0 | saso | 0 | am | 0 | ooo | o | oo | 0 | oo | © | oo | o | oo | © | oo | 0 | oo | © | ooo |
     etnociony  | tem  | | rm | o | om | 0 | om | 0 | am | 0 | om | o | om | © | oo | 0 | om| 0 | om | © | 000 |
     owry     Lm         | as | oo | om | o | ooo | o | oo] 0 | ooo | © | ooo} 0 | ooo | © | ooo] 0 | ooo | © | aco |
     armasotey  |  sm  | | 400 | 0 | om | 0 | ooo | © | oo] o | om | o | oo] o | om | © | oo | o | om | © | ooo |
    fmiomenacconnis |__| © | 0 | | om |e |om| |e] [em] [em] |om| [om] » [em] » [em|
    fonmonoicatnom | ss _fuas[ «| fom| [eo] [em] |em| > fem] © fom] > fem] © lem] olen]
                                                             ee eee
 | Remmestectnctscomtnd |    po
| maarpiceetemens      | ume |
                        Poolside NAC
     Total Fees (Pc} 25% $45,000
     Average Fees (Pav) S..ssssssessseseseenes $45,000
     Price Score          100
     Normalised Price Score (Pn) 100
     Weighted Price Score (Pw)
         sere ct pice nt non pen ements pe
                                                  Page 8 of 80

Section 9

GENERAL COMMITTEE MEETING AGENDA                                             15 MARCH 2021


   8    NOOSA NORTH SHORE BEACH CAMPGROUND MANAGEMENT SERVICES
        TENDER – T000033

   Author     Property Advisor – Commercial Property, Robyn Mercer
              Corporate Services Department

   Index      ECM/ 8.04 Noosa North Shore Campground – Management Issues

   Attachments       1.   Tender Evaluation Matrix



   EXECUTIVE SUMMARY
   Not applicable.

   RECOMMENDATION
   That Council note the report by the Property Advisor – Commercial Property to the General
   Committee Meeting dated 15 March 2021 and
   A.   Award contract T000033 to 1 Eight Pty Ltd for the Noosa North Shore Beach
        Campground Management Services for an initial five (5) year period commencing 1
        April 2021; and
   B.   Authorise the Chief Executive Officer to exercise future options to extend the contract
        for a further 1 x 2 year period subject to satisfactory performance at Council’s sole
        discretion.



   REPORT
   1.   Background
   The Noosa North Shore Beach Campground is located at 240 Wilderness Track, Noosa
   North Shore. The Campground is a Council business activity and is operated on a
   commercial basis to ensure the competitive neutrality principles required under the Local
   Government Act 2009 are complied with. The site has a premier beachfront location and
   offers a range of powered and unpowered accommodation options for caravans, camper
   trailers, vans and tents. The management of the campground has been outsourced (similar
   to Council’s other 2 holiday parks) since 2014.
   The current interim management agreement has been in place since October 2020 (the
   previous incumbents Beachfront Caravan Park Pty Ltd discontinued service provision on 30
   September 2020). The management agreement requires delivery of a scope of services to
   undertake the majority of operational and day-to-day activities and to operate within
   contractual parameters. The current management fee structure includes compensation via a
   fixed price arrangement with an incentive program from revenue generated by the
   Campground.
   Council also currently undertakes various operational and asset management activities at
   the Campground, including capital works and maintenance, contract administration,
   provision of supplies as required by the terms and conditions of the management agreement,
   and environmental and asset management responsibilities.
   The current management agreement is due to expire on 31 March 2021.




                                                                                 Page 9 of 80

Section 10

GENERAL COMMITTEE MEETING AGENDA                                                  15 MARCH 2021


   2.     Invitation to Tender
   In January 2021, Council issued invitations to tender for the management of the
   Campground.
   Consistent with Council’s tender processes, the following documents were available to
   respondents via the e-portal:
   •      Invitation to Tender – general information for respondents;
   •      Tender Response Form – enabled respondents to respond to evaluation criteria via
          response schedules;
   •      Management Agreement – identified management agreement conditions to perform
          the contract and specifically a five year contract commencing on 1 April 2021 with an
          option to extend for an additional 1 x 2 years at Council’s sole discretion;
   •      Conditions of Tender – Detailed acceptable conduct and obligations of respondents
          and Council and included further detailed information for respondents; and
   •      Proposed budget - enabled respondents to detail revenue and expense items to
          manage the Campground in accordance with the management agreement contract
   Prospective tenderers were invited to attend an industry briefing and site inspection on
   Monday 8 February 2021 at the Campground. They were given the opportunity to inspect the
   facilities, including the residence, amenity facilities and key infrastructure, in addition to
   asking questions and seeking clarification from Council representatives.
   Tenderers were required to submit a commission percentage (of the earned revenue of the
   caravan and camping sites) as the proposed variable annual management fee to supplement
   a fixed annual management fee. The intent of this approach is to allow tenderers to
   demonstrate their understanding of the site’s operational cost base, their expectations
   around earnings and to exhibit their business and financial acumen. The tender
   documentation noted that there is no applicable rise and fall provision for the variable
   management fee, with the commission percentage to remain fixed for the duration of the
   contract.
   The evaluation panel assessed the applications under probity and due diligence in
   accordance with the assessment criteria and its obligations under this tender process. The
   evaluation panel consisted of:
   •      Property Manager
   •      Property Advisor – Commercial Property
   •      Property Officer
   •      Economic Development Manager
    3.    Submissions
    The tender closed on 19 February 2021, with Council receiving two (2) conforming
    submissions as follows:
    1.   1 Eight Pty Ltd;
    2.   Belgravia PRO Pty Ltd

    4.    Evaluation
    The evaluation criteria established as part of the invitation to tender included:
    1.    Price
    2.    Capability & Resourcing;
    3.    Contract Experience & Capacity;
    4.    Methodology;
    5.    Quality;
    6.    Health & Safety;
    7.    Environment & Sustainability; and
    8.    Contribution to Local Economy.

                                                                                        Page 10 of 80

Section 11

GENERAL COMMITTEE MEETING AGENDA                                                   15 MARCH 2021


   The schedules and supporting information provided by the tenderer were reviewed by the
   evaluation panel and informed the scoring in each of the aforementioned evaluation criteria.
   Scoring within the criteria included an appropriate weighting on financial viability and
   demonstrated business acumen given the value of the contract and the associated risk. As
   part of the evaluation, financial analysis of the proposed operational cost base and
   commission percentage submitted by each tenderer was undertaken and used to inform
   scoring, including NPV analysis, sensibility and sensitivity testing of tendered financial
   estimates.
   The preferred tender was submitted by 1 Eight Pty Ltd. Their tender scored highly for track
   record experience, capacity and methodology which are critical criterion for effective and
   innovative management, and business continuity. A five (5) year contract is recommended
   commencing on 1 April 2021 with an option to extend for an additional 1 x 2 years at Council’s
   sole discretion.

   Previous Council Consideration
   Ordinary Meeting Minutes, 17 September 2020, Item 5, Page 18
   That Council note the report by the Property Advisor Commercial Property to the General
   Committee Meeting dated 14 September 2020 and:
   A.      Authorise the CEO to enter into an interim management agreement for the Noosa North
           Shore Beach Campground with 1Eight Pty Ltd for 6 months commencing 1 October
           2020 with an additional 1 x 1 month extension option at Council’s sole discretion;
   B,      Apply the exception to the requirement under Section 235 (a) of the Local Government
           Regulation 2012 for entering into a contract for goods and services without first inviting
           written quotes or tenders if satisfied that there is only 1 supplier who is reasonably
           available; and
   C.      Further, staff undertake a detailed induction of the new manager to identify the key
           environmental attributes and sensitive sites and to outline visitor management
           expectations to ensure the park and adjoining dunal system is managed in line with
           environmental best practice.
   Finance
   Profits generated from the campground are utilised to offset general rate increases and
   assists Council in complying with its Financial Sustainability Policy compliance.
   Risks & Opportunities
   Risks
   Effective management services at the campground are required to ensure business
   continuity, and ensure that financial performance meets and exceeds budget targets. Failure
   to secure a competent service provider could result in reputational and financial degradation.
   Opportunities
   Award of a new management agreement allows Campground operations to continue in the
   post-redevelopment phase and Covid-19 closure period without a break in business
   continuity.
   Award of a new management agreement aligns with Theme 5 of Council’s Corporate Plan –
   Excellence as a Council – Maximise financial opportunities for Council land holding for the
   purpose of maximising non-rate revenue.

   Consultation
   External Consultation - Community & Stakeholder
   Nil.

                                                                                     Page 11 of 80

Section 12

GENERAL COMMITTEE MEETING AGENDA                                                 15 MARCH 2021



   Internal Consultation
   Director Corporate Services
   Procurement Manager
   Procurement Advisor
   Property Manager
   Property Officer

   Departments/Sections Consulted:

       Chief Executive Officer       Community Services                      X   Corporate Services
       Executive Officer             Director                                X   Director
       Executive Support             Community Development                       Financial Services
                                     Community Facilities                        ICT
                                     Libraries & Galleries                       Procurement & Fleet
                                     Local Laws                              X   Property
                                     Waste & Environmental Health                Revenue Services

       Executive Services        X   Environment & Sustainable Development       Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                    Page 12 of 80

Section 13

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021


                                                    Attachment 1




                                    Page 13 of 80

GENERAL COMMITTEE MEETING AGENDA               15 MARCH 2021

        NOOSA SHIRE COUNCIL _ Weighted Attribute Evaluation Spreadsheet - Final Evaluation Attachment 1
  | Somtrmetne:    freon
                      ne
         conforming Tenders Only) {excl of GsT)
       at
       ee
       Sf
       Cf
       TL
       et
       st
       oO
        NON-CONFORMING TENDERS

                    se        es
        speci anesouring | se | oo | | em | 2 | om | © | om | o | om | © | om | © | om] © | om | o | om |
       Kontmcttapenence mcapacty | ase | sas | azae | ao | zoo | 2 | oo | o | om | © | oo | o | om | © | a | o | ow | © | one |
        pectocoony || | me | om | eo | oo | om | o | om | o | oo | eo | ow] 2 [om] eo | ow | 2 | om |
       oy        CT         | tm | i | ee | oo | om | © | om | © | om | © | ow | o | om | © | ow | o | ome |
        pemmasey TT | oe | | oe | oo | om | oo | om | o | om | oe | om |[ o | om eo | om] eo | om |
        emiroamentasectinatity | | | em | | ee | o | om | oe | om [ o | om |e [om | eo | om] © | om | 2 | om |
        Kentioutontotocn economy | ss | | aus | vee | zaz | o | om | 0 | om | 0 | om | o | om| © | om| © | om] o | om |
       fettrecnnitscore | mT ee Tees | oe] me] om             |            le
    | Mermatcea Tec Score tm)         pO
   | tamneckeement =| twnerytte semronormryne | | CE CT CdS        Cd    Cd
         Fees (Pc)    30%  $321,230 $321,230                      so          $0
         erage Fees (Pav) S$ $321,250
         ce Score           100    100                            °           3
           Price Score (Pn) 100    100                            °           °
           Price Score (Pw)
     | eeserectpriceentnonpeicectemens PT
      [Contract Administrator & AsseomentPenci Member | ___ Property Acvaer cCommercmiPropeny | ana weightings of the evoiwation Lie
   [Assesment PaneiMemberé | Propertyoricer
                                                Page 13 of 80

Section 14

GENERAL COMMITTEE MEETING AGENDA                                                   15 MARCH 2021


   9     MCU19/0114 & RAL19/0027 – APPLICATION FOR A SENIORS LIVING
         COMMUNITY, NEW COOROY GOLF CLUBHOUSE & FACILITIES AND
         BOUNDARY REALIGNMENT & ACCESS EASEMENT AT 30, 114, 122 & 144
         MYALL STREET COOROY

   Author              Coordinator Planning, Patrick Murphy
                       Environment and Sustainable Development Department

   Index               ECM/ Application/ MCU19/0114 and RAL19/0027

   Attachments         1.   Proposal    Plans    – Seniors       Living   Community (23 page
                            attachment provided separately to this agenda)
                       2.   Proposal Plans – Golf club house and buggy store
                       3.   Proposal Plan - Indicative Golf Course Master Plan
                       4.   Earthworks Plan
                       5.   Infrastructure Agreement (44 page attachment provided separately
                            to this agenda)
                       6.   Approved SARA plan - Myall Street


    APPLICATION DETAILS
    Applicant                       GTH Projects No. 4 Pty Ltd
    Proposal                        Material Change of Use – Entertainment & Dining Type 2
                                    Recreation amusement fitness (Cooroy golf clubhouse), Multiple
                                    Housing - Type 3 Retirement and Special Needs (Seniors Living
                                    Community), and Reconfiguring (Boundary Realignment &
                                    Access Easement)
    Properly Made Date              12 September 2019
    Information Request Date        18 October 2019
    Information Response Date       6 May 2020
    Decision Due Date               9 March 2021
    Number of Submissions           396 – 346 in support, 48 objections and 2 impartial
    PROPERTY DETAILS
    Property Address                30, 114, 122 & 144 Myall Street COOROY Qld 4563
    RP Description                  Lot 33 MCH 2281
                                    Lot 1 SP 115864
                                    Lot 2 SP 115864
                                    Lot 3 SP 115864
    Land Area                       16.334ha
                                    12.6ha
                                    2.2ha
                                    7.03ha
    Existing Use of Land            Golf course and undeveloped rural land
    STATUTORY DETAILS
    SEQRP Designation               Urban Footprint
    Locality                        Cooroy and Lake Macdonald




                                                                                      Page 14 of 80

Section 15

GENERAL COMMITTEE MEETING AGENDA                                                    15 MARCH 2021


    Zone                              Noosa Plan 2006
                                      Open Space Recreation and Rural
                                      Noosa Plan 2020
                                      Recreation and Open Space and Rural Residential
    Overlays                          Noosa Plan 2006
                                      Biodiversity Overlay: Environmental Protection Area and
                                      Riparian Buffer
                                      Natural Hazard Overlay: Bushfire
                                      Natural Resource Overlay: Water Supply Catchment
                                      Noosa Plan 2020
                                      Biodiversity, Waterways and Wetlands Overlay: Area of
                                      Biodiversity Significance, MSES Regulated Vegetation and
                                      Riparian Buffer
    Assessment Type                   Impact

   EXECUTIVE SUMMARY
   The application seeks approval for a seniors living community of 246 dwelling units. It is also
   proposed to reconfigure the site’s lot boundaries such that part of the seniors living
   community will be located on the golf course land.
   To support the proposed development’s conflict with the planning scheme the applicant
   proposes to construct a new golf club house, associated car park and buggy/cart store, pay
   the membership for each resident within the seniors living community for 10 years and make
   a financial contribution to the golf course for course improvements. The delivery of these
   works and financial contributions to the Cooroy Golf Club are to be facilitated through a
   proposed Infrastructure Agreement.
   The site is zoned Rural and Open Space Recreation and under the Noosa Plan 2006 the
   land is intended to be appropriately managed and protected such that the scenic and
   environmental values, the distinct rural amenity and agricultural productivity are preserved.
   For that part of the site zoned Open Space Recreation, the land is to intended to be
   maintained for recreational activities for the community.
   The application raises concern due to the proposed development’s inconsistency with the
   planning scheme’s zoning intent and the application has not demonstrated that there is a
   planning need for the proposed development. The following concerns are also raised with
   the proposed development:
   •       The proposed development seeks to use Rural and Open Space Recreation zoned
           land for Multiple Housing which is an inconsistent use in these zones.
   •       The proposed development is for a high density residential development outside the
           identified Urban Growth Boundary.
   •       The proposal will have a detrimental impact on the scenic vista from the major road
           network and the entry into Cooroy township and will not appear as a logical extension
           to the Cooroy township.
   •       The proposed built form and landscaping is not consistent with the preferred character
           within Cooroy and will result in an appearance of excessive bulk, limited landscaping
           and continual roof form.
   •       The proposal will result in the removal of significant vegetation and intrude significantly
           into the site’s riparian buffer.
   •       Significant earthworks are proposed to accommodate the development, up to a
           maximum depth of approximately 4.5m.
   •       The application proposes development within the Water Supply Catchment which may

                                                                                      Page 15 of 80

Section 16

GENERAL COMMITTEE MEETING AGENDA                                                15 MARCH 2021


        result in adverse effects on the quality of water entering Lake Macdonald.
   •    The proposed development will impact on good agricultural land.
   •    It has not been demonstrated how potential noise impacts resulting from the new golf
        club house will be appropriately mitigated.
   •    Insufficient visitor car parking spaces are proposed and are not appropriately located
        on site whilst a one way roadway of insufficient width is also proposed.
   Furthermore, the Infrastructure Agreement provided by the applicant does not satisfactorily
   secure the delivery of the proposed works/financial contributions to Cooroy Golf Club and
   requires amendment.

   RECOMMENDATION
   That Council note the report by the Coordinator Planning, to the General Committee Meeting
   dated 15 March 2021 regarding Application MCU19/0114 and RAL19/0027 for a
   Development Permit for Material Change of Use – Entertainment & Dining Type 2 Recreation
   amusement fitness, Multiple Housing - Type 3 Retirement and Special Needs (Seniors Living
   Community) and Reconfiguring a Lot (Boundary Realignment and access easement)
   situated at 30, 114, 122 and 144 Myall St Cooroy and:
   A.   Refuse the application for the following reasons:
        1.    The proposal is not consistent with SEQ Regional Plan as the development would
              result in a high density residential development within an area which contains
              ecological vales and is not included with the planning schemes urban growth
              boundaries.
        2.    The proposed development is contrary to State Planning Policy as it will
              irreversibly impact on good agricultural land.
        3.    The proposed development is not consistent with Desired Environmental
              Outcomes of the Noosa Plan 2006 as the proposal will adversely impact on good
              agricultural land, is at odds with the expected rural character and amenity of the
              area and is more suitably located within the urban growth boundary. The proposal
              will also result in the loss of land intended to accommodate recreational activities
              for the community.
        4.    The proposed development is inconsistent with the Noosa Plan’s Strategic
              Framework as the proposed development will not conserve land for agricultural
              purposes and will result in development inconsistent with the rural character and
              amenity of the locality.
        5.    The proposed development is not consistent with Overall Outcomes 6.7.2 a) (i)
              and (iv), c), d), r), s), y), cc), gg), rr) and ss) and Specific Outcomes O1, O3, O7,
              O8, O9, O10, O15, O18, O19, O20, O25, O27, O81, O82 and O88 of Cooroy
              and Lake Macdonald Locality Code as:
              i.     It results in high density residential development outside of the Urban
                     Growth Boundary which is not consistent with the Priority Infrastructure
                     Plan.
              ii.    It utilises Rural zoned land for the purpose of Multiple Housing which is an
                     inconsistent use in the zone with the land intended to be maintained for its
                     rural character and use for agricultural.
              iii.   It utilises Open Space Recreation zoned land for the purpose of Multiple
                     Housing which is an inconsistent use in the zone with the land intended to
                     be used for recreational purposes.
              iv.    It utilises rural land intended to be protected and managed to preserve the
                     scenic and environmental values of the area.
                                                                                   Page 16 of 80

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                15 MARCH 2021


            v.      It does not preserve agricultural land, conserve open space for biodiversity
                    and water quality purposes or provide development at a density consistent
                    with the sites environmental constraints and proximity to the Lake
                    Macdonald water supply catchment.
            vi.     The development does not minimise cut and fill and is excessive.
            vii.    The development results in adverse impacts on the sites environmental
                    values.
            viii.   The development has the potential to impact on water quality of Lake
                    Macdonald.
            ix.     The proposal will result in a detrimental impact on the scenic vista from the
                    major road network and the entry into Cooroy township.
            x.      The proposed built form does not complement traditional streetscape and
                    building forms.
            xi.     The height of club house will dominate surrounding spaces and the existing
                    skyline.
            xii.    Parts of the development are located too close to Myall Street and are not
                    consistent with the streetscape.
            xiii.   The excessive site cover results in excessive bulk and development which
                    is not compatible with surrounding development.
            xiv.    The development has the potential to impact on the acoustic amenity of the
                    surrounding area, as no acoustic measures are proposed to be
                    implemented for the new golf club house.
       6.   The proposed development does not comply with Overall Outcomes 14.44.2 a),
            b) and j) and Specific Outcomes O16 and O17 of the Residential Uses Code as:
            i.      It is proposed on land that is not suited to the development of residential
                    buildings;
            ii.     It is not consistent with the character of the neighbourhood;
            iii.    It does not maximise the use of the natural topography and minimise the
                    need for cut and fill; and
            iv.     It is not located within reasonable proximity to a variety of essential
                    services.
       7.   The proposed development fails to meet Overall Outcomes 13.7.2 a), b), c), d)
            (i), (ii), (iii) and (v), e) and g) and Specific Outcomes O1, O3, O4, O5, O6, O8,
            O9, O10, O14, O15, O18 and O19 of the Biodiversity Overlay Code as the
            proposal will result in the removal of significant vegetation and intrude into the
            site’s riparian buffer.
       8.   The proposal does not comply with Overall Outcomes 14.157.2 a) an b) of the
            Water Sensitive Design Code as the development:
            i.      is not designed and could not be constructed in a manner that does not
                    impede, long term attainment of relevant Environmental Values and Water
                    Quality Objectives as specified in the Environmental Protection Policy
                    2009;
            ii.     proposes infrastructure within the riparian zone and an extent of cut and fill
                    that is likely to create adverse impacts on downstream ecosystems,
                    properties and infrastructure due to changes to stormwater flow, water
                    quality or ecosystem health.


                                                                                    Page 17 of 80

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                   15 MARCH 2021


        9.    The application proposes development within the Water Supply Catchment which
              may result in adverse effects on the quality of water entering Lake Macdonald
              contrary to Specific Outcome O11 of the Natural Hazards and Natural Resources
              Overlay Code.
        10.   The proposal does not comply with Overall Outcome 14.111.2 (c) and Specific
              Outcome O7 of the Driveways and Car Parking Code as:
              i.     Sufficient visitor parking is not provided and appropriately located for
                     visitors of the Retirement and Special Needs use; and
              ii.    Sufficient parking is not provided for the golf club house.
        11.   The proposal does not comply with Overall Outcome 14.111.2 (c) and Specific
              Outcome O8 of the Driveways and Car Parking Code and Specific Outcome O7
              and O36 of the Residential Uses Code as internal driveways are too narrow to
              satisfactorily accommodate internal traffic movements.
        12.   The proposed built form and landscaping is not consistent with the preferred
              character within Cooroy and will result in an appearance of excessive bulk,
              limited landscaping and continual roof form.
        13.   Noosa Plan 2020 has identified that it can meet the requirements for residential
              accommodation until 2041 within the current Urban Growth Boundary. The
              application has failed to demonstrate a significant planning need to develop
              outside of these boundaries, nor any overriding community benefit which would
              justify approving the development despite its conflict with the Planning Scheme
              and relevant State Planning Policies.
        14.   In preparing the Noosa Plan 2020 and in reviewing submissions pertaining to this
              property Council considered the development potential and suitability of this site
              and it was considered that despite its inclusion within the Urban Footprint of the
              SEQ Regional Plan, commitment of the land for urban purposes was neither
              necessary nor appropriate.
        15.   The proposal is not consistent with the provisions of the Noosa Plan 2020 which
              seek that the land is developed for rural residential purposes.
        16.   The proposal does not comply with the overall outcomes sought by the
              Biodiversity, Waterways and Wetlands overlay code in Noosa Plan 2020 as the
              development:
              i.     is not designed, sited, nor could it be constructed in a way that avoids
                     adverse impacts on ecologically important areas, ecological systems and
                     processes.
              ii.    does not propose to conserve, manage, enhance and nor rehabilitate to
                     protect and improve biodiversity, ecosystem health, landscape stability and
                     resilience of ecological linkages and riparian vegetation
              iii.   is not designed nor propose a layout that provides for the protection and
                     establishment of appropriate buffers to waterways, wetlands, native
                     vegetation and significant fauna habitat.
              iv.    does not protect and enhance the terrestrial and aquatic native flora and
                     fauna and their habitats
              v.     does not propose landscaping for the rehabilitation of ecologically
                     important areas, degraded ecosystems and habitats to achieve a functional
                     and healthy ecosystem state that requires minimal human intervention.
   B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.



                                                                                    Page 18 of 80

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                15 MARCH 2021


   REPORT
   1.    PROPOSAL
   The application proposes to develop an over 50’s seniors living facility in the form of 246
   dwelling units and associated communal facilities in five stages on land which is within the
   Rural Zone and Open Space Recreation Zone. The applicant has applied for this use as a
   Multiple Housing Type 3 Retirement and Special Needs (Seniors Living Community).
   The application also proposes to construct a new club house, associated car park and a
   buggy/cart store for the Cooroy Golf Club situated on land within the Open Space Recreation
   zone. The club house will be in a different position to the existing club house and will result
   in modification and relocation of several holes. A Material Change of Use application for
   Entertainment & Dining Type 2 (Recreation amusement fitness) has been made for this new
   cub house.
   A sales showroom for the seniors living facility is proposed adjacent to the Myall Street front
   boundary and is to be accessed off the proposed new driveway/internal road. A three
   bedroom manager’s unit is also proposed at the eastern end of this new internal road.
   The dwelling units comprise 3 different design options, each with 3 roof form options. The
   dwelling options and associated bedrooms/bathroom/car parking details are as follows:




   The communal facilities are to include a club house, summer house, residence workshop,
   tennis court, bocce green, swimming pool, recreational open space areas, visitor parking
   areas and an RV compound parking area.
   It is proposed that the development be undertaken in stages generally as follows:
   •       Stage 1 – Main entry road, sales showroom, managers residence, club house and
           resort recreational facilities, bocce green and 46 dwelling sites;
   •       Stage 2 – 51 dwelling sites and emergency access to Myall Street / Nandroya Street
   •       Stage 3 – 41 dwelling sites;
   •       Stage 4 – 46 dwelling sites;
   •       Stage 5 – 62 dwelling sites, and manager’s workshop and summer house.
   With regards to the delivery of works to the golf course including the construction of the new
   golf club house and facilities, the applicant has advised that the works will be delivered in
   conjunction with Stage 1 of the GemLife development via an Infrastructure Agreement. To
   also secure the delivery of the works GemLife have proposed a bond 1.07 times the value of
   the works ($9,375,000). Financial contributions are also proposed to be made to the Cooroy
   Golf Course Club.
   Access and egress to the seniors living community and new golf club house is proposed from
   Myall Street, approximately 260 metres north of the existing roundabout, and the internal
   road network would be privately owned. An emergency access point is proposed
   approximately 90 metres north of the roundabout. A total of 32 visitor parking spaces are
   proposed for the seniors living community and each dwelling contains a double garage.
                                                                                  Page 19 of 80

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                      15 MARCH 2021


   A landscape buffer for the seniors living community, which is generally 10 metres wide
   though narrowing to the southern extent of the site to approximately 2.0 metres, is proposed
   to Myall Street whilst a 3 metre landscape buffer is provided to the eastern and southern
   common boundaries with the golf course. Bulk earthworks for the site include an extensive
   cut area across the majority of the elevated area, up to maximum depth of approximately 4.5
   metres. Filling of the lower lying ground in the north and south is expected to be generally 1
   to 4 metres in height, although in areas adjacent to the proposed bio-basins, it is noted that
   retained embankments may range from 3 to 5 metres. The proposed earthworks include
   filling a significant area within the site’s identified Riparian Buffer.
   The following images provide detail of the proposed development with additional proposal
   plans and the Infrastructure Agreement included at Attachments 1, 2, 3, 4 and 5.




                    Figure 1: Indicative seniors living facility layout perspective




                              Figure 2: Seniors living facility site plan


                                                                                       Page 20 of 80

Section 21

GENERAL COMMITTEE MEETING AGENDA                                                 15 MARCH 2021




                    Figure 3: Seniors living facility staging plan




                  Figure 4: Seniors living facility club house (artist impression)




                                                                                     Page 21 of 80

Section 22

GENERAL COMMITTEE MEETING AGENDA                                                     15 MARCH 2021




            Figure 5: Seniors living example of dwelling styles (artist impression




                                                                                      Page 22 of 80

Section 23

GENERAL COMMITTEE MEETING AGENDA                                15 MARCH 2021




                     Figure 6: Golf course master plan (part)




                                                                 Page 23 of 80

Section 24

GENERAL COMMITTEE MEETING AGENDA                                                  15 MARCH 2021




                       Figure 7: Golf course club house (artist impression)

   The boundary realignment component of the application involves the cancelling of lots 1, 2
   and 3 on SP 115864 and the creation of 2 new lots as detailed in the following table:
           Reconfiguring a Lot (Boundary Realignment)
    Existing Lot Area             Lot 1 SP 115864 – 12.6ha
                                  Lot 2 SP 115864 – 2.229ha
                                  Lot 3 SP 115864 – 7.033ha
    Proposed Lot Area             Proposed Lot 4 (cancelling Lot 2 & 3) – 11.08ha for seniors
                                  living community
                                  Proposed Lot 5 (cancelling Lot 1) – 10.77ha for golf course
   An access easement is proposed over the proposed entrance driveway to the seniors living
   facility and to the new clubhouse which will burden proposed lot 4 and benefit proposed lot
   5.
   As a consequence of the boundary realignment, the dwelling units and associated facilities,
   with the exception of the storm water bio-basins, will be located within proposed lot 4. The
   boundary re-alignment results in 1.83 hectares of the golf course land, which is zoned Open
   Space Recreation, being used for the development of the seniors living facility.
   The current and proposed lot arrangement are detailed in the following images.




                                                                                     Page 24 of 80

Section 25

GENERAL COMMITTEE MEETING AGENDA                              15 MARCH 2021




                          Figure 8: Current lot layout




                    Figure 9: Proposed boundary realignment


                                                               Page 25 of 80

Section 26

GENERAL COMMITTEE MEETING AGENDA                                                  15 MARCH 2021


   The application was supported by a range of supporting material including:
   •    Town Planning Report
   •    Acoustic Report
   •    Traffic Engineering Report
   •    Geotechnical Investigation Report
   •    Ecological reports
   •    Engineering Services Report
   •    Bushfire Hazard Assessment and Management Plan
   •    Economic Need Assessment
   •    Community Needs Assessment
   •    Infrastructure Agreement
   •    Unitywater Decision Notice
   It is the applicant’s position that the proposal provides for the following community benefits,
   a number of which are proposed to be delivered via an Infrastructure Agreement between
   Council and the applicant.
   Supporting the viability of an important community sports club (the Cooroy Golf Club)
   The Cooroy Golf Club is an important community use which has been experiencing financial
   hardship as a result of a declining membership base.
   GemLife agree to be bound by an Infrastructure Agreement that will deliver a number of
   financial and social benefits to the Cooroy Golf Club in an effort to make sure the club stays
   viable into the future. A summary of these committed benefits is provided below:
   a)    Guaranteed membership boost – Guaranteeing 1 golf membership per new dwelling
         in the GemLife resort for a period of 10 years.
   b)    New clubhouse facilities – Construction and fitout of a new golf clubhouse with a
         dedicated pro shop, restaurant, café, function room, outdoor deck and terrace area.
         This clubhouse has been designed to accommodate weddings and functions so that
         the club will have the ability to generate supplementary income from such events (in
         addition to golf course activities).
   c)    New and safer access – Safer vehicle access to the golf course and clubhouse via a
         new private road and associated access rights. This is a significant improvement upon
         the existing access and car park from Myall Street.
   d)    New and larger car park – A new car park with 97 dedicated car spaces to cater for
         patrons of the golf course and clubhouse (significantly more than the current car park
         capacity).
   e)    New golf buggy storage facilities – A new golf buggy storage shed with space for
         the permanent storage of 40 carts.
   f)    Modifications to golf course – Reconfiguring the golf course to maintain 18 holes
         whilst accommodating a newly re-located club house, car park and associated access.
   Promoting synergy between the golf course and GemLife retirement resort – GemLife
   are committed to promoting a genuine synergy between the Golf Club and the retirement
   resort. The benefits of co-locating retirement living with other land uses is well documented
   as being a positive impetus for social interaction and inclusion. The GemLife community will
   result in a population of around 500 people on the doorstep of the golf club, many of whom
   will take advantage of their included membership by taking up the sport or taking advantage
   of the dining / leisure opportunities available in the clubhouse. GemLife is optimistic that this
   development will re-enliven the club’s membership base and result in improved social
   opportunities for both Golf Club members and GemLife Residents.


                                                                                    Page 26 of 80

Section 27

GENERAL COMMITTEE MEETING AGENDA                                                    15 MARCH 2021


   Responds to the need for age specific housing – The need to provide housing for an
   ageing population within the shire is well documented; in particular, by the Housing Needs
   Assessment prepared by Briggs and Mortar for Noosa Council in 2017. This report identified
   a need for additional retirement dwellings (particularly smaller and more affordable dwellings)
   to be provided within the shire to meet the needs of an ageing population. The proposed
   development stands to provide a direct response to this housing need by delivering 246
   retirement living (resort style) dwellings with access to complementary whole of life ‘ageing
   in place’ services to cater for residents of Cooroy and the surrounding area.
   It is noted that land opposite the site at 125 Myall Street, Cooroy (Lot 4 SP248479) is
   proposed to be zoned ‘Community Facilities’ for a Residential Care Facility under the new
   Draft Scheme. We consider the proposed re-zoning of 125 Myall Street to an urban zoning
   is a sensible planning decision as it represents a logical continuation of urban development
   existing further to the north. However, we consider that designation of the whole site for aged
   care purposes does not make practical sense as an aged care facility only requires around
   6000-8000sqm of land area whereas the site is 6.665 hectares in size and a large balance
   area would be left over with no certain land use outcomes.
   The proposed GemLife site is considered more appropriate to deliver the retirement / ageing
   in place services intended by the housing needs assessment due to the co-location benefits
   stemming its co-location next to the complementary land use activity (i.e. the golf course)
   and 125 Myall Street, would be more appropriately located in a conventional urban zoning.
   Ageing in place services offered – The proposed development will deliver an ageing in
   place solution by virtue of GemLife’s partnership with Prescare who are a not for profit
   provider of aged care support services. Residents of the Cooroy GemLife community will
   have access to the services offered by Prescare which include: in home care, in home
   nursing, assisted shopping, transport to appointments and social events, rehabilitation and
   physical therapy, respite care, dementia services, pastoral and spiritual care, food and meal
   services, mobility equipment. This partnership between Prescare and GemLife is significant
   as it provides an ageing in place solution that will allow residents to be accommodated in
   their homes within the GemLife community for a much longer time before the possibility of
   having to transition into high care. Therefore, whilst the proposal is not for a high care facility,
   it does deliver retirement living with ageing in place solutions which are needed in the Cooroy
   area.
   Assist in maintaining viability of township services – The retention of this segment of
   the population within Cooroy assists in ensuring the ongoing viability of services and facilities
   in Cooroy (such as local shops, community uses and medical services). Ensuring a critical
   population mass within the Cooroy township means that there is less risk of key community,
   retail and medical services being re-located to larger centres.
   Employment generation – The proposed development stands to provide economic stimulus
   for the Cooroy township by stimulating employment during construction and providing
   employment opportunities during the ongoing operation of the facility (such as on site
   management, grounds keeping and cleaning). This is considered to be an even more
   pertinent consideration in light of the current economic turmoil created by COVID-19 and the
   developer is committed to commencing the development as soon as approvals are obtained.
   The following images provide a locality plan, details of the land parcels subject to the
   application and the applicable zoning.




                                                                                       Page 27 of 80

Section 28

GENERAL COMMITTEE MEETING AGENDA                     15 MARCH 2021




                          Figure 10: Locality Plan




                                                      Page 28 of 80

~    S®         ORE SEN V7                                EST                 .                         @
                                                          Pane «SE   EP      Pe Nigel      has ot   DOr Nie race ested FC tas:              ee           a       z
                                        ‘                 ‘a         i          .       .      ery                 ieee (5)  ‘        :      %           5
                                                                .  yey 2  7              ot af ar 2       o, i . a  Oak St :         wd            is     ,
                                                              -      S ob *         ;    ; »   2. or      é Sond      anv:   reet? a                 |
                                         sf                    eS       asse      Ps   %: OOF)        eG.         et     hg ae ee esd) MEL         Fs            a
                                        ~s                    i Ou amas         Far    ON ae         samt son oar (=) Ws      ic    hy RE           a            QO
                                        res Roa              teas CNM      ae                          eer Phir aes) |                                           5
                                         4      Ss                 R    op   Ps ss h    coy            F a        cr pS aa   ois   7    = 4        Sh oe
                                         4      oe                3     ge ug Sah                    ye       DPE era hy ey            an         NES  SS        =|
                                        Pl      .   ;     Pre         5   ¥ Ries Oa              i  > ata    . P ae          ne te ta Po fo a           ay       mm
                                         ‘Tsien          Fa      water ge    he ie                i x *        Boas AS in ome cee   bee eh         na            m
                                        i       /     Ge             ee hte         eye!       Bree ee         .    “he a ee           aga                       =
                                        hae |                                      age P28           et We a     Deh aee                  <      Me
                                        ‘ -              ~      dl Fg                 ,  oot            es       ag  $2    [Daas he =y90)\S WS} ¥ |              a
                                      nl  R       ry           A   :                                           .  OO, 4p = yal        BM ee ee |        ind      z
                                      o| =          a      et     Pe             +.                       :      NO ggg   tg et at RS LS we.                     @
                                      =   pag             pao                   .                               coy emt          oe Rebels    awa
                                      a   1     f  & 2" ae es oo                      +                q          ‘       A   fie ch   a 7     Ae                >
                                      oe         fF       DS     k =                ,           ;      ee        :        tak          rena) oh           ee     @
                                      Sf   a 0        Rr  re     A                      >          oe                 =?    AaUrI Street a ee        eT bE       fm
                                      ~iee       .       ‘a                            5                             *   ™       =f | amet Adee eae e =:
                                      877.)            he                                           :             ts a Kauri Lane igi          >.     men        5
                                      © Fie           ae  es                                                     pS    anaes         died sit “Gin A) Fees       >
                                      z A   QO Sf       ;      :                :                                                           toy   tee. CS Ge
                                      De Oi                   oe               en                           G)                         ;      eT 78 3
                                      3                &                                                     oO                    Bie.       Ses     (7
                                            Sh       we.          ore                  .        aie          Oo
                                            Q        #                                            Mee        a                                          '
                                           Sa          eS                a   2         :             jy      iW
                                                                         =                         We                              .    OPN          EN
                                        '      ,                         8 3                  :     Raed        Ui         nN AC            aan           ;
                                                rn                       SB Sse                           77 =                      SS         F          3
                                        ‘OD Sa eb                        S                       zt         LEE                            St
                                        se              ae               mp               .                   Wi           aa  J      Se      ape     ean
                                           Wy         pee                2 @            ie,          tee  Wind cra                                 res
                                         ae      a       we                                 ~                       ie                            Se Dee
 2                                      __           eee                  mo ao               mye ra               ty       4                       a
8                                                           ,            Se                        ee             Ye                              y
 °                                                                       3       i       ;                      ELLY      .         er:          a *    ,        nn
 &                                                                       “        Sek N                                .                         es
co                                                                =               Nee        n                                               ne         ‘A       =
 2                                                                                    oan 8e;                                                                    >
 “h                                         SS!                     rt               .     ae                                   Cpe       é       ao             >]
                                                                    ree                      '                                  CM,       7
                                                                                                                                                                 N
                                                                                                                                                                 8
                                                                                                                                                                 —_

Section 29

GENERAL COMMITTEE MEETING AGENDA                                  15 MARCH 2021




                    Figure 11: Lots included in the application




                                                                   Page 29 of 80

Section 30

GENERAL COMMITTEE MEETING AGENDA                                   15 MARCH 2021




                   Figure 12: Applicable Zones (Noosa Plan 2006)




                                                                    Page 30 of 80

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                 15 MARCH 2021


   2.   SITE DETAILS
   2.1. Background
   The history of development applications on land the subject of this application is detailed in
   the following table. Previous applications on the site seeking a 78 lot reconfiguration, group
   housing and associated restaurant and hotel were withdrawn after Council’s Information
   Request was sent.

    Application      Subject properties    Details                             Outcome
    Number
    51901.4861       Generally land now    Caravan Park (80 sites)             Approved
                     known as 114 Myall                                        26 February 1985
                     Street
    51989.642        Generally land now    Golf course, club house and car     Refused
                     known as 114 and      park
                     122 Myall Street
    51989.706        Generally land now    Rezone From Rural Catchment         Refused
                     known as 114 and      To Special Facilities (Motel,
                     122 Myall Street      Restaurant, Convention Room,
                                           Service Station)
    131999.982987    114 Myall Street      Extension to golf course            Approved
    (17613 DA)                             (additional 9 holes)                27 April 2000
    132000.200247    28 Myall Street       Telecommunications Facility         Approved
                                                                               14 September 2000
    152006.2047      122 and 144 Myall     Lot Reconfiguration (78 lots) to    Withdrawn
                     Street                be assessed against superseded      18 March 2009
                                           planning scheme
    152006.2047.02 122 and 144 Myall       Change to Development               Withdrawn
                    Street                 Application                         18 March 2009
    132007.2500     122 and 144 Myall      Material Change of Use -            Withdrawn
                    Street                 Accommodation Building x 2,         16 March 2009
                                           Group Housing Development -
                                           78 Lots, Function Room,
                                           Restaurant & Hotel Assessed
                                           Against the Superseded Planning
                                           Scheme
    132007.2501     28, 30, 102, 108,      Material Change of Use - Sport &    Withdrawn
                    114, 122 and 144       Recreation (Golf Club) & Indoor     16 March 2009
                    Myall Street           Entertainment assessed against
                                           the Superseded Planning
                                           Scheme
                 Details of previous application related to the subject land
   2.2. Site Description
   The application applies to 4 lots, 2 of which form part of the Cooroy Golf Club. The remaining
   2 lots at 122 and 144 Myall Street are undeveloped and in separate ownership to the golf
   club.
   The undeveloped lots have a frontage to Myall Street and are otherwise bound by the golf
   course. The topography of these lots is characterised by a knoll at the southern end of 144
   Myall Street and slopes which extend north-west and south-east of this high point. The land
   falls approximately 13 metres to the north-west and 7 metres to the south-east.
   A cleared area and access easement are located in the north-western corner of 122 Myall
   Street, and adjacent to this area is a stream with vegetated banks.
   The following image provides an aerial photograph of 122 and 144 Myall Street including
   contours.



                                                                                   Page 31 of 80

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                15 MARCH 2021




                     Figure 13: Aerial photograph of 122 and 144 Myall Street

   2.3. Surrounding Land Uses
   North: A mix of detached houses and dwelling units situated within the Attached Housing
   zone.
   South: 1 Nandroya Road – a 6.1ha Rural Settlement zoned property which previously
   contained an abattoir. A number of sheds are currently situated on the site.
   East: Queensland Rail corridor
   West: Myall Street with a range of uses situated on the western side of Myall Street including
   the Cooroy Village Retirement village, Noosa District State School, detached houses and
   undeveloped land. The undeveloped land is situated opposite the proposed location for the
   dwelling units.

   3.   ASSESSMENT
   3.1. Instruments for Statutory Assessment
   Under the Planning Act 2016 the application must be assessed against each of the following
   statutory planning instruments to the extent they are relevant to the development:
   •     State Planning Policy;
   •     South East Queensland Regional Plan;
   •     Planning Regulation 2017;
   •     The Noosa Plan 2006.
   As the Noosa Plan 2020 has been adopted after the time the application was properly made
   Section 45(8) of the Planning Act 2016 allows the assessment manager to give weight the
   assessment manager considers is appropriate to the new statutory instrument.



                                                                                  Page 32 of 80

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                 15 MARCH 2021


   3.2. State and Other Statutory Instruments
   State Planning Policy
   The Noosa Plan 2006 is generally consistent with the State Planning Policy July 2017 (SPP)
   and the SPP raises no further issues relevant to the proposed development.
   The State Planning Policy Interactive Mapping site shows that the subject land is classified
   as Agricultural Land Class A and B. The State Planning Policy on Economic Growth includes
   the following policy statement:
   (2)   Agricultural Land Classification (ALC) Class A and Class B land is protected for
         sustainable agricultural use by:
         (a)   avoiding fragmentation of ALC Class A or Class B land into lot sizes inconsistent
               with the current or potential use of the land for agriculture
         (b)   avoiding development that will have an irreversible impact on, or adjacent to,
               ALC Class A or Class B land
         (c)   maintaining or enhancing land conditions and the biophysical resources
               underpinning ALC Class A or Class B land.
   The proposed development is contrary to the State Planning Policy which seeks to avoid
   development that will have an irreversible impact on or adjacent to ALC Class A and Class
   B land.
   South East Queensland (SEQ) Regional Plan
   The site is located within the Urban Footprint area of the SEQ Regional Plan.
   The SEQ Regional Plan recognises that….
         The priority for developing land in the Urban Footprint is to accommodate urban growth.
         However, the Urban Footprint is not an urban zone and does not imply that all land can
         be developed for urban purposes.
         For example, state forests and remnant vegetation will continue to be protected and
         managed under relevant state legislation, including the Vegetation Management Act
         1999, Nature Conservation Act 1992 and Forestry Act 1959.
         Land in the Urban Footprint may be unsuitable for urban purposes for other reasons
         including constraints such as flooding, land slope and scenic amenity, and the need to
         protect significant vegetation, which may include matters of national environmental
         significance and parts of the regional biodiversity network.
         The Urban Footprint also includes some areas designated or already developed for
         rural and rural residential purposes that are located near urban services and facilities.
         Local governments must investigate these areas for urban redevelopment
         opportunities as part of their planning scheme reviews.
   While the land has been included in the Urban Footprint of the SEQ Regional Plan Shaping
   SEQ for a number of years Noosa Council has previously made representations to the State
   about its objection to the inclusion of this land. Neither the current planning scheme, the 2012
   draft of the Sunshine Coast Regional Council planning scheme nor the now adopted Noosa
   Plan 2020 have included it within the urban boundary for the town of Cooroy, as there was
   no need for this land to accommodate urban development.
   Council also made a submission to the State Government in response to the current SEQ
   Regional Plan when in draft form. As part of this submission Council addressed the capacity
   of land within the Urban Footprint to accommodate projected population growth. Noosa
   Council’s draft submission to the draft SEQ Regional plan noted:
         Council has concluded not to support any changes to the Urban Footprint under the
         new ShapingSEQ for reason that there is no need demonstrated currently for additional

                                                                                   Page 33 of 80

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                  15 MARCH 2021


         urban land to be allocated to Cooroy, or any other part of Noosa Shire. Council has
         previously outlined in this submission that it considers sufficient capacity exists in the
         current Noosa Plan to accommodate the projected demand for dwellings until 2041.
   Although within the Urban Footprint the development would result in the creation of an urban
   settlement within an area where the intent is to protect the landscape and capacity for rural
   production. The proposed urban development is not located within an established village, is
   well separated from the Cooroy township and is intended to be developed for rural residential
   lots under the Noosa Plan 2020.
   Significant environmental values are also present within the Riparian Buffer in the north-west
   of the site. This area contains a waterway and associated riparian vegetation and the
   development will result in disturbance to the bank and significant vegetation removal within
   this area associated with the extent of fill and development in this area. There is justified
   concern that the application will impact on significant vegetation and fauna habitat which form
   important parts of the Noosa biodiversity network.
   Furthermore, the excessive earthworks proposed, with cuts up to 4 metres indicate that the
   site is unsuitable for a seniors living development purposes where a flat environment is
   generally needed for aging persons.
   3.3. Statutory Instruments – Planning Scheme
   The subject site is located in the Cooroy and Lake Macdonald Locality and is zoned both
   Open Space Recreation and Rural under The Noosa Plan 2006 and is located outside the
   Urban Growth Boundary identified by the Noosa Plan 2006. The proposed use is defined as
   Multiple Housing Type 3 Retirement and Special Needs as the proposal is for a seniors living
   community with residents to reside in individual dwelling units.
   The proposed use of Multiple Housing – Type 3 (Retirement and Special Needs) is identified
   as an inconsistent use within the site’s Rural and Open Space Recreation zonings and is
   required to follow an impact assessable application process.
   The application must be assessed against the whole of the Noosa Plan 2006 to the extent
   the provisions are relevant to the development and regard may be had to the new planning
   scheme requirements for the site.
   The Noosa Plan 2006 envisages that Rural zoned land will be predominantly used for open
   space and farming activities. The intent is for this land to be appropriately managed and
   protected such that the scenic and environmental values, the distinct rural amenity and
   agricultural productivity are preserved. Land zoned Open Space Recreation is intended to
   be to be used for a variety of passive and active recreation activities reflective of the existing
   golf course.
   The planning scheme envisages that retirement villages would typically be located in the
   Semi-Attached Housing and Community Services zones and within the defined Urban
   Growth Boundary.
         Desired Environmental Outcomes
         The following Desired Environmental Outcomes are relevant to the application:
         a)    AGRICULTURE USES
               Agricultural industry is maintained by—
               i.    conserving land for economically viable and environmentally sustainable
                     agricultural purposes;
               ii.   preventing the fragmentation of agricultural land;
               v.    protecting agricultural pursuits from incompatible uses, particularly those
                     more suitably located within the urban growth boundary;
         i)    RESIDENTIAL USES
                                                                                     Page 34 of 80

Section 35

GENERAL COMMITTEE MEETING AGENDA                                                15 MARCH 2021


              Urban and rural settlement for residential use is contained within the defined
              urban growth boundaries shown on zoning maps ZM1- ZM9. It is developed to
              be consistent with—
              i.     the expected character and amenity for the particular locality; …
   The proposed development of 246 dwelling units does not meet these Desired Environmental
   Outcomes as it does not conserve land for agricultural purposes. While the land has not been
   identified as good agricultural land by The Noosa Plan 2006 or the Noosa Plan 2020 it is
   noted that the land has been identified as good agricultural land by the mapping for the State
   Planning Policy and has the capacity to be used for grazing purposes.
   The proposal would also result in a land use within a rural area that is more suitably located
   within the urban growth boundary, close to services and facilities. The subject site is
   separated from the urban growth boundary by the golf course.
   The use of this land for urban development is not consistent with or envisaged by the scheme
   and is at odds with the expected character and amenity of the area.
   Locality Provisions
   The following Overall and Specific Outcomes of the Cooroy and Lake Macdonald Locality
   Code are relevant to this application:
   6.7.2 The overall outcomes sought for the Cooroy & Lake Macdonald Locality are the
   following—
        a)    New uses and works are located, designed and managed to—
              i      be compatible with other uses and works; …
              iv     avoid significant adverse effects on the natural environment, including
                     native habitat removal, fragmentation and attrition;
        b)    The Cooroy and Lake Macdonald Locality supports a growing urban and rural
              settlement of permanent residents;
        c)    Urban development is limited to land within the Urban Growth Boundary as
              shown on Map ZM3;
              d)    Development is consistent with the Priority Infrastructure Plan in Part 15;
        r)    The traditional built form of Cooroy is retained and new development
              complements traditional streetscape and building forms;
        s)    Outside the town of Cooroy, development is characterised by—
              i      conservation of good quality agricultural land for agricultural purposes;
              ii     conservation of open space for biodiversity and water quality purposes; and
              iii    rural settlement at varying densities consistent with the available levels of
                     convenience and accessibility, environmental constraints and proximity to
                     the Lake Macdonald water supply catchment;
        y)    New areas of urban and rural settlement development are precluded from the
              part of the locality within the catchment area of Lake Macdonald where the
              dominant goal is the protection of water quality within the primary water supply
              source;
        cc)   The vistas offered from the major road corridors are protected and add to the
              attraction of the locality for visitors and residents;
        gg)   Development within the catchment is restricted to protect water quality and its
              associated environmental values. Subdivision and development within the water
              catchment is limited and much of the land will remain as open space;


                                                                                  Page 35 of 80

Section 36

GENERAL COMMITTEE MEETING AGENDA                                                15 MARCH 2021


         rr)   For the Rural Zone—rural land is protected and appropriately managed such
               that:-
               i     Agriculture and habitat protection are the dominant land uses;
               ii    the scenic and environmental values, the distinct rural amenity and
                     agricultural productivity of the locality are preserved and are not adversely
                     impacted as a consequence of development on or adjacent to that land;
                     and
               iii   locally appropriate enterprises such as bed and breakfast accommodation,
                     farmstays, cabins, camping grounds, roadside stalls and home based
                     businesses enhance the economic sustainability of the hinterland; and
   Specific Outcome O3 The function of, and visual amenity and character surrounding the,
   major road network, including Diamond St, Cooroy–Noosa Road, Belli Creek Road and Lake
   Macdonald Drive is protected and enhanced.
   Specific Outcome O15 On sloping sites, buildings and structures are designed to maximise
   the use of natural slope and minimise the need for cut and fill.
   Specific Outcome O18 There are no significant adverse effects on biodiversity, natural
   vegetation, native fauna habitat, landscape quality, water quality or cultural heritage values,
   including those related to—
   a) changes to natural drainage;
   b) disturbance to any of the wetland systems;
   c) management of landslide and fire risk;
   d) erosion and the transport of sediments off site;
   e) unmanaged public access;
   f) effluent disposal;
   g) changes to fauna habitat and behaviour; and
   h) disturbance of buildings and features, including natural features, of cultural heritage
   significance.
   Specific Outcome O27 Protection of Lake Macdonald water supply
   Treatment and disposal of waste water does not have any detrimental impact on Noosa’s
   major water storage and supply - Lake Macdonald
   Specific Outcome O81 Development on sloping sites—
   a) is responsive to the natural topography of the site and minimises cut and fill;
   b) does not visually dominate the hill slope or interrupt the skyline; and
   c) is integrated with the natural site characteristics including vegetation;
   Specific Outcome O82 The landscape character and visual amenity quality of hill slopes and
   ridgelines are retained.
   The proposed development partially aligns with the Overall Outcome which seeks that the
   Cooroy and Lake Macdonald Locality supports a growing urban and rural settlement of
   permanent residents but raises conflicts with the other Overall and Specific Outcomes.
   Of primary concern is the proposed use of rural land, located outside of the Urban Growth
   Boundary, for the purpose of a high density residential development.
   The planning scheme seeks that rural zoned land is protected and managed such that
   agriculture and habitat protection are the dominant land uses and the scenic values and
   distinct rural amenity are preserved. The proposed development of 246 dwelling units is in
   stark contrast with the schemes desired land use outcomes for the site and does not present
   visually as a logical extension of the Cooroy township as the golf course separates the site
   from nearby urban development.



                                                                                   Page 36 of 80

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                 15 MARCH 2021


   While there may be a market for retirement communities in Noosa Shire this is in part as a
   result of our own aging population but is also driven by residents from elsewhere retiring and
   seeking to move to Noosa Shire. The latter is a demand unlikely to ever be met.
   The applicant has provided an economic needs assessment and a community needs
   assessment in support of the application. The economic need assessment asserts that there
   is currently an indicative oversupply of 117 aged care places within the catchment area,
   with an undersupply of independent living units and manufactured homes for 231 persons.
   Over the period to 2041, the undersupply of independent living units and manufactured
   homes is projected to worsen to 406 persons given the current undersupply and aging
   population.
   In contrast Council’s Housing Needs Analysis (Briggs and Mortar, April 2017) includes a
   review of the need for retirement villages. The analysis includes the following:
        Adopting the 10% notional rate, the current provision is a theoretical shortfall of 63 units
        (in 2016, 746 units, compared to the required benchmark of 809 units). By 2036, an
        additional 515 units would be required to reach the benchmark. If all
        approved/proposed units are constructed, the supply would be adequate to 2036.
        However if any of the approved developments are not constructed, a deficiency would
        occur. Should the popularity of retirement villages continue to increase over time as
        has occurred in Australia and to an even greater extent overseas, it is also possible
        that a higher shortfall would arise in the future.
        … At the very least, sites earmarked for aged housing, or with current approvals, will
        need to be protected against other types of development, and redevelopment of
        existing sites into a variety of aged housing forms, facilitated.
        … The relatively few retirement village facilities in Noosa Shire (especially in coastal
        areas), together with an apparent under provision of aged care places and home care
        packages , and a lack of smaller, more affordable dwellings and high levels of housing
        stress, belies the needs of the current and future aged population of Noosa Shire. The
        choices are to move away to other areas of the Sunshine Coast region to access
        residential services in potentially cheaper accommodation, to return interstate if that
        was their origin, or to move into residential aged care prematurely. Those renting are
        particularly vulnerable.
        Retirement villages and residential care facilities are part (and an important part) of the
        package of solutions but also important is the ability for people to age in place within
        their existing town/community through improved housing choice and flexibility. In this
        regard, the secondary dwelling amendments and an increase in the establishment of
        small unit or semi detached complexes not necessarily specifically for the aged, should
        contribute significantly.
   The need for retirement villages and aged care facility was specifically considered with the
   planning for Noosa Plan 2020 and it was concluded that sufficient sites were already
   identified for retirement villages until 2036 but an undersupply was noted for aged care
   facilities. This is generally reflected in the following comments from Council’s Strategic
   Planning Department:
        In reviewing the current planning scheme and considering future needs for the aging
        population of Noosa Shire, it became evident that a significant shortage in residential
        care was emerging and set to worsen into the future. Noosa Council is particularly
        concerned about the needs of our residents into the future when they can no longer
        live independently. By the year 2041 we anticipate some 4,000 residents of Noosa
        Shire will be 85 years of age or older, nearly this many again will be between 80 and
        84. To put it another way, people 80 and over are projected to make up over 11% of
        the Shire’s population at that stage.



                                                                                    Page 37 of 80

Section 38

GENERAL COMMITTEE MEETING AGENDA                                                  15 MARCH 2021


   As a result of this review the new planning scheme re-zoned the land on the opposite side
   of Myall Street, 125 Myall Street, from Rural Zone to Community Facilities Zone with an
   annotation supporting a Residential Care Facility on the site. Furthermore the Urban Growth
   Boundary has been amended to include 125 Myall Street but the subject site remains outside
   of the boundary. It is noted that 125 Myall Street is large enough to accommodate both an
   aged care facility and self-contained retirement units.
   The applicant has suggested that the proposed development can provide housing for an
   ageing population and that a partnership with PresCare will allow for ageing in place, thus
   satisfying the need for additional aged care facilities in Noosa.
   Whilst the applicant promotes GemLife’s partnership with PresCare as an ageing in place
   solution, it is noted that the services provided by PresCare and other providers are available
   to all persons and are not contingent on being a resident in a facility such as the one proposed
   by the applicant. Furthermore the proposal does not provide a transition to the higher levels
   of care which will ultimately be required by residents.
   It is also not apparent how the proposal offers greater choice in housing than that which
   exists in Cooroy or indeed Noosa Shire already, apart from being within a managed
   community for the over 50’s, given all typical house styles shown on the architectural
   drawing are either 3 bedrooms (with a double lock up garage and 2 bathrooms) or 2
   bedrooms plus a “multi-purpose room” which would be capable of being used as a guest
   bedroom. They do not offer small dwellings or anything under 100 square metres of gross
   floor area.
   While the Manufactured Homes (Residential Parks) Act allows purpose built parks targeted
   at the over 50’s which have reduced up-front costs for residents because they are not
   purchasing the land on which their dwelling sits, this does not guarantee any particular level
   of affordability. Attractive country club recreational facilities are proposed to provide a point
   of difference and add to the amenity of the estate but also lead to significant ongoing rents
   and fees for residents.
   The scheme seeks that residential development is contained with the Urban Growth
   Boundary on suitably zoned land. There remains other land closer to the centre of town
   available for attached or semi attached forms of dwellings suitable for retirees and other
   approved retirement facilities which have not yet been completed at Cooroy, Tewantin and
   Sunrise Beach.
   The subject site also forms part of a rural buffer to the township of Cooroy and is a significant
   component of the rural character which is experienced when entering and exiting the Shire.
   The gentle grassed slope with views beyond to Mount Cooroy is characteristic of the scenic
   values which the planning scheme seeks to protect.




                             Figure 14: View into site from Myall Street



                                                                                     Page 38 of 80

Section 39

GENERAL COMMITTEE MEETING AGENDA                                                 15 MARCH 2021


   As part of the Information Request the applicant was requested to demonstrate how a tree
   lined access to Cooroy would be maintained and how the development would present to the
   various vistas around the site. It was requested that a visual amenity analysis be provided
   including photomontages of the development from key aspects, including the north and south
   approach of the highway, Ferrells Road intersection, Myall Street roundabout and key
   elevated sites off Cooroy Mountain Road. The applicant provided a written response only
   with no photographs provided. The response maintains that the 10 metre mounded and
   planted buffer will generally mitigate the loss of the existing open grassland view.
   It is agreed that the proposed landscaping treatment will assist in maintaining a ‘treed’ entry,
   however, the proposed development will still significantly compromise this outlook due to
   significant earthworks and replace the outlook with high density built form and an acoustic
   fence. The following plan from the applicant’s acoustic report details the recommended
   height and location of the acoustic barrier and may be subject to change based on DTMR’s
   requirement for a revised acoustic report.




                   Figure 15: Acoustic barriers recommended in acoustic report

   The proposed landscape buffer while will assist in partially screening the development, it will
   not maintain the scenic character attributed to the landform and grassed paddocks which
   form the current rural vista. It is also noted that some dwellings to the northern end of Myall
   Street frontage will be on up to 3.5 metres of fill, and consequently there are parts of the
   retaining wall which will be approximately 3 – 4 metres above the existing natural surface
   level. Dwellings to the southern end of Myall Street will be approximately 4 metres below
   Myall Street. It is therefore likely that views into the site will be dominated by built form
   including a continual ‘sea of roofs’ particularly where the development is situated lower than
   the road level.
   The development will also not appear as a logical extension to existing development being
   separated from the township by the golf course and will therefore appear quite out of place.
   The significant extent of earthworks required demonstrates that the site is not suitable for the
   proposed development with the planning scheme seeking site responsive design in order to
   minimise the extent of cut and fill.
   Furthermore the proposal is not consistent with the Local Government Infrastructure Plan
   (LGIP) as it seeks a high density development on land outside of the Priority Infrastructure
   Area (PIA). It is noted that with regards to residential dwellings the LGIP is based on an
   assumption that the total number of residential dwellings across the entire Shire will increase
   by 1,399 in the years 2016 -2021, with an additional 510 dwellings by 2026. This represents

                                                                                   Page 39 of 80

Section 40

GENERAL COMMITTEE MEETING AGENDA                                                             15 MARCH 2021


     approximately 191 dwellings per year. The current proposal seeks an additional 246
     dwellings on land which is not suitably zoned or included within the PIA. The following images
     detail the Urban Growth Boundary and the Priority Infrastructure Area.




Figure 16: Aerial photograph detailing Urban Growth Boundary (blue line) and 144 Myall Street outlined in red




      Figure 17: Aerial photograph detailing Priority Infrastructure Area (blue line) and 144 Myall Street
                                                outlined in red

                                                                                                Page 40 of 80

Section 41

GENERAL COMMITTEE MEETING AGENDA                                                    15 MARCH 2021


   The proposal is also in conflict with the scheme outcomes which seek to protect water quality
   within the water supply catchment area by limiting development and preserving open space.
   It is also noted that a private sewerage pump is proposed which raises concern with regards
   to water quality should the system fail or not be appropriately maintained.
   The boundary realignment proposed results in the use of Open Space Recreation zoned land
   for the purpose of residential dwellings. The use of this land is contrary to the intended
   purpose of this land for recreational activities.
   Built form
   The locality code includes built form requirements for new development and specific
   requirements within the Rural Zone. It is generally expected that these requirements would
   relate to the development of a single dwelling house and structures associated with rural
   activities such as sheds/stables etc. The most relevant provisions for the built form
   associated with the proposed use are those related to Multiple Housing Type 3 – Retirement
   and Special Needs.
   As Multiple Housing Type 3 – Retirement and Special Needs is a consistent use within the
   Community Services Zone and the Semi-Attached Housing zone these are considered to be
   the more relevant provisions. The table below summarises the development’s level of
   compliance with the built form provisions for the Community Services and the Semi-Attached
   Housing zones and the car parking requirements with the Driveways and Car Parking Code.

   Criteria               Planning Scheme                  Proposal              Complies?
                 Community        Semi-Attached                            Community      Semi-
                 Services                                                   Services     Attached
   Site Area     -                Minimum 800m2        11.08ha                N/A            
   Population     160 person/ha 100 person/ha          73.27 per hectare                    
   density
                                 1 dwelling unit per   1 per 447m2            N/A           
                                 400m2
   Gross floor   N/A             Max population        Club house             N/A           
   area                          density x 40m2        3,253m2
                                 = 44,000m2            Managers
                                                       residence
                                                       262m2
                                                       Dwellings
                                                       35,670m2 approx.

                                                       Total
                                                       39,185m2

   Site cover    50%             40%                   48.3% advised by                    X
                                                       applicant

   Building
   height                                              Dwellings:
   • storeys     2 storeys max   2 storeys max         1 storey                            
   • metres      8 metres        8 metres              < 8 metres                          

                                                       Managers
                                                       residence:
                                                       2 storeys                           
                                                       7.218 metres                        
                                                       Seniors living
                                                       clubhouse:
                                                       2 storeys                           
                                                       9.872 metres            X            X



                                                                                     Page 41 of 80

Section 42

GENERAL COMMITTEE MEETING AGENDA                                                      15 MARCH 2021


   Criteria              Planning Scheme                     Proposal               Complies?
                Community        Semi-Attached                                Community      Semi-
                Services                                                       Services     Attached
   Setbacks     Front: 6         Front: 6 metres         Min: 2.1 metres to       X             X
                metres                                   Managers
                                                         workshop
                                                         Max: > 6                             


                                   Other: Half the       North: 9.78m                         
                Other: Half the    building height       South: 3m                            
                building height                          East: 1.89m              X            X

   Roof form    12 degrees         12 degrees and        Not detailed on          -            -
                and has            has minimum           plans
                minimum            600mm eaves to
                600mm eaves        at least 75% of
                to at least 75%    the perimeter of
                of the             the building
                perimeter of
                the building
   Carparking   1 covered          1 covered space       Double garage                        
                space per          per                   provided
                accommodatio       accommodation
                n unit or          unit or dwelling      32 provided              X            X
                dwelling unit;     unit; AND
                AND
                                   1 designated          Not provided             X            X
                1 designated       visitor space per 4
                visitor space      accommodation
                per 4              units or dwelling
                accommodatio       units, or part
                n units or         thereof; AND
                dwelling units,    1 emergency
                or part thereof;   vehicle space.
                AND
                1 emergency
                vehicle space.     Required:             Provided:
                                   246 covered           492
                Required:          62 visitor            32
                246 covered        1 emergency           0
                62 visitor
                1 emergency
   Landscapin   Proposed           Proposed              Approx. 20% =            X            X
   g            population         population density    22,000m2
                density x 40m2     x 40m2
                = 32,472m2         = 32,472m2


   In terms of built form, the majority of the sites for each dwelling are 13 metres wide by 21
   metres in depth whilst approximately 100 of the sites are 14 x 21 metres, representing an
   area of approximately 273m2 and 294m2 respectively. It is proposed to construct a 3 bedroom
   dwelling on each site with each dwelling type having a maximum width and length as follows:
   Type 1: 12.6 x 17.1 metres
   Type 2: 13.5 x 17.1 metres
   Type 3: 13 x 17.4 metres
   The above tables demonstrates the proposal is generally consistent with the built form
   parameters associated with a retirement and special needs facility within the Community

                                                                                       Page 42 of 80

Section 43

GENERAL COMMITTEE MEETING AGENDA                                                       15 MARCH 2021


   Services and Semi-Attached Housing zones with the exception of site cover, landscaping,
   the height of the facilities building and car parking. The site cover exceedance relates to the
   Semi-Attached Housing Zone which is exceeded by approximately 8%.
   Due to the significant site cover it is evident that the proposal will result in buildings being
   built in very close proximity to each other with little opportunity for meaningful landscaping to
   be provided between buildings or within the access driveways.
   This will result in an appearance of continual built form and a ‘sea of roofs’ when viewed
   externally. The limited opportunity for meaningful landscaping is not environmentally
   sustainable as minimal shading will be provided to the dwellings and will result in increased
   dependence on mechanical ventilation. It is also noted that the significant height and scale
   of the facilities building is likely to result in the building being a dominant feature in the rural
   and open space landscape.
   Whilst it is acknowledged that a retirement and special needs development may result in a
   different built form outcome to other forms of residential development, the current proposal
   is not consistent with the rural character which the planning scheme seeks to protect at this
   location. Furthermore the design of the proposed dwellings are not reflective of the built form
   characteristic of Cooroy. The following image provides an aerial view of a Living Gems
   development in Logan Village noting that the current proposal provides some additional
   landscaping (Living Gems is the parent company of GemLife).




              Figure 18: Aerial photograph of built form of Living Gems in Logan Village

   Biodiversity – Riparian Buffer
   Lot 2 (122 Myall Street) contains a creek line which dissects the front portion of the lot and
   flows in a northerly direction. The creek carries flows from 220 hectares upstream and flows
   into Lake Macdonald, a potable water supply storage area. Lake Macdonald drains into the


                                                                                           Page 43 of 80

Section 44

GENERAL COMMITTEE MEETING AGENDA                                                 15 MARCH 2021


   6 Mile creek which feeds into the Mary River and finally into the Great Sandy Strait marine
   park.
   Approximately 750m of this creek line dissects the golf course and the proposed
   development site, with 130m upstream in lot 2. The Noosa Plan 2006 assigns a riparian
   buffer protection overlay of 75m each side of the creek whilst the Noosa Plan 2020 assigns
   a 100m buffer to each side of the creek. The larger buffer is a result of the State’s
   requirements to protect creek lines which flow into Mary River system. The proposed
   development significantly intrudes into these riparian buffers as identified in Figure 19 below.
   This unnamed tributary of the 6 Mile Creek system provides habitat values for threatened
   fauna species. The site contains habitat suitable for state and commonwealth threatened
   species such as the Giant Barred Frog, Tusked frog, Cascade Tree Frog and possibly the
   Green Thighed Frog. Platypus have been reported at the golf club and the site contains
   suitable habitat. Koalas, Tusked frogs and Giant Barred Frogs have been reported within
   1km of the site.
   The provision of a bridge crossing in this location will accelerate bank erosion and cause bed
   lowering due to constraining high flows at the bridge. Bank erosion will lead to destabilisation
   of existing trees and cause tree falls, thus further accelerating bank erosion. Loss of
   vegetation and destabilisation of the banks will increase light penetration into the waterway,
   increase sediments and degrade in-stream and riparian habitat values in-situ and
   downstream. Rock armament will result in loss of suitable habitat for threatened species.
   Furthermore the provision of dwellings, a sewerage pump station, holding tanks and auxiliary
   power supply, RV storage area and road and footpath network within the riparian buffer area
   sterilises the area for future ecological habitat restoration intended by the planning scheme.
   Extensive earthworks, and associated development, within the riparian buffer inhibit natural
   creek bed movements and force energy dissipation associated with flood waters elsewhere.
   Provision of required riparian buffers, habitat restoration and enhancement planting will
   mitigate the aforementioned ecological hazards.
   Considering the intensification of the site in a rural zone, the proposed use and the
   earthworks required to undertake this use, the application of a suitable riparian buffer is
   paramount to achieve the environmental outcomes of the Biodiversity Overlay Code. The
   current layout is not supported due to encroachment in to the riparian buffer area.
   The following images detail the waterway within the Riparian Buffer:




                                                                                   Page 44 of 80

Section 45

GENERAL COMMITTEE MEETING AGENDA                                                      15 MARCH 2021


The extent of proposed works within the Riparian Buffer is detailed in the following images.




         Figure 19: Proposed works within the Riparian Buffer (2006 and 2020 planning schemes)




                                                                                        Page 45 of 80

Section 46

GENERAL COMMITTEE MEETING AGENDA                                                       15 MARCH 2021




 Figure 20: Proposed works within the Riparian Buffer – 2006 (yellow) and 2020 (purple) planning schemes

    Traffic and Car Parking:
    The application was reviewed by both the Department of Transport and Main Roads (DTMR),
    as a referral authority, and by a consulting traffic engineer. DTMR have advised the access
    to the site from the north-western corner and associated left and right turning lanes in Myall
    Street is acceptable. DTMR’s required access point results in significant works in the riparian
    buffer attributed to the access driveway and bridge. DTMR have confirmed that an alternative
    access is available at the southern end of the site and outside the riparian buffer.
    The review of the proposal by the external traffic engineer notes that in terms of the impacts
    on the broader road system:
           … the impacts are mainly on TMR roads and intersections and TMR have issued their
           approval. Furthermore, the additional information supplied in the TTM report of 28 Nov
           2019 is sufficient to verify that the traffic generation rates they used in the original TTM
           report of 9 September 2019, are appropriate. In that context, given that the golf club
           already exists (acknowledging that the new clubhouse will be bigger), it is reasonable
           to assume that most of the golf course traffic is already on the road system and will
           simply access the road system at a new location further along Myall Street. Thus, the
           additional traffic is essentially that associated with the retirement community, which
           being in the order of 25 in and 25 out in the AM peak, would be less than 5% of existing
           peak hour volumes in Myall Street (about 500vph in each direction in the AM peak)
           after allowance is made for some site traffic to be oriented to/from the Bruce Highway,
           rather than all being associated with the Cooroy township direction.
           … if the relocatable home park were to operate in the future without age restriction,
           then the associated traffic generation of the relocatable home park would be expected
           to be 2-3 times greater than that associated with a retirement use (2-3 times higher


                                                                                          Page 46 of 80

Section 47

GENERAL COMMITTEE MEETING AGENDA                                                  15 MARCH 2021


         than assumed in the TTM reports), in which case the traffic impacts on the broader
         network would be significant.
   The consultant has identified inconsistencies between the architectural plans and plans
   within the traffic report noting a variation in road widths. The architectural plans demonstrate
   3.5 – 4.0 metre widths in 2 locations on the site whereas the traffic report discusses two-way
   aisles. These narrow road widths are not supported with all internal roads requiring a
   minimum width of 6.0 metres with 2.0 metre verges on each side. Whilst these requirements
   could be conditioned it is noted that this will impact on the layout and likely reduce the
   applicant’s proposed yield.
   In terms of car parking it is noted that a double garage is provided to each residence and an
   additional 32 visitor spaces are provided with half of these located at the club house. This
   represents a shortfall of 30 visitor spaces. Whilst the applicant seeks to rely on car parking
   within the double garages to satisfy the visitor car parking requirement this is considered
   unreasonable as it is impractical to expect that residents of the dwelling will make their
   garage spaces available to visitors. The traffic report submitted with the application discusses
   visitor parking being permitted on the internal 6.0m wide roadway however it is noted that in
   the “Use of the Park – visitors” section of the “Special terms” document (part of the Site
   Agreement) specifies that visitors are not permitted to park anywhere other than in the
   designated visitor carparks.
   Furthermore, the location of the visitor car parking is unsuitable as it is not dispersed
   throughout the development to enable easy access for visitors visiting residents in their
   homes.
   Sufficient car parking has not been provided for the golf club house as 94 car spaces are
   proposed in lieu of the 103 spaces required to service the 308 patrons who can be
   accommodated in the restaurant, café, function room, golfers lounge and terrace areas. The
   shortfall in car parking is further exacerbated as the golf club house car park will also be used
   by patrons of the golf course.
   The application was also referred internally to the Infrastructure Planning Design and
   Delivery team seeking advice regarding external pathway connections and the specific
   Noosa Council bus stop infrastructure types. In regard to external footpath connections the
   design office has indicated that it would be desirable for a footpath connection extending
   from the proposed bus stop on the western side of Myall Street along the western side of
   Myall Street and connecting to the existing pathway network on the northern side of Ferrells
   Road. The alignment of the footpath would need to consider significant vegetation in Myall
   Street and 2 pram crossings in Ferrells Road. In regard to bus stop infrastructure types the
   design office have advised that due to the routes that an R1 type shelter would be required
   on both sides together with the associated infrastructure as required by Translink. Relevant
   conditions could be included to address these requirements.
   Acoustic:
   An acoustic report has been provided to establish traffic impacts to the development and to
   determine acoustic criteria for onsite activities. The report includes recommendations for
   acoustic barriers with a maximum height of 2.4 metres and building treatments to address
   traffic noise from Myall Street. The report concludes that if the golf clubhouse is proposed as
   a licensed premises, a detailed amplified music assessment will need to be conducted to
   determine the maximum allowable noise levels for any amplified entertainment, in
   accordance with Office of Liquor and Gaming Regulation (OLGR) requirements. Given the
   applicant indicates the golf club house will be available for functions, it is reasonable to
   assume that the clubhouse will be licensed and therefore it is appropriate that a detailed
   assessment be undertaken as part of this application to determine the appropriate hours of
   operation and any limits on outdoor dining areas.




                                                                                    Page 47 of 80

Section 48

GENERAL COMMITTEE MEETING AGENDA                                                15 MARCH 2021


   Stormwater:
   The applicant’s proposed water quality and water quantity outcomes have been reviewed by
   an external consultant who advises the applicant has addressed the significant issues in
   regard to stormwater quantity/quality and any outstanding issue could be addressed by the
   inclusion of reasonable conditions. Notably, the stormwater bio- basin for the senior living
   facility is proposed on the golf course land and would require an easement to be created
   over these to allow maintenance of these into the future.
   Sewer connection:
   Documentation provided by the applicant includes a Decision Notice from Unitywater which
   authorises and is limited to connection of network infrastructure and property services
   infrastructure at Lots 2 & 3 SP115864 to Unitywater’s network infrastructure, and where
   relevant, the establishment of water supply and sewerage network works infrastructure,
   subject to conditions. The approval requires works to be in accordance with a Water Supply
   and Sewerage Network Capacity Assessment prepared by the applicant which states the
   proposed development will be serviced by a private pump station and rising main that is
   planned for connection to the SPS CRY012 catchment, via a gravity main crossing across
   Myall Street. The rising main alignment will be located within the subject site and allotments
   to north, parallel to the western property boundaries.
   The proposed location of the private pump station and rising main are detailed in the following
   image:




                       Figure 21: Location of pump station and rising main

                                                                                   Page 48 of 80

Section 49

GENERAL COMMITTEE MEETING AGENDA                                                    15 MARCH 2021


   The proposed pump station within the dam catchment area raises concern, as it would
   potentially result in the catchment being polluted should the system fail or not be adequately
   maintained. Furthermore, the proposed siting of the pump station as detailed in the
   engineering plans is not included on the architectural plans with the architectural plans
   detailing this area as a driveway.
   It is noted that the alignment of the private main is within the vicinity of the existing tree line
   within the golf course. This vegetation is an important component of the tree lined character
   experienced when entering and existing Cooroy. It is unclear as to whether the development
   of the rising main will impact on this existing vegetation.
   Community Benefit
   The applicant seeks to justify the conflict with the planning scheme by promoting that the
   development will result in a number of benefits to the community.
   The application material states that the Cooroy Golf Club is facing a substantial deficit this
   financial year as a result of a declining membership base. On this basis it is agreed that the
   provision of one 10 year golf club membership per dwelling and upgrades to the golf club
   facilities would provide a significant stimulus to the financial viability of the golf club at least
   in the short term.
   Whilst it is acknowledged that the golf club provides a facility for people to recreate and
   socialise, the benefits proposed by the applicant are generally contained to the Cooroy Golf
   Club and its 346 current members. There is likely to be a significant portion of Cooroy
   residents who would derive no or little benefit from the proposed upgrades to the golf club
   noting that only 38 of the 346 submissions made in support of the application were from
   residents of Cooroy and Cooroy Mountain, though the use of the new club house for functions
   may have some wider community benefit. In summary, whilst it is understood that the
   proposal has the support of the golf club and its members because it offers an upgrade of
   facilities and some ongoing security to the club’s future, the paid membership is only for 10
   years and these benefits do not outweigh the proposal’s conflicts with the planning scheme.
   Infrastructure Agreement
   The provision of a golf club membership and the carrying out of works to the golf club as
   proposed by GemLife cannot be conditioned as part of a development approval as they are
   not considered reasonable and relevant conditions as required by the Planning Act 2016. As
   detailed in the applicant’s response to the Information Request, GemLife for this reason,
   have advised that they are agreeable to be bound by an Infrastructure Agreement (IA) to
   deliver the proposed outcomes. In the response to the Information Request the applicant
   advised:
         The applicant has prepared an Infrastructure Agreement setting out the deliverables
         agreed between GemLife and the Golf Club to provide Council with the surety required
         that these benefits will be delivered. Council will be provided a copy of this agreement
         under separate cover and the applicant is willing to execute this agreement prior to a
         development approval being issued.
   On 22 January 2021 the applicant provided an Infrastructure Agreement executed by the
   applicant whilst the Cooroy Golf Club and the current landowners of 122 and 144 Myall Street
   (the Rural zoned land) provided their consent to the agreement.
   The agreement includes the following deliverables:
   •     Work contribution to design and construct a new golf club house.
   •     Work contribution to fit out new golf club house.
   •     Work contribution to design and construct a car park.
   •     Work contribution to design and construct new vehicle access road to new golf club
         house (a shared access with the seniors living community).

                                                                                       Page 49 of 80

Section 50

GENERAL COMMITTEE MEETING AGENDA                                                15 MARCH 2021


   •     Work contribution to design and construct golf buggy storage shed.
   •     Financial contribution of 1 golf membership in the Cooroy Golf Club Inc. for each
         dwelling in the seniors living community for a period of 10 years.
   •     Work contribution to design and construct retrofits to existing golf course layout.
   •     Financial contribution to Cooroy Golf Club Inc. for course improvements (not already
         covered by Golf Course Draft Master Plan 7).
   The agreement has been reviewed by Council’s external planning solicitor who has raised a
   number of concerns relating to the capacity of the agreement to ensure that the proposed
   works/financial contributions are delivered. It has also been advised that the Cooroy Golf
   Club must be a party to the agreement as the works are occurring on their land and they
   must be bound to ensure the completion of the works. Should Council wish to approve the
   application, the agreement would require amendment before Council decides the application.
   4.    DRAFT PLANNING SCHEME
   The new Noosa Plan adopted by Council commenced on 31 July 2020, and as such it is
   appropriate to give some weight to the content of this new scheme.
   The Noosa Plan 2020 includes the land the subject of this application partly in the Rural
   Residential Zone and partly in the Recreation and Open Space Zone. The land sits outside
   of the Urban Area Boundary. As such it is not the intent of the scheme that this land be
   developed for urban purposes within the life of the planning scheme. It is also outside of the
   Priority Infrastructure Area. A new club house for the golf club is a suitable use within the
   Recreation and Open Space Zone.




                             Figure 22: New planning scheme zoning

   In preparing the planning scheme and in reviewing submissions pertaining to this property
   Council considered the development potential and suitability of this site and it was
   considered that despite its inclusion within the Urban Footprint of the SEQ Regional Plan,
   commitment of the land for urban purposes was neither necessary nor appropriate.
   As already indicated, urban development of this land is not planned for within this scheme
   and the use is not supported in the zone.


                                                                                   Page 50 of 80

Section 51

GENERAL COMMITTEE MEETING AGENDA                                                15 MARCH 2021


   5.    CONSULTATION
   5.1. Referral Agencies
   The application was referred to the following Referral Agencies:
   •     Department of Infrastructure, Local Government and Planning (SARA)
   The Department is a referral agency for:
   •     Schedule 10, Part 9, Division 4, Subdivision 1, Table 1, Item 1 (Planning Regulation
         2017)
         Development application for material change of use stated in schedule 20 of the
         Planning Regulation 2017
   •     Schedule 10, Part 9, Division 4, Subdivision 2, Table 1, Item 1 (Planning Regulation
         2017)
         Development application for reconfiguring a lot within 25m of a state controlled road
   •     Schedule 10, Part 9, Division 4, Subdivision 2, Table 4, Item 1 (Planning Regulation
         2017)
         Development application for a material change of use within 25m of a state-controlled
         road and railway
         The Department response included conditions relating to:
   •     Setback of the development from the railway corridor to be generally consistent with
         the SARA approved pan;
   •     The development being carried out in accordance with supporting flood study and
         storm water management report to ensure that the state-controlled road is not
         impacted;
   •     Provision of new bus stops on Myall Street;
   •     Provision of internal pedestrian pathway connecting to Myall Street, a pedestrian
         crossing at the front of the site and pedestrian footpaths to the new bus stops;
   •     Roadworks in Myall Street including left and right turning lanes and road widening;
   •     Vehicular access to the state-controlled road (Myall Street);
   •     Emergency access;
   •     Provision of a noise barrier to address vehicular noise from Myall Street
   The following image is an excerpt from the approved set of SARA plans and provides
   details of works to the frontage of the site, a copy of this plan is included in Attachment 6




                          Figure 23: SARA approved plan – Myall Street



                                                                                   Page 51 of 80

Section 52

GENERAL COMMITTEE MEETING AGENDA                                                       15 MARCH 2021


   5.2. Other Referrals
   The application was forwarded to the following internal Council officers:
   •    Coordinator Development Engineering
   •    Environment Officer
   •    Coordinator Environmental Health
   The application was also reviewed by external consultants with regards to traffic and
   stormwater quality and quantity.
   5.3. Public Notification
   The application was publicly notified for 15 business days in accordance with the Planning
   Act 2016. 392 properly made submissions were received, 343 properly made submissions
   were made in support of the application and 47 properly made submissions were made
   objecting to the application, 2 properly made applications were impartial. The following table
   provides a summary and assessment of the issues raised by submitters.
    Matters Raised                              Comments
    Support:

    Guaranteed membership boost – 246           It is acknowledged that the proposed works to the golf
    golf memberships (1 for every dwelling      course and provision of one membership per house
    in the GemLife resort) guaranteed for a     for 10 years will be of financial benefit to the golf
    period of 10 years.                         course. However, the financial viability of the golf club
    New Golf Club House – Construction          is not a satisfactory reason to justify the developments
    and fit out of a new Golf Club House for    significant non-compliance with the planning scheme.
    Cooroy Golf Club including dedicated
    pro shop, restaurant, café, function
    room, outdoor deck and terrace area.
    The clubhouse will be equipped to cater
    for weddings and functions so that the
    club can generate supplementary
    income from events
    New Golf Course Car Park –
    Construction of a new 97 space car park
    for the golf course
    New golf buggy storage facilities –
    Construction of a 40 space golf buggy
    storage shed.
    Ensures continuing operation of the
    Cooroy Golf Club

    New and safer access – Construction of      The proposed access arrangements provides
    a new entry to the golf course from Myall   improved access to the golf club, however the access
    Street.                                     is through the Riparian Buffer and requires works
    Dedicated turning lanes into the            within a water way. DTMR have confirmed that an
    GemLife/Golf Club House to be provided      alternative access is available at the southern end of
                                                the site.
    The concept of retirement living adjacent   Whilst the golf course adds a point of difference for
    to a golf course is appealing. Much         the developers when marketing the development it is
    needed retirement living and economic       not a requirement of the planning scheme.
    stimulus for Cooroy.

    Delivers much needed retirement             A housing needs analysis has identified a need for
    housing and ageing in place solutions       additional aged care facilities for people aged 80 and
                                                over. The new planning scheme has re-zoned land on
                                                the opposite side of Myall Street to facilitate the
                                                development of an aged care facility. The applicant

                                                                                          Page 52 of 80

Section 53

GENERAL COMMITTEE MEETING AGENDA                                                        15 MARCH 2021


    Matters Raised                               Comments
                                                 has not demonstrated any planning need for the
                                                 proposed development.

    Employment will be created in the            Agreed
    ongoing operation of the retirement
    resort.
    The new 246 households will support
    local businesses
                                                 Whilst a significant portion of the land is cleared it
    The development is proposed on               continues to provide rural scenic amenity and could be
    predominately cleared land                   used for an agricultural/rural activity. The landscape
                                                 buffer is generally at least 10 metres however a
    A 10m wide landscape buffer along            significant section of the frontage at the southern end
    Myall Street will be visually appealing      of the site is less than 10 metres with a minimum
                                                 setback of 2.146 metres to the workshop. A landscape
                                                 buffer will not completely screen the development
                                                 noting that the landscaping would filter views of the
                                                 development and that plants would take time to fill out.

    Object:

    Does not comply with the zoning within       Agreed – the proposal raises concern due to its non-
    the Noosa Plan                               compliance with the planning scheme particularly with
                                                 regards to the proposed high density residential use in
    Proposal does not comply with Specific       the Rural Zone, noting that the proposal conflicts with
    Outcomes for Cooroy and Lake                 the strategic intent for the site in both the Noosa Plan
    Macdonald Locality for amenity, major        2006 and new planning scheme. The development will
    road network, density, setbacks, site        also result in a significant change to the existing
    cover, plot ratio and protection of Lake     scenic amenity due to the transformation of the
    Macdonald water supply                       existing grassed and treed rural outlook with modified
                                                 ground level, acoustic barrier and dense built form
    Proposal does not comply with Specific       which would be partially screened with a planted
    Outcomes and Probable Solutions for          vegetation buffer. The construction of a new access
    Rural Zone as it is an inconsistent land     road and development of dwelling sites within the
    use and does not provide sufficient          Riparian Buffer are not supported due to the impact on
    buffer areas                                 environmental values.

    The site is impacted by the Riparian
    Buffer

    Does not comply with Residential Uses
    Code

    Density of the proposal is incompatible
    with surrounding Cooroy development

    Development is located in the catchment      The planning scheme seeks to prevent works within
    area of the Lake Macdonald water             the water supply catchment area. The development of
    supply                                       a high density residential development is inconsistent
    Private sewerage pump is not                 with the intent to maintain the rural land. The siting of
    appropriate in the dam catchment area        a private sewer pump within the water supply
                                                 catchment area raises concerns as a system failure
                                                 would potentially result in effluent within the catchment
                                                 area.


    Visibility of proposal from the major road   The proposed built form and transformation of a rural
    network and insufficient landscaping         outlook to a residential development raises concern
                                                 with regards to the impact on the existing scenic views
                                                 from the major road network.

                                                                                          Page 53 of 80

Section 54

GENERAL COMMITTEE MEETING AGENDA                                                       15 MARCH 2021


    Matters Raised                              Comments
    Subject site is an example of Cooroy’s
    hinterland beauty and will be damaged
    by high density residential development

    The application does not demonstrate an     Agreed – the potential financial benefit to the golf club
    overriding need for the development in      does not overcome the concerns with the proposals
    the public interest                         conflict with the planning scheme.

    Falling membership or financial
    membership is not an overriding need

    Land should be used for agriculture         Agreed – rural activities could be undertaken on the
                                                land and would be consistent with the planning
    Land could be used for market garden        schemes intent for the site.

    Land is outside Urban Growth boundary       Agreed - the land is located outside of the town
                                                boundary in both the current and new Noosa Plan and
                                                the proposed development is not consistent with the
                                                strategic intent for the site.

    This is an urban activity on land with an   The land is within the SEQRP’s Urban Footprint
    SEQRP designation of Regional               although outside of the planning schemes town
    Landscape and Rural Production              boundary

    Need is not in rural community with         Whilst acknowledging resident’s concerns regarding
    limited infrastructure in the town          the capacity of existing infrastructure within Cooroy to
                                                cope with the development it is noted that both DTMR
    Myall and Elm Street intersection will be   and Council’s consulting traffic engineer have
    further impacted                            accepted the proposal. However, it is noted that the
                                                proposal is outside of the Priority Infrastructure Area
    Increased population will overload          (PIA) and results in the development of 246 dwellings
    services and facilities                     on one site in Cooroy whereas the PIA was based on
                                                an assumption of an additional 280 dwellings per year
    Road network cannot cope with               across the entire shire for the years 2016 – 2021
    additional traffic

    Impact on Cooroy urban population

    Car parking in Cooroy will not cope

    Recent development is already placing a
    strain on infrastructure


    This is a permanent subdivision

    The houses are not relocatable              Whilst the development does have the appearance of
                                                a residential subdivision with permanent dwellings the
                                                applicant has:
                                                • Demonstrated that the dwellings will be certified
                                                    as relocatable;
                                                • Not applied for a subdivision;
                                                • Provided a site agreement which demonstrates
                                                    the mechanism by which home owners occupy
                                                    the site without the lease being defined as a
                                                    subdivision




                                                                                          Page 54 of 80

Section 55

GENERAL COMMITTEE MEETING AGENDA                                                     15 MARCH 2021


    Matters Raised                             Comments
    Allotments are too small and streets too   It is agreed that the size of the allotments are small
    narrow to allow service vehicles to        although these are generally consistent with lot sizes
    operate                                    for this type of land use. 6.0 metres road widths, with
                                               2 metre verges on each side, would generally be
                                               adequate to enable service vehicle movement. It is
                                               agreed that the narrow (3.5 – 4 metre) one-way
                                               roadways are not acceptable as there would be issues
                                               using driveways and garages.

    No adequate outdoor recreation areas       Whilst no specific outdoor area has been created for
    for children                               children there is no requirement within the planning
                                               scheme for one to be provided.

    No external works are proposed to          If the development were to be approved conditions
    provide cycling/pedestrian connectivity    could be included requiring pedestrian/cycling
    to Cooroy                                  connectivity.


    Cooroy already has sufficient number of    Council has undertaken a housing needs analysis
    retirement facilities                      which has identified a need for additional aged care,
                                               but this development does not satisfy this need.

    Will negatively impact local fauna         Development within the Riparian Buffer is a concern.
                                               A residential development on this land would
                                               decrease grazing areas for local fauna

    Clubhouse expansion will adversely         As the clubhouse is proposed as a licensed premises,
    impact on residents                        a detailed amplified music assessment is required to
                                               determine the maximum allowable noise levels for any
                                               amplified entertainment, hours of operation and
                                               limitations to any outdoor dining areas.

    Adjoining landowners have as of right      The proposed residential development is adjacent to
    permission to conduct rural uses           rural land and raises the potential for adverse amenity

    High density creates social issues and     All residential development can result in conflict and
    neighbourhood disputes                     dispute between neighbours noting that there are a
                                               number of higher density developments within the
                                               Shire which do not result in an increased number of
                                               neighbourhood disputes.

    No guarantee of economic benefit from      Not planning related matters
    construction as GemLife may use their
    own contractors
    The development will impinge on any
    proposal to by-pass the town
    The clubhouse could include gaming
    machines in the future
   6.    CONCLUSION & REASONS FOR DECISION
   The application seeks to develop a senior living facility with 246 dwelling units and undertake
   improvements to the adjoining golf club including the provision of a new club house.
   The proposal raises concern due to significant conflict with the planning scheme as the
   subject site is located within the Rural Zone and Open Space Recreation zone and outside
   of the town boundary. It is intended that land within the Rural zone be used for
   agricultural/rural activities and not for high density residential development. A high density
   residential development on the subject site would have detrimental impacts on the rural
   scenic amenity and diminish the capacity for agricultural/rural activity within proximity of the

                                                                                        Page 55 of 80

Section 56

GENERAL COMMITTEE MEETING AGENDA                                                     15 MARCH 2021


   township. The built form of the development raises concerns with regards to site cover,
   setbacks, and inconsistency with the character of Cooroy and landscaping. The provision of
   car parking also raises concern as the proposed use of garages for visitor parking is
   impractical.
   A housing needs analysis undertaken for the new planning scheme has identified a need for
   aged care facilities and consequently land on the opposite side of Myall Street has been re-
   zoned in the new planning scheme to accommodate a residential care facility. The proposed
   development is therefore additional to those needs.
   The applicant maintains that the benefits arising from works to the golf club and a
   commitment that each house will pay for one membership for 10 years justify the conflict with
   the planning scheme. Whilst acknowledging the financial benefits for the golf club, the
   proposed benefits do not overcome the proposal’s conflict with the planning scheme, as there
   are limited wider community benefits. Furthermore the golf club works and proposed
   memberships cannot be conditioned as part of an approval and require an Infrastructure
   Agreement be entered into to ensure that they are delivered. The Infrastructure Agreement
   which has been provided by the applicant does not ensure the delivery of the proposed
   works/financial contributions to the Cooroy Golf Club and requires amendment.
   As a consequence of the proposal’s significant conflicts with the Noosa Plan 2006 and Noosa
   Plan 2020 it is recommended that the application be refused.

   Departments/Sections Consulted:

        Chief Executive Officer          Community Services                          Corporate Services
        Executive Officer                Community Development                       Financial Services
        Executive Support                Community Facilities                        ICT
                                         Libraries & Galleries                       Procurement & Fleet
                                         Local Laws                                  Property
                                     x   Waste & Environmental Health                Revenue Services

        Executive Services           x   Environment & Sustainable Development       Infrastructure Services
        Community Engagement             Building & Plumbing Services                Asset Management
        Customer Service             x   Development Assessment                      Buildings and Facilities
        Governance                       Economic Development                        Civil Operations
        People and Culture           x   Environmental Services                      Disaster Management
                                         Strategic Land Use Planning             x   Infrastructure Planning,
                                     x
                                                                                     Design and Delivery




                                                                                        Page 56 of 80

Section 57

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021




                                    Page 57 of 80

GENERAL COMMITTEE MEETING AGENDA                                                                                         15 MARCH 2021

                                                                                                                 :                                   AllACHMEN | —~
                             a                                    * 2 ™                  «                        X                             ‘
                               > f            >                           ae                                         x
                                                                 BUGGY STORE                                                 A                                              ;
                                         .                        a                                                                 |                                                                     .
                                            '                                                                               *              \                                  |
                                             4                                                                                               Me                               |
                                                                                              Of
                                                                                           \ PROPOSED
                                                                                            NEW CARPARK.                                                       a
                                                                                                ~~                                   Teemce                        .

             a                                                                                                     J         PROPOSED        /
              |                                                 aoe                                                         GOLF CLUB                           *»
                                                                                                                              HOUSE                                       _
                .                                                a       :                                     ENTRY                         4           SS
                                                                                                                                             q         BO     |
                                      :                                                                    a             \                       Sew
                  .                                                                                                                   j         !  oe     Nt
                                                                                                                      ASSEMBLI
                                                                                          =                                                 ae
                                      |                                                      |                                           s
                                                                                         |       5                                MA

                                                                      }            cs
                                                                                                                                                 Oy
          ae) eds)   OOO US               Seg                         |           {
                                                                ore rr                                                               JAREDPOOLEDESIGN
         Ee                                                     Soares. Mec amucnatr mm                                              siasraBat      pat  ee   Te      FC   HOUSE      ~     SPIN 4SK/1.03    eal
             ee                                                                                                                      AHIIS PRACT UL TIS abe                                                   u
       SSS Err                                                                                                GemLifel °°":                         a                                                ma
                                                                ee la                                  <7        GemLile             ace.           3 oe                                        mae          wy
     Docume  SUID:  6410                                                                                                                                                                    ==    r       E
     Version: 1, Version Date: 23/12/2020
                                                                                                                             Page 57 of 80

Section 58

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021




                                    Page 58 of 80

mono                             0      6,00    yp 2510 90, 2100
     FOR APPROVAL                                                                              DECKITERRACE                      A
5	1	1	1	2	5	1920	409	51	30	15	pane
5	1	1	1	2	6	1975	424	21	14	61	AR
5	1	1	1	2	7	1999	405	18	43	58	OOH
5	1	1	1	2	8	2082	411	38	37	63	WASTE
4	1	1	1	3	0	389	442	1812	38	-1	
5	1	1	1	3	1	389	453	24	16	95	NOT
5	1	1	1	3	2	420	453	24	17	95	FOR
5	1	1	1	3	3	451	442	98	37	96	CONSTRUCTION
5	1	1	1	3	4	1163	442	36	37	63	5.100
5	1	1	1	3	5	1259	443	19	37	42	Oy
5	1	1	1	3	6	1407	455	29	14	41	960
5	1	1	1	3	7	1558	455	29	16	8	90.
5	1	1	1	3	8	1716	443	35	36	59	9.060
5	1	1	1	3	9	1878	455	22	16	55	90
5	1	1	1	3	10	1892	443	18	36	1	y-
5	1	1	1	3	11	1916	455	66	15	8	“600,90
5	1	1	1	3	12	2042	442	24	37	51	510
5	1	1	1	3	13	2130	455	12	14	32	Oy
5	1	1	1	3	14	2173	455	28	14	61	2100
4	1	1	1	4	0	1163	492	1045	37	-1	
5	1	1	1	4	1	1163	492	36	37	59	5.100
5	1	1	1	4	2	1257	505	12	14	48	90
5	1	1	1	4	3	1418	505	18	15	25	60
5	1	1	1	4	4	1558	505	18	14	24	190
5	1	1	1	4	5	1715	492	30	37	79	9.260
5	1	1	1	4	6	1878	505	12	14	48	90
5	1	1	1	4	7	1958	505	28	15	32	ari
5	1	1	1	4	8	2038	505	21	16	29	Hy
5	1	1	1	4	9	2091	505	28	15	0	_2.70
5	1	1	1	4	10	2150	505	22	16	17	90
5	1	1	1	4	11	2180	505	28	15	61	2.100
4	1	1	1	5	0	1589	524	541	13	-1	
5	1	1	1	5	1	1589	527	1	6	44	T
5	1	1	1	5	2	2077	524	53	13	22	DISABLE
5	1	1	1	5	3	2118	520	16	25	46	T.
4	1	1	1	6	0	1707	646	983	44	-1	
5	1	1	1	6	1	1707	646	73	44	96	VIEWING
5	1	1	1	6	2	2076	664	61	22	6	nooo
5	1	1	1	6	3	2676	670	14	20	40	s
4	1	1	1	7	0	672	689	2065	32	-1	
5	1	1	1	7	1	672	693	14	21	39	S
5	1	1	1	7	2	1357	689	76	32	96	TERRACE
5	1	1	1	7	3	1706	689	76	32	96	TERRACE
5	1	1	1	7	4	1929	699	102	14	76	AIR-CONDITIONING
5	1	1	1	7	5	2041	689	43	34	38	«J
5	1	1	1	7	6	2095	694	42	25	34	~~
5	1	1	1	7	7	2658	692	32	27	66	Se
5	1	1	1	7	8	2723	703	14	12	50	=
4	1	1	1	8	0	1364	707	1375	39	-1	
5	1	1	1	8	1	1364	724	19	15	26	102
5	1	1	1	8	2	1384	707	32	37	5	semTS
5	1	1	1	8	3	1720	720	49	26	49	‘SENS
5	1	1	1	8	4	1923	708	38	36	95	POWER
5	1	1	1	8	5	1967	708	35	36	77	BOARD
5	1	1	1	8	6	2003	708	39	36	74	SOLAR
5	1	1	1	8	7	2057	708	12	36	58	J
5	1	1	1	8	8	2076	727	1	8	29	|
5	1	1	1	8	9	2136	727	1	8	33	|
5	1	1	1	8	10	2676	721	14	9	16	-
5	1	1	1	8	11	2723	717	16	15	24	=
4	1	1	1	9	0	1730	728	407	32	-1	
5	1	1	1	9	1	1730	728	20	32	26	Son
5	1	1	1	9	2	2076	744	44	4	0	H--
5	1	1	1	9	3	2128	744	9	4	45	5
4	1	1	1	10	0	1377	750	764	20	-1	
5	1	1	1	10	1	1377	750	32	15	41	Nea
5	1	1	1	10	2	2074	756	37	14	84	WASTE
5	1	1	1	10	3	2117	756	24	14	84	BINS
4	1	1	1	11	0	2723	782	30	23	-1	
5	1	1	1	11	1	2723	782	30	23	81	*
4	1	1	1	12	0	672	800	1999	96	-1	
5	1	1	1	12	1	672	827	14	5	64	3
5	1	1	1	12	2	1486	817	97	2	4	i
5	1	1	1	12	3	1845	800	54	58	25	RY
5	1	1	1	12	4	2019	800	49	37	94	FEMALE
5	1	1	1	12	5	2121	817	27	79	68	|
5	1	1	1	12	6	2658	827	13	5	55	3
4	1	1	1	13	0	1866	855	274	41	-1	
5	1	1	1	13	1	1866	855	31	31	0	y
5	1	1	1	13	2	2010	878	40	18	16	OI
5	1	1	1	13	3	2099	878	41	18	0	ata
4	1	1	1	14	0	2082	894	655	37	-1	
5	1	1	1	14	1	2082	894	25	37	43	\EAN
5	1	1	1	14	2	2106	894	35	37	87	ROOM
5	1	1	1	14	3	2708	901	29	28	61	ge
4	1	1	1	15	0	1906	924	831	35	-1	
5	1	1	1	15	1	1906	924	25	34	16	“A
5	1	1	1	15	2	2121	925	9	34	15	WU
5	1	1	1	15	3	2676	933	14	23	51	Ss
5	1	1	1	15	4	2723	942	14	12	21	s
4	1	1	1	16	0	1670	945	1020	42	-1	
5	1	1	1	16	1	1670	950	84	19	96	FUNCTION
5	1	1	1	16	2	1762	950	49	19	95	ROOM
5	1	1	1	16	3	2054	946	1	41	96	|
5	1	1	1	16	4	2088	945	25	33	81	We
5	1	1	1	16	5	2658	957	32	21	66	se
4	1	1	1	17	0	1586	972	1153	35	-1	
5	1	1	1	17	1	1586	979	1	10	84	|
5	1	1	1	17	2	1716	983	12	14	79	48
5	1	1	1	17	3	1729	972	35	35	86	SEATS
5	1	1	1	17	4	2055	995	1	3	75	|
5	1	1	1	17	5	2658	977	32	23	16	e
5	1	1	1	17	6	2723	976	16	21	0	&
4	1	1	1	18	0	1369	981	1368	53	-1	
5	1	1	1	18	1	1369	981	112	43	96	RESTAURANT
5	1	1	1	18	2	1736	1001	21	16	33	ne
5	1	1	1	18	3	2055	987	24	44	20	I,
5	1	1	1	18	4	2113	983	26	51	5	Pe
5	1	1	1	18	5	2676	998	61	17	67	BS
4	1	1	1	19	0	691	1014	2046	38	-1	
5	1	1	1	19	1	691	1045	13	6	0	Z
5	1	1	1	19	2	1401	1025	12	13	39	SO
5	1	1	1	19	3	1418	1014	32	33	62	SEATS
5	1	1	1	19	4	2039	1026	101	26	45	TOTO
5	1	1	1	19	5	2723	1041	14	6	26	7
4	1	1	1	20	0	683	1031	2054	58	-1	
5	1	1	1	20	1	683	1059	22	30	2	8
5	1	1	1	20	2	1916	1066	28	14	0	“gon
5	1	1	1	20	3	2091	1031	15	57	0	HS
5	1	1	1	20	4	2723	1071	14	12	41	2
4	1	1	1	21	0	672	1074	2067	37	-1	
5	1	1	1	21	1	672	1084	33	23	35	oe
5	1	1	1	21	2	2019	1074	27	37	70	HALE
5	1	1	1	21	3	2209	1094	8	5	42	4
5	1	1	1	21	4	2723	1086	16	14	93	5
4	1	1	1	22	0	1953	1111	784	36	-1	
5	1	1	1	22	1	1953	1111	126	36	51	[ooo]
5	1	1	1	22	2	2658	1115	13	12	30	a
5	1	1	1	22	3	2723	1118	14	12	68	&
4	1	1	1	23	0	1649	1139	250	37	-1	
5	1	1	1	23	1	1649	1139	21	23	49	—=>
5	1	1	1	23	2	1867	1140	32	36	35	A]
4	1	1	1	24	0	2658	1160	81	21	-1	
5	1	1	1	24	1	2658	1160	13	17	66	a
5	1	1	1	24	2	2723	1160	16	21	12	8
4	1	1	1	25	0	1729	1169	1008	45	-1	
5	1	1	1	25	1	1729	1199	63	7	33	—
5	1	1	1	25	2	1856	1169	41	38	29	(|
5	1	1	1	25	3	2649	1169	22	27	65	ay
5	1	1	1	25	4	2708	1182	29	32	39	a
4	1	1	1	26	0	606	1203	2198	50	-1	
5	1	1	1	26	1	606	1221	13	12	12	S
5	1	1	1	26	2	1409	1213	19	13	63	203
5	1	1	1	26	3	1433	1210	13	17	44	08
5	1	1	1	26	4	1642	1207	17	42	85	|
5	1	1	1	26	5	1658	1203	35	50	54	|
5	1	1	1	26	6	1692	1219	27	1	54	1
5	1	1	1	26	7	1752	1207	17	17	82	Y
5	1	1	1	26	8	1793	1207	173	25	22	(07
5	1	1	1	26	9	2092	1214	55	16	24	wo]
5	1	1	1	26	10	2658	1217	13	12	0	S
5	1	1	1	26	11	2742	1226	14	7	59	LE
5	1	1	1	26	12	2790	1221	14	12	58	os
4	1	1	1	27	0	606	1229	2199	33	-1	
5	1	1	1	27	1	606	1235	15	21	0	S
5	1	1	1	27	2	1741	1229	30	33	72	our
5	1	1	1	27	3	2742	1235	63	22	69	Ba
4	1	1	1	28	0	1834	1234	922	67	-1	
5	1	1	1	28	1	1834	1237	78	44	96	KITCHEN
5	1	1	1	28	2	1946	1234	19	67	86	|
5	1	1	1	28	3	2092	1241	15	16	51	i
5	1	1	1	28	4	2723	1246	33	28	51	BE
4	1	1	1	29	0	2742	1274	14	13	-1	
5	1	1	1	29	1	2738	1270	11	22	47	ra
4	1	1	1	30	0	1794	1293	9	16	-1	
5	1	1	1	30	1	1794	1293	9	16	25	i
4	1	1	1	31	0	682	1310	2055	37	-1	
5	1	1	1	31	1	682	1317	4	5	6	:
5	1	1	1	31	2	1497	1310	30	37	91	WALL
5	1	1	1	31	3	1533	1310	51	37	44	MOUNTED
5	1	1	1	31	4	1585	1310	49	37	27	TVVER
5	1	1	1	31	5	2708	1320	29	23	27	5s
4	1	1	1	32	0	1287	1329	1450	41	-1	
5	1	1	1	32	1	1287	1356	38	14	32	eam
5	1	1	1	32	2	1497	1331	21	37	94	AND
5	1	1	1	32	3	1525	1331	36	37	88	HONOR
5	1	1	1	32	4	1560	1331	46	37	66	EOARD,
5	1	1	1	32	5	1883	1329	27	37	76	rep
5	1	1	1	32	6	2676	1359	14	5	42	_
4	1	1	1	33	0	1305	1356	1432	35	-1	
5	1	1	1	33	1	1305	1377	18	14	15	aD
5	1	1	1	33	2	1488	1356	43	31	96	REFER
5	1	1	1	33	3	1537	1356	43	31	92	SECTION
5	1	1	1	33	4	1588	1365	47	14	48	B-E—>
5	1	1	1	33	5	1763	1360	20	14	54	ERR
5	1	1	1	33	6	1855	1356	16	31	22	eS
5	1	1	1	33	7	2209	1379	8	5	47	J
5	1	1	1	33	8	2658	1366	32	21	72	se
5	1	1	1	33	9	2723	1362	14	5	45	>
4	1	1	1	34	0	1395	1368	1295	46	-1	
5	1	1	1	34	1	1395	1368	50	42	96	CAFE
5	1	1	1	34	2	1757	1381	53	29	29	sow)
5	1	1	1	34	3	1859	1385	13	29	25	fz
5	1	1	1	34	4	2658	1387	32	16	66	Be
4	1	1	1	35	0	1401	1402	1355	37	-1	
5	1	1	1	35	1	1401	1402	49	37	8	A0SEATS
5	1	1	1	35	2	1585	1416	33	20	96	BAR
5	1	1	1	35	3	2742	1419	14	15	33	ks
4	1	1	1	36	0	672	1426	2084	45	-1	
5	1	1	1	36	1	672	1439	33	20	26	se
5	1	1	1	36	2	1655	1429	17	42	57	|
5	1	1	1	36	3	1987	1426	33	36	44	cou
5	1	1	1	36	4	2103	1440	20	13	64	ony
5	1	1	1	36	5	2723	1435	33	25	74	se
4	1	1	1	37	0	672	1447	2084	37	-1	
5	1	1	1	37	1	672	1460	33	7	57	se
5	1	1	1	37	2	2000	1447	27	37	11	AGS
5	1	1	1	37	3	2723	1458	33	16	31	5B
4	1	1	1	38	0	1642	1472	1113	36	-1	
5	1	1	1	38	1	1642	1475	2	33	7	f
5	1	1	1	38	2	1781	1474	30	25	56	9,090
5	1	1	1	38	3	1948	1479	26	13	45	HOE
5	1	1	1	38	4	1999	1478	28	15	66	3000
5	1	1	1	38	5	2050	1478	24	14	59	90}
5	1	1	1	38	6	2079	1474	13	25	94	|
5	1	1	1	38	7	2097	1478	28	15	53	2330
5	1	1	1	38	8	2733	1472	22	29	0	[-
4	1	1	1	39	0	1270	1491	1416	103	-1	
5	1	1	1	39	1	1270	1524	4	70	92	|
5	1	1	1	39	2	1642	1491	199	58	40	ors
5	1	1	1	39	3	1845	1516	40	21	55	—
5	1	1	1	39	4	1947	1491	156	58	0	Tt
5	1	1	1	39	5	2112	1495	37	42	61	4
5	1	1	1	39	6	2677	1537	9	1	40	L
4	1	1	1	40	0	690	1577	1981	41	-1	
5	1	1	1	40	1	690	1578	10	38	0	By
5	1	1	1	40	2	1491	1578	34	38	39	Cham
5	1	1	1	40	3	1732	1577	34	41	39	Kl
5	1	1	1	40	4	2658	1591	13	12	0	s
4	1	1	1	41	0	672	1603	2084	46	-1	
5	1	1	1	41	1	672	1621	33	23	29	=e
5	1	1	1	41	2	1355	1603	75	46	94	GOLFERS
5	1	1	1	41	3	1548	1620	51	20	34	FoveR
5	1	1	1	41	4	1630	1628	11	11	26	by
5	1	1	1	41	5	1968	1618	33	21	95	PRO
5	1	1	1	41	6	2011	1618	44	20	95	SHOP
5	1	1	1	41	7	2723	1625	33	21	39	_s
4	1	1	1	42	0	672	1633	2084	41	-1	
5	1	1	1	42	1	672	1645	33	20	57	Se
5	1	1	1	42	2	1359	1636	66	38	96	LOUNGE
5	1	1	1	42	3	1569	1636	38	38	0	SIGX
5	1	1	1	42	4	1614	1650	7	14	83	IN
5	1	1	1	42	5	1993	1633	30	38	35	sont
5	1	1	1	42	6	2658	1656	32	9	70	ay
5	1	1	1	42	7	2723	1645	33	22	53	Ze
4	1	1	1	43	0	691	1650	2065	38	-1	
5	1	1	1	43	1	691	1667	14	19	60	=
5	1	1	1	43	2	1368	1651	48	37	0	10StATS
5	1	1	1	43	3	1789	1650	21	37	84	FILE
5	1	1	1	43	4	1816	1650	34	37	88	PHOTO
5	1	1	1	43	5	2658	1662	32	22	87	se
5	1	1	1	43	6	2742	1667	14	12	30	Ve
4	1	1	1	44	0	684	1674	2006	30	-1	
5	1	1	1	44	1	684	1674	16	30	45	iS
5	1	1	1	44	2	1379	1683	31	16	69	Une
5	1	1	1	44	3	1501	1674	140	30	51	pod
5	1	1	1	44	4	2658	1683	32	10	42	aS
4	1	1	1	45	0	672	1715	1025	45	-1	
5	1	1	1	45	1	672	1721	14	11	3	:
5	1	1	1	45	2	1509	1715	1	3	36	|
5	1	1	1	45	3	1647	1725	50	35	67	=
4	1	1	1	46	0	672	1765	674	64	-1	
5	1	1	1	46	1	672	1796	14	5	0	:
5	1	1	1	46	2	1170	1765	176	64	16	Rt
4	1	1	1	47	0	672	1808	2067	86	-1	
5	1	1	1	47	1	672	1809	14	15	45	5
5	1	1	1	47	2	1547	1812	53	20	96	ENTRY
5	1	1	1	47	3	1649	1827	55	67	0	|
5	1	1	1	47	4	1843	1808	87	33	96	ASSEMBLY
5	1	1	1	47	5	1932	1808	53	33	96	AREA
5	1	1	1	47	6	2658	1816	13	19	25	s
5	1	1	1	47	7	2723	1813	16	28	35	S|
4	1	1	1	48	0	1345	1931	903	37	-1	
5	1	1	1	48	1	1345	1931	29	37	56	18990
5	1	1	1	48	2	1686	1944	28	15	1	3600_
5	1	1	1	48	3	1746	1944	12	14	1	Oy
5	1	1	1	48	4	1798	1944	63	15	41	30090
5	1	1	1	48	5	1869	1954	7	6	42	p
5	1	1	1	48	6	1989	1944	27	15	35	aan
5	1	1	1	48	7	2130	1944	27	16	59	Oy
5	1	1	1	48	8	2170	1944	78	19	38	1910190
4	1	1	1	49	0	1107	1957	591	70	-1	
5	1	1	1	49	1	1107	1957	591	70	22	Pigg
4	1	1	1	50	0	370	1994	1312	29	-1	
5	1	1	1	50	1	370	1994	62	29	96	GOLF
5	1	1	1	50	2	443	1994	63	29	90	CLUB
5	1	1	1	50	3	518	2010	8	3	90	-
5	1	1	1	50	4	537	1994	143	29	96	DIMENSION
5	1	1	1	50	5	693	1994	64	29	93	PLAN
5	1	1	1	50	6	791	2012	43	11	35	isis
5	1	1	1	50	7	1647	2001	35	15	47	32500
4	1	1	1	51	0	1638	2022	1	23	-1	
5	1	1	1	51	1	1638	2022	1	23	81	|
4	1	1	1	52	0	1099	2078	1927	25	-1	
5	1	1	1	52	1	1098	2080	141	28	0	sews
5	1	1	1	52	2	1206	2067	35	45	0	ee
5	1	1	1	52	3	1262	2086	36	10	0	Trae
5	1	1	1	52	4	2020	2079	322	24	26	JAREDPOOLEDESTN
5	1	1	1	52	5	2359	2078	667	25	0	—_—_——_——__—E___
4	1	1	1	53	0	1098	2093	1606	37	-1	
5	1	1	1	53	1	1098	2092	24	37	47	fae
5	1	1	1	53	2	1133	2111	103	7	0	Wey

                                                                              | PROPOSED NEW DEVELOPMENT                                                          ;           ‘nt       ia            ita
                                                                  SESS 2        Wrasse como a                                                  Siow von         REE eg         LU -DsON PL                  mr
   eR                                                             rrr                                        ™                       z                     ee
                                                                  re            |e                           2           GemLife|              2:
5	1	1	1	56	6	2223	2188	113	29	41	Bs
4	1	1	1	57	0	309	2209	2027	40	-1	
5	1	1	1	57	1	309	2235	65	14	1	Comin
5	1	1	1	57	2	406	2209	12	33	0	da
5	1	1	1	57	3	439	2238	102	9	8	een
5	1	1	1	57	4	1099	2216	139	17	0	sana
                                                                                [BEML                                                          oe     co        eee
Version: 1, Version Date: 23/12/2020

Section 59

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021




                                    Page 59 of 80

NOT FOR CONSTRUCTION

                                                            \WEATHERBOARD WITH PRINT FINISH                                                                                   SELECTED METAL ROOF SHEETING & 3° TO 6°
                                                            SELECTED GLASS ENTRY DOOR                                                                                          METAL SHROUD WITH POWDERED COAT FIN SH
                                                            SELECTED STON CLAOCING                                                              es                             DISIGNER OWED PLOCKWORK
                                                           SELECTED METAL WALL CLADDING                                           SS.         mae s                                                ‘,
                                      ,                                                                                         Re             Re                                                 Si
                         uth:    SORES     «                BUILDING HECGAT                                                    ih ty    ee EO cee                                         site   PR                                                   ,
                        ae ake           By                                                         ieee a aa                  emit Sena Top ERR      DS            5                     Meg Bh   Boag                                            as
                                  en                                       mi                                |                                                                            —                                                        -
                               tape  Fe ge heme                                             Lettre                    Sr          Re SS       Rae tae pS pS pew                         Sil   eas       Tees                                     suainis
                       Bae ore       aan ae                                       (HT)              ees       42 | a                      Ee)  |S                 Ss    be                           gta to                             a,      Yee
                                         Pee «                             ||   ee                      |                                      ES                 a                           mteeeme              Tn)
                        i    “age aratitet                 fo     PTS ULL              ee ht LL        i        A   —                     EI  poo                 =    po                         io                ey,     i             (:            A
                                                            PROPOSED GROUND LINE 0 CW ENG NEERS DESIGN

ELEVATION 01
                                                                                                    -   ae.                                ,                                   STEEL POSTS AND BEAMS ‘HOT DIPPEO' WITH PANT FINSH
                                                                                                    “ee ie ‘                          i: ie ee,                                WEATHERBOARO WITH PAINT FISH
                            wh,                                                                      gees                     ee                                               DESIGNER HONED"
                         Fe apse                                                                     BSR   et BS             ee         ae     ais                             BLDERWDRE                  D
                 yt:       IR as                                                               Bole Ge   Es                    Tee     ds  Ne                                                         y aN                                              et
                see                                            Tn:                                                                                                                                                                                    one
             ie            eee                                       seers | UITTTIVTUID) HL                                                                                               ee     i Wit Tare                                       Lag
                          ae                                ee |                                                    SSS            aE       SS SS             SS                        ee            eae        ne

ELEVATION 02

GOLF CLUB - ELEVATIONS anc
                                                                     ise eeae's      [propose Nav OOELOPMENT                                                 ===
                                                                     CaS Pe ie a                                                                                                   1.
                                                                     iedirbetiatiauer a T1012 8.3, MYALL STREET, COOROY, OLD                                 amare ernst        Ee                                                           :             iy
                                                   eee Fer eters                                                      a ™                         .          retriwareraeun — EEereaeregees [owil [=
=                                                                    eset |                                            <     »  GemLife|                                2:
5	1	1	1	30	8	2223	2184	113	33	36	Bee
4	1	1	1	31	0	336	2188	1992	64	-1	
5	1	1	1	31	1	1095	2192	34	44	34	Ba
5	1	1	1	31	2	1263	2212	56	16	27	[ir
5	1	1	1	31	3	1616	2188	49	64	59	\=
5	1	1	1	31	4	2019	2210	163	27	3	occu
5	1	1	1	31	5	2221	2211	115	26	0	Bee
4	1	1	1	32	0	309	2235	232	14	-1	
5	1	1	1	32	1	309	2235	65	14	35	DosUMENT
5	1	1	1	32	2	413	2238	40	11	4	SEND
5	1	1	1	32	3	505	2238	36	9	4	21326410
4	1	1	1	33	0	307	2259	306	16	-1	
5	1	1	1	33	1	307	2259	67	13	95	Version:
5	1	1	1	33	2	382	2259	13	16	96	1,
5	1	1	1	33	3	401	2259	62	16	96	Version
5	1	1	1	33	4	472	2259	42	13	96	Date:
5	1	1	1	33	5	521	2259	92	13	95	23/12/2020
4	1	1	1	34	0	1918	2287	288	42	-1	
5	1	1	1	34	1	1918	2287	105	42	95	Page
5	1	1	1	34	2	2040	2287	47	33	95	59
5	1	1	1	34	3	2103	2287	43	33	96	of
5	1	1	1	34	4	2159	2287	47	33	96	80

Section 60

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021




                                    Page 60 of 80

NOT FOR CONSTRUCTION

                                                                  DESIGNER ‘HON ED" BLOCKWORK                                                                                     SELECTED METAL RODF SHEETING fd 3° TU 5°
                                                                 WEATH ERBOARD WITH PAINT FINISH                                                                                  RAKING CEILING LINING AND EXPRESS ED JOINTS:
     ss   ,                                                                                                                                                                                                                se
    Ea                                                                                                                                                                                                          Soest    a
    a      ee                            Mee                                    FOE                                                                                                                              See eR           eee
    med ae Re                            eae                                      SS                                                                          Tse                                              susiitae geome 82 os Seas
     Rit. Tees                         Re     at                               Pea                                                                                     Ea                                       IRAE Re La iat es th
    TOR                               okie’                                    SS     ae                                   sae                                 alae                                            So) gid Porn, tae
    Papert          Dh ®                    si                                 a                       anon                iy           =                  1a) |                                                    DID ate es      Pa
      ee                es                  ors                                ee                     ey                  co          =                     Ve         ET                                           Seg Sse                        <j
                                                                                                                                                                                                                    See        3%,

                                                                                                                                                                                  PROPOSED GROUND LINE TO CIVIL ENGINEERS DESIGN

      ELEVATION 03

                                                                                                                                                                                  ‘STEEL POSTS AND BEAMS ‘HOT DIPPED' WITH PAINT FINISH
                                                                                                                                                                                  WEATHERBOARD WITH PAINT FINISH
                        Bus.      .                                                                                                                                               DESIGNER HONED' BLOCKWORK                                             ; Se.
                       ja aes es                                                                                                                                                                                                                       Bak =
                        SHE       eee                                                                                                                                                   oo                                                         fee  PS
                     hing aces:                               UTEEUUIIIII M TUTUITTEEUIIIII IT TTTTUUTTTTETUIITTETOTTTTTTTEEUIT             TTTCCOTTTTTTTTTTIT UTC                ea                                                             ete
                      peg     ty ee                           PECL               Seer |                                                                                          | | P|                                                           gee
                   Sr         Reg   ee                        Gee                                                                 III        ATI          TI UIT                                                                                Se,
                        be           Rik                                                                [                                             MCRIELEI ELI                                                                                ;       aw
                      Vee            eat irct                  SS al                                                     7         ———      |         ROR)                  fet Od Poo                                                         ST ita
                     eS ee                                            = —                            4}                           S—                  HE) | ey                                                                                     ee
                     Bate saat    Pipe eae                     SSS                                    §                             SS                Hee                   fg beer FO}                                                              Rows ve
                      a, ce     7   Bs                        Pe                                         Et et                                                                a        |               =                                             Stale oe
                         Senge She                                                                                                                                                                                                                          -
                      be oe, Senate

      ELEVATION 04

      GOLF CLUB - ELEVATIONS eu
                                                                          maemo ed (ram                                                                          JAREDPOOLEDESTN —_—_——_——__—E___
                                                                          dius tft oume wer rae | PROPOSED NEW DEVELOPMENT                                                            1            ‘n__2 bm    fm              ‘Atm
   [ota rc                                                                Ye |                                                                                   Le 13 NHCRH AVENE Be            [Fan                                 TENT                  aE
                                                                          SHIBSGENGUE A   TLpT 2 & 3, MYALL STREET, COORCY, OLD                                  atasimo a0 cium    Regs         [GOLF CLUB - ELEVATIONS              ETUDE                  a
                                                    ee                    Sua   ro                                        4     N                     <      soa | (SLEOF CAPRI OLD. 4217 AUSTRALIA Base
      r                                                                   averariae       |i                               K     yGWEMLITE)                     *          nsisn    See
Dott  ae            re                                                    ett"            EMLIFE                          \=                                    Ne       MRWEUGIA     a
Version: 1, Version Date: 23/12/2020
                                                                                                                                                       Page 60 of 80

Section 61

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021




                                    Page 61 of 80

GENERAL COMMITTEE MEETING AGENDA                                                                                         15 MARCH 2021

         FOR APPROVAL
          NOT FOR CONSTRUCTION

                                           a                                             BE                 Pm                        ace},                 |                         ae   epee
                                                     jE a                                                                                                                              a
                                               |                 ,                                   tt                                    ty                                               ene

          SECTION A-A

                                               ye hay.                                     YALL MOUNTED TH,                                                               mm     ye ES

                                                 oo                          Et
                          a          i ah tat es aa                               hi               d       7    7                               FE                           a fs  ee

          SECTION B-B
          GOLF CLUB -SECTIONS — iaeu
                                                                veMenmsted Trac                                                     TAREDPOOLEES OS PEE
      [a [S07 [ISSUED FOR APPR,                                 bles tre oun it Pa, PROPOSED NEW DEVELOPMENT                                         .          ‘n__2 bm Sm          Aim
             eu                                                 intuit a [1] 2 & 8, MYALL STREET, COORG                                            ed               :                      :      —
                                                                ee eee                                BY GemLifel 2"                               eee
                                                                eee     na                                                          1"      iE
     es Ba                                                                   ae                       (/         GemLile|                          Eee                                     POOLE
    Version: ‘Leer stan Date: 23/12/2020
                                                                                                                            Page 61 of 80

Section 62

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021




                                    Page 62 of 80

GENERAL COMMITTEE MEETING AGENDA                                                              15 MARCH 2021

       FOR APPROVAL
         NOT FOR CONSTRUCTION

                                                                                              |

                                              ee ee
                                                                  CART STORE

                               |       |                                         PTX
                                                                                      LOCKER ROOM

                           as                                               C|

                                           ot                 son                0           0          bit)
                                           in                             5,690                         #
        CART/BUGGY STORE - FLOOR PLAN aco
      [ao                                        i et te te | PROPOSED NEW DEVELOPMENT                 Aen za                         2      Ef.    a
                                                  mentees [a                                                              Sea
          OO ————— Eo                                                 nn        aC                     SS an RRR
      ed rrr rr                                                                                 7    =| aoromenentm | — eae eee OnE aN
    = —————— ns                                                                 (<7 GemLife}?”"":                  Baa        =                  POOLE
   svarsitns aversion Date: 23/12/2020
                                                                                                 Page 62 of 80

Section 63

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021




                                    Page 63 of 80

08 40 ¢9 abed

      a             ‘i
    ae               ae                                    ANT9 4109 AOHOOD OL SSDNVHO GaSOdOYd ONIMOHS
    newos jobdub@weyess :jewe
    ican 09                                            LNVWid YSLSVIN LAVUC ISUNOD 4109
    ese          TND                                                              AOHO09 341139
                 JIOH G3SOd0"d

       a                            te   Pee SY      ae a       “ ae:   ee a     ~~»   0 ee                   ° NSA   SE =   >
                       :           a0, de            se Pp                  OS            ee
         suyeques 2p                 Sh eee           ge!   P     Lane —*     aS.      Na 007        oot   0s     9 ot 02 oF 0 0 I
          fy           (61)          oS    ee   Ri aE    | IF i      aA        .       be NS   SAN           SEA:       ya ee
           ifeieees   |              eS       = 01m      De               OSs, SESS     se Wear Se Se       ee,            ae
       foesrerereen sd             ee      Rees a       ;  4)             >   Ye           ‘a> SS WS SS .    a      Tee
         yes age vy —>}              ee                  as              ~,    ee      =   4 WAS           .           wes
     pog set a ——                 wn       ee as ee    un                os ¥    ar we      f. . Ge                     _
            snes — aa             .              ge Pa               Bee           es Ag Sy                 Dy      (am
    ‘S61poq J5Ne%A papUspLs 10 HON \ .   «     ty        We                            lant 2g      5      ‘            is
                   4                oD \   \So ng          ue       nes            ae          PSN           NUN    ae
         s>iim Ba   N                se     .        ee                  eo        pA lor          apes        Io            p
            —_—                    Aa       ee                                                  RS ele          NCS,
                  J10H DNILSIXA    \         a ae                             a.              a       Me SEN
                                      oe       Co  Coe           .               a           tithe oie os     SAX:
                      |                Wk     y          ee’     :                   te. |g    cat aa  Cee        =     SRK
       staan aus  ||
5	1	1	1	24	4	854	1254	5	12	0 2 oan  fN                  re   ee)         pea      ae           S       S
                                        \       aes        oe                          gt     ee ee >                      SNS
         weno; ——>|                      AY           Sony                            dR       Cage                        >
                   cys                  Wem               eh                       ee ¥         ee                        4 |
                                        sh 2      om      aN               eS         gs       A                 .      ca Ss
         eid tensey —"| |            Se   a SY      aS    iy    a                   SM       =   ih       %               |  ee
                i                    a \ . ot ‘6            Re’ ee                      oe                 :             Ph
                   \   }           A      a            Vw        *                   S   ee    ee                            fa
              oe       dD)            r Be \~\ S)       Oo
5	1	1	1	33	8	1145	1525	45	27	0	ee se ee                     he S|
            ssvung ——*r | \            Ae      ae     4       a"   a    Bs           aa tet ss y ¥.  i                ras    j
         weve ty —R_f                  at     \\    BO NR                                   a                         Sw
                       :          #     we    ees,   | SOE   gers PAS                Fi  “7        :          :      a et ae
                       me          FB          A     oO                                eS                            ep  pe
                                        a      be    ‘f      sy”      A             oo” Fe eR       \            a      %
               (uBisep pajeyap oF 30eKens) 2 ag 1        ae           a    :          ees    oe. h                 ‘     ,
                ubSop Pot                oe   te Vaasa, LS           i    4             Pee ae     A                         Y
           uge.6 Bupind eongesd wau janasuog (1) er AY , os  0) a A                       eee ay a               if   Pees
      epee met iae pmiser i [werent Laws     2 af  \ +   k  ce  Sy Wa vo a.           APO      Gs   ‘d   Ne    5    4 beh    |
    spud Bunsixe puspre ‘ej9IchuN00 8j0y mau >A4sUOD 7 \ ..   i ‘ee   Ds fe is,      m Fed       4 os’ r  x       id   al   c
                  crdunz-aLaeH CH)      ‘        ‘Wy (5) {     &     se    oa       a    a H OSS          aa,       +i re 4	1	1	1	44	0	313	1782	1772	86	-1	
5	1	1	1	44	1	313	1800	64	54	48	cise
5	1	1	1	44	2	381	1800	50	54	28	pomp
5	1	1	1	44	3	430	1800	68	54	0	cya)
5	1	1	1	44	4	502	1804	105	46	0	emus
5	1	1	1	44	5	651	1828	29	30	29	O
5	1	1	1	44	6	771	1818	7	9	30	es
5	1	1	1	44	7	837	1818	2	3	58	‘
5	1	1	1	44	8	969	1808	9	25	31	\
                                                    oD)        +    le 3 (2) s i ae           5 BS Cie     ri * F  4 A eas
                  fp sed wage ~ 11 20H * { i      4 \\ i    ee    +: Gay ME ot : ey      F oe       a Me    oe   y    ai * aH
  Sc Oe ©                                 (f               GR       ne.       |    Ae oP      RO            ¥ eg
                  Ged WPL            ms     Soa                 n      Se          eS)           gee      aR    se      we
2p Zt amy woe enue oupespue vos pao @ Fe, hoe mh t 4 _ \ea       Fy  o. ade   a) Fre                N eo bg          ee
      (uBisap pap eyap 0} palgns) wen Guysixe aoisaq bes , 3 3 bia i \ Vp i ri & SS ’ ra oY  fa     4 4  4 34h Py hs ae }
   vot Me ChE Nt sd ve aU pa ®)                 a fhe ee \ ea      rt PY        Pa       Carer   igs) Pitt) As : Ls    ee es
  usieap paverep olsoens uoyede| au w uasi6 Pungen @ a RE cn i AG K | ee ‘4 a. Phe F          S| fet    4 a \ A \iocr
                    oe            —        beet                   eB              hee?          So     oh TS
    ctnuitctegenctais              Wg     alas              Ns          te   ve                 e      &      ey    eas
                                   ea Ve     ae    PL at     RE    |        eS       i     Ns        3     e4        ~    a7
                                  cos or r      ate aS  ae ny Wy stad a    Fe   pe Hp se La    8 ie     , i      Bes oe
                   sed wigzz -Z4 a eS    et eal        aan       FP ae            b   +        3  eg      4   5  y          ae
    wse.on voc ch ns vn nau was      GE       a “ei       BN          t A ase           Ne
5	1	1	1	57	16	1667	2192	22	22	15	ee
5	1	1	1	57	17	1700	2168	43	62	25	ic)
5	1	1	1	57	18	1773	2196	16	26	5	i
5	1	1	1	57	19	1805	2173	42	54	0	-
5	1	1	1	57	20	1906	2182	28	56	0	*
5	1	1	1	57	21	1973	2186	81	57	21	hubs
5	1	1	1	57	22	2068	2196	25	43	12	Fi
4	1	1	1	58	0	500	2225	1482	17	-1	
5	1	1	1	58	1	500	2227	24	11	7	¢.4ed
5	1	1	1	58	2	537	2227	96	11	46	Weg)
5	1	1	1	58	3	573	2218	10	28	64	-
5	1	1	1	58	4	582	2218	22	28	55	Lb
5	1	1	1	58	5	603	2227	30	11	0	e10H
5	1	1	1	58	6	821	2237	3	4	0	eo
5	1	1	1	58	7	1016	2226	15	8	26	ee
5	1	1	1	58	8	1048	2226	51	15	31	ee.
5	1	1	1	58	9	1131	2228	15	10	62	EN
5	1	1	1	58	10	1237	2231	12	11	0	we
5	1	1	1	58	11	1321	2226	3	3	0	y
5	1	1	1	58	12	1380	2225	3	3	80	4
5	1	1	1	58	13	1548	2230	70	7	10	Sie)
5	1	1	1	58	14	1725	2226	17	16	29	a3
5	1	1	1	58	15	1822	2226	40	13	38	fe:
5	1	1	1	58	16	1933	2225	3	4	78	|
5	1	1	1	58	17	1953	2227	29	14	40	ae
4	1	1	1	59	0	525	2207	1546	71	-1	
5	1	1	1	59	1	525	2219	155	51	28	SO
5	1	1	1	59	2	736	2233	81	33	36	eg:
5	1	1	1	59	3	878	2240	49	27	17	gemma
5	1	1	1	59	4	1088	2221	250	54	29	Ne
5	1	1	1	59	5	1327	2203	40	80	29	Oe
5	1	1	1	59	6	1433	2263	3	2	10	hee
5	1	1	1	59	7	1549	2240	9	17	0	ca
5	1	1	1	59	8	1676	2218	33	53	35	ae
5	1	1	1	59	9	1827	2255	42	14	15	ae
4	1	1	1	60	0	290	2252	1746	52	-1	
5	1	1	1	60	1	290	2261	31	33	31	{Heo
5	1	1	1	60	2	326	2261	20	33	90	pue
5	1	1	1	60	3	348	2261	36	33	0	uiseq
5	1	1	1	60	4	392	2261	20	33	63	Ways
5	1	1	1	60	5	422	2261	69	33	35	uoRoUnTuco
5	1	1	1	60	6	498	2277	8	8	37	UI
5	1	1	1	60	7	511	2261	28	33	30	ses}
5	1	1	1	60	8	540	2261	26	33	31	mau
5	1	1	1	60	9	573	2261	61	33	0	oagsuOD
5	1	1	1	60	10	734	2272	26	13	34	bag
5	1	1	1	60	11	778	2252	14	52	27	oe
5	1	1	1	60	12	827	2271	169	24	40	ME
5	1	1	1	60	13	1026	2265	94	26	15	ha
5	1	1	1	60	14	1112	2261	20	39	22	ea
5	1	1	1	60	15	1146	2266	107	30	14	NAG
5	1	1	1	60	16	1355	2270	5	5	0	c
5	1	1	1	60	17	1442	2289	3	3	0	;
5	1	1	1	60	18	1475	2285	3	2	16	)
5	1	1	1	60	19	1520	2258	14	28	60	he
5	1	1	1	60	20	1590	2268	116	30	0	t/a
5	1	1	1	60	21	1762	2276	16	6	30	ae
5	1	1	1	60	22	1787	2261	22	41	71	|
5	1	1	1	60	23	1816	2267	107	25	30	ee
5	1	1	1	60	24	2003	2266	33	24	24	we
4	1	1	1	61	0	337	2284	1754	34	-1	
5	1	1	1	61	1	337	2291	29	14	16	Opn
5	1	1	1	61	2	377	2284	35	30	45	Hosa.
5	1	1	1	61	3	412	2294	18	11	72	10
5	1	1	1	61	4	435	2284	20	30	51	ped
5	1	1	1	61	5	457	2284	20	30	87	se
5	1	1	1	61	6	479	2284	55	30	30	pareysul
5	1	1	1	61	7	534	2284	20	30	64	aq
5	1	1	1	61	8	557	2284	14	30	55	cy
5	1	1	1	61	9	576	2284	57	30	43	Useq-oig
5	1	1	1	61	10	740	2291	104	23	5	Ces
5	1	1	1	61	11	864	2292	19	17	31	SR
5	1	1	1	61	12	899	2292	43	20	28	eh
5	1	1	1	61	13	988	2300	6	11	11	ee
5	1	1	1	61	14	1020	2292	127	22	31	ee
5	1	1	1	61	15	1183	2293	45	25	22	A
5	1	1	1	61	16	1345	2293	63	19	33	er.
5	1	1	1	61	17	1470	2287	16	30	47	|
5	1	1	1	61	18	1488	2287	28	30	38	ae
5	1	1	1	61	19	1519	2303	6	9	64	|
5	1	1	1	61	20	1588	2298	26	5	28	PS
5	1	1	1	61	21	1675	2310	6	4	0	y
5	1	1	1	61	22	1865	2287	15	25	18	a)
5	1	1	1	61	23	1943	2286	25	33	42	or
5	1	1	1	61	24	2086	2304	5	2	0	.
4	1	1	1	62	0	500	2295	1567	42	-1	
5	1	1	1	62	1	500	2302	31	28	40	€.42d
5	1	1	1	62	2	536	2302	35	28	45	WOR}
5	1	1	1	62	3	577	2314	4	2	87	-
5	1	1	1	62	4	585	2312	15	11	85	OF
5	1	1	1	62	5	606	2302	27	28	0	21H
5	1	1	1	62	6	643	2299	37	38	78	@)
5	1	1	1	62	7	760	2307	17	15	32	ie
5	1	1	1	62	8	789	2312	56	13	26	Bee
5	1	1	1	62	9	1048	2316	72	9	50	Rad
5	1	1	1	62	10	1171	2295	17	41	68	1
5	1	1	1	62	11	1206	2317	4	7	18	.
5	1	1	1	62	12	1240	2306	7	10	0	~
5	1	1	1	62	13	1366	2321	4	2	0	y
5	1	1	1	62	14	1494	2302	40	33	27	ban
5	1	1	1	62	15	1576	2296	34	39	56	(9)
5	1	1	1	62	16	1647	2315	93	10	15	deo
5	1	1	1	62	17	1955	2318	2	2	35	NE
5	1	1	1	62	18	2030	2296	37	28	31	e
4	1	1	1	63	0	756	2303	1337	54	-1	
5	1	1	1	63	1	756	2324	20	22	14	fe
5	1	1	1	63	2	792	2330	10	15	19	Me
5	1	1	1	63	3	814	2323	68	24	24	FRE
5	1	1	1	63	4	898	2330	6	6	26	ea
5	1	1	1	63	5	918	2322	54	22	10	ee
5	1	1	1	63	6	1017	2321	140	25	12	Ee
5	1	1	1	63	7	1185	2325	7	17	18	RO
5	1	1	1	63	8	1246	2324	38	23	31	SS
5	1	1	1	63	9	1315	2317	73	25	16	yee
5	1	1	1	63	10	1477	2303	62	51	25	Oy
5	1	1	1	63	11	1640	2324	38	23	2	gees
5	1	1	1	63	12	1702	2320	23	22	6	fad
5	1	1	1	63	13	1809	2323	22	24	42	PR
5	1	1	1	63	14	1938	2317	27	36	33	ae
5	1	1	1	63	15	1973	2332	30	13	23	A
5	1	1	1	63	16	2054	2325	39	32	42	aN
4	1	1	1	64	0	325	2328	1691	39	-1	
5	1	1	1	64	1	325	2328	25	34	8	uejd
5	1	1	1	64	2	355	2328	43	34	33	saysew
5	1	1	1	64	3	400	2328	46	34	0	esinoo
5	1	1	1	64	4	450	2328	41	34	0	jeseAo
5	1	1	1	64	5	491	2328	40	34	20	aunyn,
5	1	1	1	64	6	536	2328	9	34	87	jo
5	1	1	1	64	7	552	2328	22	34	35	ved
5	1	1	1	64	8	581	2328	10	34	29	Se
5	1	1	1	64	9	593	2344	40	11	2	[Ee
5	1	1	1	64	10	762	2357	2	2	25	a
5	1	1	1	64	11	836	2330	39	39	26	ay,
5	1	1	1	64	12	918	2354	9	8	20	FSS
5	1	1	1	64	13	951	2338	71	25	19	SO
5	1	1	1	64	14	1088	2346	89	17	26	ae
5	1	1	1	64	15	1239	2345	57	18	5	Si?
5	1	1	1	64	16	1337	2334	34	27	44	“Way
5	1	1	1	64	17	1481	2356	6	2	0	?
5	1	1	1	64	18	1614	2333	35	34	36	ao
5	1	1	1	64	19	1739	2360	3	2	46	he
5	1	1	1	64	20	1806	2347	55	16	11	he
5	1	1	1	64	21	1928	2354	18	13	29	My
5	1	1	1	64	22	1982	2338	34	24	49	WY
4	1	1	1	65	0	300	2345	1791	51	-1	
5	1	1	1	65	1	300	2361	10	8	53	Ul
5	1	1	1	65	2	316	2350	55	27	5	PaM@IADI
5	1	1	1	65	3	376	2361	13	11	28	Aq
5	1	1	1	65	4	395	2350	12	27	74	O1
5	1	1	1	65	5	413	2361	7	11	21	f
5	1	1	1	65	6	424	2350	20	27	52	Jed
5	1	1	1	65	7	446	2350	37	27	38	LUSOT
5	1	1	1	65	8	489	2361	5	8	39	©
5	1	1	1	65	9	498	2350	14	27	61	01
5	1	1	1	65	10	517	2350	40	27	24	PUSIXE
5	1	1	1	65	11	557	2350	18	27	64	02
5	1	1	1	65	12	580	2350	53	27	0	JENUAIOY
5	1	1	1	65	13	748	2361	54	19	17	i
5	1	1	1	65	14	829	2361	74	20	32	ee
5	1	1	1	65	15	925	2361	45	24	36	ag
5	1	1	1	65	16	1001	2362	75	20	11	Rae
5	1	1	1	65	17	1094	2358	32	12	0	a
5	1	1	1	65	18	1144	2362	23	11	18	an
5	1	1	1	65	19	1218	2371	22	10	23	hb
5	1	1	1	65	20	1335	2345	35	51	44	a
5	1	1	1	65	21	1468	2351	45	38	43	(8)
5	1	1	1	65	22	1576	2365	12	7	38	ed
5	1	1	1	65	23	1707	2364	38	17	21	Mee
5	1	1	1	65	24	1785	2364	33	17	47	ee
5	1	1	1	65	25	1962	2350	16	30	16	ol
5	1	1	1	65	26	2055	2350	36	31	0	Q
4	1	1	1	66	0	508	2351	1530	71	-1	
5	1	1	1	66	1	508	2376	125	14	0	predwezt-8010H
5	1	1	1	66	2	650	2369	30	29	20	(@)
5	1	1	1	66	3	735	2375	101	25	21	“Pere
5	1	1	1	66	4	969	2368	27	39	10	he
5	1	1	1	66	5	994	2376	115	27	46	Ce
5	1	1	1	66	6	1159	2379	25	12	14	teas
5	1	1	1	66	7	1206	2377	41	44	19	ws
5	1	1	1	66	8	1284	2373	27	31	14	NS
5	1	1	1	66	9	1324	2376	35	46	28	<
5	1	1	1	66	10	1379	2382	4	16	0	\
5	1	1	1	66	11	1479	2382	26	17	0	Dr
5	1	1	1	66	12	1627	2351	98	64	29	Obed
5	1	1	1	66	13	1753	2383	22	26	17	2
5	1	1	1	66	14	1798	2379	15	34	40	4
5	1	1	1	66	15	1851	2383	22	12	19	4
5	1	1	1	66	16	1924	2372	32	26	21	ae
5	1	1	1	66	17	2022	2393	16	14	0	%
4	1	1	1	67	0	330	2396	1701	32	-1	
5	1	1	1	67	1	330	2411	19	8	40	1601
5	1	1	1	67	2	371	2411	14	8	0	Krjua
5	1	1	1	67	3	394	2411	15	8	64	yno
5	1	1	1	67	4	426	2411	7	8	0	wed
5	1	1	1	67	5	457	2411	15	8	84	pue
5	1	1	1	67	6	473	2397	29	31	14	yled
5	1	1	1	67	7	509	2397	32	31	0	‘Sas]
5	1	1	1	67	8	542	2397	25	31	52	mau
5	1	1	1	67	9	601	2411	23	8	0	jongsuO’
5	1	1	1	67	10	737	2400	100	22	30	teams
5	1	1	1	67	11	1035	2399	26	23	33	ER
5	1	1	1	67	12	1087	2393	48	35	22	eee
5	1	1	1	67	13	1143	2405	36	15	28	age
5	1	1	1	67	14	1274	2393	36	35	17	ma
5	1	1	1	67	15	1442	2396	37	32	0	para
5	1	1	1	67	16	1493	2402	7	10	56	|
5	1	1	1	67	17	1723	2395	35	34	9	ee
5	1	1	1	67	18	1938	2399	12	10	6	eH
5	1	1	1	67	19	2022	2408	9	6	0	b
4	1	1	1	68	0	322	2399	1760	73	-1	
5	1	1	1	68	1	322	2411	7	11	44	pecs
5	1	1	1	68	2	354	2408	39	13	56	Ae
5	1	1	1	68	3	414	2395	12	48	23	ea
5	1	1	1	68	4	446	2395	24	48	45	pe
5	1	1	1	68	5	476	2409	158	30	0	reasons
5	1	1	1	68	6	651	2421	29	29	75	©
5	1	1	1	68	7	742	2420	44	43	24	=
5	1	1	1	68	8	794	2421	5	16	2	5
5	1	1	1	68	9	842	2426	5	20	49	ae
5	1	1	1	68	10	1010	2421	77	41	8	as
5	1	1	1	68	11	1123	2418	28	41	21	Se
5	1	1	1	68	12	1177	2446	7	4	0	;
5	1	1	1	68	13	1205	2406	11	54	8	;
5	1	1	1	68	14	1240	2420	19	14	25	os
5	1	1	1	68	15	1332	2403	59	62	29	Ne
5	1	1	1	68	16	1440	2419	17	50	31	i
5	1	1	1	68	17	1482	2400	17	64	17	hi
5	1	1	1	68	18	1564	2428	9	22	8	;
5	1	1	1	68	19	1588	2410	44	47	21	is
5	1	1	1	68	20	1649	2410	21	31	35	af
5	1	1	1	68	21	1735	2407	72	59	86	fy
5	1	1	1	68	22	1828	2423	23	28	0	cy
5	1	1	1	68	23	1911	2421	20	28	19	fy
5	1	1	1	68	24	1974	2399	108	73	40	=
4	1	1	1	69	0	361	2443	1678	80	-1	
5	1	1	1	69	1	361	2461	83	22	0	SMHOM
5	1	1	1	69	2	453	2461	94	22	79	410940
5	1	1	1	69	3	555	2461	120	22	0	NWS
5	1	1	1	69	4	1356	2459	106	46	29	bo
5	1	1	1	69	5	1485	2455	22	37	35	‘pe
5	1	1	1	69	6	1545	2449	32	53	45	FA
5	1	1	1	69	7	1583	2460	14	33	0	.
5	1	1	1	69	8	1626	2446	36	65	82	7
5	1	1	1	69	9	1712	2452	37	48	25	ce)
5	1	1	1	69	10	1754	2462	57	54	0	#
5	1	1	1	69	11	1875	2458	28	30	16	ee
5	1	1	1	69	12	1943	2443	96	80	33	ee
4	1	1	1	70	0	867	2490	1077	25	-1	
5	1	1	1	70	1	867	2502	3	2	0	e
5	1	1	1	70	2	962	2496	2	3	0	;
5	1	1	1	70	3	1058	2503	5	8	29	PE
5	1	1	1	70	4	1071	2491	170	21	32	eR
5	1	1	1	70	5	1257	2490	9	7	14	Ra
5	1	1	1	70	6	1330	2490	89	18	6	aN
5	1	1	1	70	7	1441	2491	17	20	15	iy
5	1	1	1	70	8	1560	2493	69	16	42	gy
5	1	1	1	70	9	1708	2501	11	14	0	y
5	1	1	1	70	10	1824	2491	6	12	25	Cl
5	1	1	1	70	11	1942	2509	2	6	11	:
4	1	1	1	71	0	336	2495	1746	72	-1	
5	1	1	1	71	1	336	2509	64	50	32	fmol
5	1	1	1	71	2	403	2509	26	50	74	om
5	1	1	1	71	3	440	2509	54	50	24	[|
5	1	1	1	71	4	499	2509	34	50	35	sox
5	1	1	1	71	5	545	2509	46	50	45	fol
5	1	1	1	71	6	809	2522	25	25	5	Ae
5	1	1	1	71	7	951	2520	4	4	5	:
5	1	1	1	71	8	1050	2512	127	37	30	ey
5	1	1	1	71	9	1228	2514	81	33	29	Geir
5	1	1	1	71	10	1403	2514	51	26	26	ear
5	1	1	1	71	11	1539	2530	1	17	6	|
5	1	1	1	71	12	1582	2501	54	55	0	6g
5	1	1	1	71	13	1678	2495	64	54	24	7
5	1	1	1	71	14	1777	2498	32	43	44	ue
5	1	1	1	71	15	1851	2522	70	40	55	-
5	1	1	1	71	16	2025	2513	57	54	0	SS
4	1	1	1	72	0	477	2558	1611	40	-1	
5	1	1	1	72	1	477	2558	65	40	12	[eee
5	1	1	1	72	2	541	2558	14	40	72	|
5	1	1	1	72	3	748	2573	50	8	17	Pe
5	1	1	1	72	4	860	2580	25	13	58	a
5	1	1	1	72	5	965	2574	27	18	35	A
5	1	1	1	72	6	1022	2574	6	3	22	gag
5	1	1	1	72	7	1082	2577	79	16	6	er
5	1	1	1	72	8	1176	2559	49	38	32	Se,
5	1	1	1	72	9	1233	2574	75	18	1	SS
5	1	1	1	72	10	1364	2575	3	2	20	Se
5	1	1	1	72	11	1378	2559	33	38	26	ah
5	1	1	1	72	12	1524	2575	16	13	16	re
5	1	1	1	72	13	1692	2574	9	13	0	%;
5	1	1	1	72	14	1796	2586	2	2	0	y
5	1	1	1	72	15	1867	2575	26	15	0	@
5	1	1	1	72	16	1944	2575	2	8	2	,
5	1	1	1	72	17	2032	2570	20	24	25	goa
4	1	1	1	73	0	340	2597	1744	69	-1	
5	1	1	1	73	1	340	2597	97	68	19	Peper
5	1	1	1	73	2	436	2597	46	68	34	be
5	1	1	1	73	3	496	2597	83	68	26	aba
5	1	1	1	73	4	761	2614	14	28	24	see
5	1	1	1	73	5	862	2603	56	54	1	i
5	1	1	1	73	6	960	2605	74	54	49	neh
5	1	1	1	73	7	1074	2609	80	53	22	es
5	1	1	1	73	8	1301	2616	129	29	16	Oe
5	1	1	1	73	9	1442	2616	198	35	30	hae
5	1	1	1	73	10	1665	2616	4	3	29	Ne
5	1	1	1	73	11	1744	2623	34	19	55	&
5	1	1	1	73	12	1819	2606	65	52	19	1a
5	1	1	1	73	13	1910	2621	26	22	48	|
5	1	1	1	73	14	2032	2599	52	67	16	ef
4	1	1	1	74	0	415	2631	1678	73	-1	
5	1	1	1	74	1	415	2658	115	46	35	eee
5	1	1	1	74	2	761	2660	56	27	20	ae
5	1	1	1	74	3	949	2653	141	35	15	eg
5	1	1	1	74	4	1118	2652	82	37	5	Fe
5	1	1	1	74	5	1246	2651	201	37	29	NS
5	1	1	1	74	6	1464	2659	49	29	26	eee
5	1	1	1	74	7	1641	2668	23	5	12	a
5	1	1	1	74	8	1732	2631	30	60	18	ss
5	1	1	1	74	9	1801	2659	17	28	0	Ie
5	1	1	1	74	10	1910	2639	13	26	0	,
5	1	1	1	74	11	1967	2655	106	32	34	eae
4	1	1	1	75	0	352	2669	1740	76	-1	
5	1	1	1	75	1	352	2684	247	42	40	aes
5	1	1	1	75	2	739	2676	471	61	0	tg
5	1	1	1	75	3	1239	2686	121	33	25	ee
5	1	1	1	75	4	1376	2687	163	31	24	ee,
5	1	1	1	75	5	1594	2669	223	76	28	gma
5	1	1	1	75	6	1834	2670	235	69	21	Stee
4	1	1	1	76	0	350	2709	1742	40	-1	
5	1	1	1	76	1	350	2728	102	21	8	Da
5	1	1	1	76	2	385	2712	16	47	8	[
5	1	1	1	76	3	400	2728	37	21	30	se
5	1	1	1	76	4	436	2712	44	47	29	[+
5	1	1	1	76	5	487	2712	16	47	60	|
5	1	1	1	76	6	496	2728	58	21	0	oe
5	1	1	1	76	7	537	2712	25	47	0	_[
5	1	1	1	76	8	571	2733	13	11	17	a
5	1	1	1	76	9	740	2711	80	32	20	Me
5	1	1	1	76	10	872	2729	7	10	26	nal
5	1	1	1	76	11	1054	2718	71	31	40	Se
5	1	1	1	76	12	1157	2715	50	31	31	GI
5	1	1	1	76	13	1243	2716	27	25	33	ag
5	1	1	1	76	14	1287	2717	154	31	24	oe
5	1	1	1	76	15	1464	2717	17	20	12	os
5	1	1	1	76	16	1598	2724	4	13	26	oe
5	1	1	1	76	17	1739	2723	14	9	54	Aer
5	1	1	1	76	18	1790	2730	15	16	32	pe
5	1	1	1	76	19	1835	2716	142	33	20	Sk
5	1	1	1	76	20	2041	2717	27	32	20	ee
4	1	1	1	77	0	350	2721	1686	61	-1	
5	1	1	1	77	1	350	2751	87	19	35	ee
5	1	1	1	77	2	441	2724	158	57	39	tee
5	1	1	1	77	3	748	2737	147	40	0	satel
5	1	1	1	77	4	1029	2721	136	61	38	pall
5	1	1	1	77	5	1189	2751	20	16	42	ES
5	1	1	1	77	6	1246	2741	105	33	0	ect
5	1	1	1	77	7	1365	2750	56	26	18	SRE
5	1	1	1	77	8	1430	2757	23	17	0	rs
5	1	1	1	77	9	1501	2746	39	20	3	eee
5	1	1	1	77	10	1545	2736	24	46	32	a
5	1	1	1	77	11	1759	2725	42	39	16	es
5	1	1	1	77	12	1862	2746	65	31	19	Le
5	1	1	1	77	13	1965	2738	105	36	45	Kae
4	1	1	1	78	0	329	2752	1762	68	-1	
5	1	1	1	78	1	329	2758	208	62	16	Peete
5	1	1	1	78	2	546	2758	32	62	21	ta
5	1	1	1	78	3	738	2774	24	23	27	U
5	1	1	1	78	4	777	2774	66	30	27	fees
5	1	1	1	78	5	846	2752	140	64	15	Pe
5	1	1	1	78	6	1002	2771	55	29	0	ieee
5	1	1	1	78	7	1205	2765	28	46	61	al
5	1	1	1	78	8	1254	2772	182	36	31	tee
5	1	1	1	78	9	1449	2773	116	32	15	ep
5	1	1	1	78	10	1579	2773	64	30	19	ae
5	1	1	1	78	11	1720	2788	18	16	31	ee
5	1	1	1	78	12	1848	2779	36	21	27	ete
5	1	1	1	78	13	1910	2784	28	14	0	CE
5	1	1	1	78	14	1969	2771	29	26	19	ae
5	1	1	1	78	15	2005	2774	86	36	23	ees
4	1	1	1	79	0	745	2793	1307	31	-1	
5	1	1	1	79	1	745	2808	14	10	34	any
5	1	1	1	79	2	801	2793	25	30	20	dace
5	1	1	1	79	3	893	2793	10	28	37	“4
5	1	1	1	79	4	1032	2811	2	2	73	?
5	1	1	1	79	5	1222	2806	11	9	38	in
5	1	1	1	79	6	1247	2804	36	13	8	gem
5	1	1	1	79	7	1362	2807	19	7	17	RIE.
5	1	1	1	79	8	1386	2795	16	32	19	el
5	1	1	1	79	9	1466	2809	22	13	19	ang
5	1	1	1	79	10	1510	2804	42	19	6	Speen
5	1	1	1	79	11	1669	2806	2	3	37	ity
5	1	1	1	79	12	1823	2796	13	28	17	ams
5	1	1	1	79	13	1943	2807	12	5	0	Sy
5	1	1	1	79	14	1999	2813	1	3	62	4
5	1	1	1	79	15	2048	2807	4	9	0	.
4	1	1	1	80	0	329	2799	1720	52	-1	
5	1	1	1	80	1	329	2799	71	49	46	[el
5	1	1	1	80	2	427	2799	79	49	17	[+]
5	1	1	1	80	3	509	2799	25	49	32	ae
5	1	1	1	80	4	542	2799	41	49	30	fs
5	1	1	1	80	5	582	2799	18	49	88	|
5	1	1	1	80	6	1187	2801	55	54	0	ed
5	1	1	1	80	7	1246	2819	108	29	20	MP
5	1	1	1	80	8	1345	2801	53	54	9	ee
5	1	1	1	80	9	1439	2822	187	25	9	ee
5	1	1	1	80	10	1643	2833	1	3	16	Es
5	1	1	1	80	11	1763	2810	29	28	32	ORS)
5	1	1	1	80	12	1882	2811	66	33	24	bie
5	1	1	1	80	13	1992	2803	100	43	3	tO
4	1	1	1	81	0	350	2824	1743	66	-1	
5	1	1	1	81	1	350	2824	79	47	10	spo
5	1	1	1	81	2	436	2824	48	47	30	fe
5	1	1	1	81	3	487	2824	16	47	30	|
5	1	1	1	81	4	502	2824	79	47	38	spe
5	1	1	1	81	5	584	2824	17	47	66	|
5	1	1	1	81	6	743	2842	56	24	13	Packs
5	1	1	1	81	7	823	2844	22	28	0	ol
5	1	1	1	81	8	965	2853	73	16	27	Nt
5	1	1	1	81	9	1050	2844	130	24	11	OE
5	1	1	1	81	10	1202	2843	26	25	13	ES
5	1	1	1	81	11	1402	2842	40	24	10	a
5	1	1	1	81	12	1463	2854	21	10	29	ee
5	1	1	1	81	13	1489	2827	38	50	22	aa
5	1	1	1	81	14	1563	2824	99	58	0	“he
5	1	1	1	81	15	1688	2848	4	17	32	id
5	1	1	1	81	16	1715	2843	104	28	35	“Cl.
5	1	1	1	81	17	1864	2859	2	2	54	ep
5	1	1	1	81	18	1902	2850	15	18	79	-
5	1	1	1	81	19	1949	2829	78	61	39	a)
5	1	1	1	81	20	2036	2839	57	29	21	ce
4	1	1	1	82	0	350	2851	1710	59	-1	
5	1	1	1	82	1	350	2863	84	41	41	ee
5	1	1	1	82	2	464	2862	135	43	39	tae
5	1	1	1	82	3	777	2870	94	25	9	a
5	1	1	1	82	4	859	2849	39	50	45	oe
5	1	1	1	82	5	901	2849	26	50	23	or
5	1	1	1	82	6	967	2866	69	29	26	Mines:
5	1	1	1	82	7	1053	2865	154	45	23	Stee
5	1	1	1	82	8	1243	2866	200	28	15	ee
5	1	1	1	82	9	1455	2883	49	8	30	ee
5	1	1	1	82	10	1521	2869	120	33	12	a
5	1	1	1	82	11	1665	2869	22	24	2	A
5	1	1	1	82	12	1704	2851	68	57	19	AS
5	1	1	1	82	13	1798	2868	25	25	8	ns
5	1	1	1	82	14	1887	2868	60	24	23	bg
4	1	1	1	83	0	751	2889	1342	28	-1	
5	1	1	1	83	1	751	2889	15	28	29	Pe
5	1	1	1	83	2	827	2899	46	10	34	ee
5	1	1	1	83	3	881	2889	19	28	43	ee
5	1	1	1	83	4	897	2895	48	16	30	ee
5	1	1	1	83	5	998	2891	73	22	47	ee
5	1	1	1	83	6	1104	2904	4	6	34	a
5	1	1	1	83	7	1127	2893	81	20	27	eee
5	1	1	1	83	8	1261	2892	2	8	0	,
5	1	1	1	83	9	1310	2892	57	21	0	Sigser
5	1	1	1	83	10	1402	2885	31	32	24	har
5	1	1	1	83	11	1433	2891	86	20	34	asc
5	1	1	1	83	12	1536	2896	24	13	37	hee
5	1	1	1	83	13	1594	2903	29	8	16	aw.
5	1	1	1	83	14	1664	2911	3	1	0	oh
5	1	1	1	83	15	1782	2901	12	10	0	.
5	1	1	1	83	16	1842	2897	4	3	30	i
5	1	1	1	83	17	2026	2894	4	12	43	\
5	1	1	1	83	18	2062	2895	31	8	41	Bw
4	1	1	1	84	0	350	2884	1742	90	-1	
5	1	1	1	84	1	350	2885	249	64	42	pe
5	1	1	1	84	2	822	2904	68	35	30	ee
5	1	1	1	84	3	963	2908	154	51	22	oS,
5	1	1	1	84	4	1361	2902	193	38	40	ke
5	1	1	1	84	5	1589	2895	229	65	33	er
5	1	1	1	84	6	1890	2884	202	90	26	eA
4	1	1	1	85	0	741	2937	1302	19	-1	
5	1	1	1	85	1	741	2942	4	3	14	Oe
5	1	1	1	85	2	813	2942	1	9	32	a
5	1	1	1	85	3	848	2940	55	12	20	gr
5	1	1	1	85	4	941	2940	21	7	17	OR
5	1	1	1	85	5	994	2947	63	8	11	ee
5	1	1	1	85	6	1071	2940	57	16	3	gag,
5	1	1	1	85	7	1135	2929	20	38	11	Ae
5	1	1	1	85	8	1355	2937	215	19	14	Rod
5	1	1	1	85	9	1633	2942	4	2	0	,
5	1	1	1	85	10	1770	2938	6	8	37	ma
5	1	1	1	85	11	1971	2943	11	10	52	‘wa
4	1	1	1	86	0	346	2956	1746	53	-1	
5	1	1	1	86	1	346	2956	92	48	36	Pes
5	1	1	1	86	2	454	2956	84	48	31	spo
5	1	1	1	86	3	538	2956	44	48	8	[2
5	1	1	1	86	4	586	2956	16	48	63	|
5	1	1	1	86	5	752	2977	102	32	23	ee
5	1	1	1	86	6	919	2956	15	57	38	eg
5	1	1	1	86	7	968	2983	33	16	25	ee
5	1	1	1	86	8	1085	2982	92	18	10	AeA
5	1	1	1	86	9	1371	2977	251	23	13	See
5	1	1	1	86	10	1663	2982	88	27	8	em.
5	1	1	1	86	11	1802	2971	47	27	26	Ok
5	1	1	1	86	12	1973	2982	26	9	21	as
5	1	1	1	86	13	2052	2979	40	12	17	eI
4	1	1	1	87	0	350	2984	1708	42	-1	
5	1	1	1	87	1	350	2984	77	42	0	[ps
5	1	1	1	87	2	482	2984	60	42	27	[ser
5	1	1	1	87	3	542	2984	57	42	54	[|
5	1	1	1	87	4	790	2998	55	24	40	Waid
5	1	1	1	87	5	882	2991	126	30	28	eg
5	1	1	1	87	6	1121	2998	187	26	32	PR.
5	1	1	1	87	7	1322	2987	16	45	45	.
5	1	1	1	87	8	1356	2993	129	27	34	aie
5	1	1	1	87	9	1574	3006	51	20	15	ee
5	1	1	1	87	10	1740	2995	6	7	21	eR
5	1	1	1	87	11	1798	2987	46	45	7	ON
4	1	1	1	88	0	350	2996	1697	64	-1	
5	1	1	1	88	1	350	3017	33	25	29	i
5	1	1	1	88	2	400	3017	199	26	25	ena
5	1	1	1	88	3	739	3020	131	37	22	aT
5	1	1	1	88	4	833	2992	63	74	10	ME
5	1	1	1	88	5	896	3013	150	43	0	Yb}
5	1	1	1	88	6	1066	3020	148	34	11	fiona
5	1	1	1	88	7	1308	3019	95	28	24	rah
5	1	1	1	88	8	1631	3018	62	31	37	has
5	1	1	1	88	9	1766	3028	51	20	18	ait
4	1	1	1	89	0	405	3044	1688	55	-1	
5	1	1	1	89	1	405	3048	137	51	0	Guv9auo9s
5	1	1	1	89	2	739	3067	38	19	52	a
5	1	1	1	89	3	834	3050	69	38	15	ats
5	1	1	1	89	4	917	3062	54	23	32	ye
5	1	1	1	89	5	989	3055	45	30	42	Te
5	1	1	1	89	6	1045	3047	39	36	13	ee
5	1	1	1	89	7	1116	3057	92	24	18	aie
5	1	1	1	89	8	1304	3076	28	9	37	inn
5	1	1	1	89	9	1409	3061	13	11	0	»
5	1	1	1	89	10	1450	3052	26	24	23	2
5	1	1	1	89	11	1476	3051	139	37	19	ean
5	1	1	1	89	12	1692	3060	84	36	42	xy
5	1	1	1	89	13	1912	3065	13	14	30	es
5	1	1	1	89	14	1942	3044	84	46	16	eo

                                                                                                                           5. |
                                   se Oh            ¥   ee                4      SS    Se               ee x ONS oe Se
                          € INAWHDVLLY

L202 HOUYVIN SL                                                       VONADSV ONILSSW SSLLINNOD TWYANSD

Section 64

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021




                                    Page 64 of 80

08 10 79 abed
         [ orem omni]     arenas                   SLNBNGOTa/aO ABN      a a                                                                    » Tpeen pees)   MSUPCOesNEy | Sereee
                         i                        APES Mp          ae ——— an Se                                                                   Se               een
                       SY                      P98SlidS NO € # Z LOT                                                    Ee             en eaunoN  wri          SUINLUWd        b
                                                                         a i                                                            SS                                   a   i
| Scr    [v0 aa            aouaey          Nid SHMOMALANE ANIA       ts |}                                to]                 MS ihe | Boe        gas-         Vuaisam
     -                                                                   PT                                                              rooms        some
                      4                                                                              4	1	1	1	9	0	501	386	1514	47	-1	
5	1	1	1	9	1	501	386	246	25	47	NOILONULSNOD
5	1	1	1	9	2	755	386	46	25	40	YO4
5	1	1	1	9	3	828	386	64	25	96	LON
5	1	1	1	9	4	1345	421	40	10	13	——
5	1	1	1	9	5	1731	404	173	29	17	CET
5	1	1	1	9	6	1930	400	85	32	30	wot
4	1	1	1	10	0	496	433	1626	42	-1	
5	1	1	1	10	1	496	433	391	42	0	AAYVNIWNIISdd
5	1	1	1	10	2	1625	446	75	23	84	NV1d
5	1	1	1	10	3	1709	446	207	23	18	SMNOMHLUVS
5	1	1	1	10	4	1925	446	197	23	12	AMVNIWITaud
4	1	1	1	11	0	535	521	2587	64	-1	
5	1	1	1	11	1	535	521	340	49	32	ee
5	1	1	1	11	2	1122	541	126	25	21	55)
5	1	1	1	11	3	1301	541	94	27	39	FHI
5	1	1	1	11	4	1447	540	189	41	32	(SORA
5	1	1	1	11	5	1784	541	8	13	5	_\
5	1	1	1	11	6	1861	539	174	42	42	SRN
5	1	1	1	11	7	2643	541	152	24	28	SONA
5	1	1	1	11	8	3030	541	92	15	37	ONY
4	1	1	1	12	0	504	541	2607	63	-1	
5	1	1	1	12	1	504	572	108	27	33	Caer
5	1	1	1	12	2	618	572	205	27	0	eeere
5	1	1	1	12	3	707	558	27	54	1	hs
5	1	1	1	12	4	738	572	55	27	31	ear
5	1	1	1	12	5	1074	560	134	44	10	<<
5	1	1	1	12	6	1231	567	14	20	0	zy
5	1	1	1	12	7	1300	562	21	14	0	*
5	1	1	1	12	8	1345	563	35	38	51	2
5	1	1	1	12	9	1387	541	44	55	0	a\)
5	1	1	1	12	10	1510	565	16	11	49	(2
5	1	1	1	12	11	1535	555	25	44	31	)
5	1	1	1	12	12	1791	556	15	36	93	\
5	1	1	1	12	13	2107	557	169	42	14	NSN
5	1	1	1	12	14	2372	581	26	17	0	.
5	1	1	1	12	15	2684	561	26	19	31	s_
5	1	1	1	12	16	2770	539	36	54	20	“sy
5	1	1	1	12	17	3050	556	61	39	9	N,
4	1	1	1	13	0	545	572	2648	72	-1	
5	1	1	1	13	1	541	594	29	31	0	HOD
5	1	1	1	13	2	569	594	40	31	0	WUINCO
5	1	1	1	13	3	615	594	22	31	51	FHL
5	1	1	1	13	4	639	602	186	12	0	MOLLSOMISACO
5	1	1	1	13	5	716	594	17	31	45	3
5	1	1	1	13	6	739	594	69	31	0	WOLTWIMED
5	1	1	1	13	7	807	594	24	31	42	Iv
5	1	1	1	13	8	848	602	27	12	23	OU
5	1	1	1	13	9	1042	611	3	3	34	.
5	1	1	1	13	10	1163	576	86	68	25	mA
5	1	1	1	13	11	1395	593	12	23	61	\|
5	1	1	1	13	12	1432	600	12	17	61	@
5	1	1	1	13	13	1531	583	13	46	16	Jf
5	1	1	1	13	14	1641	585	64	58	0	mN\
5	1	1	1	13	15	1743	578	51	38	0	e\
5	1	1	1	13	16	1806	593	19	40	62	\
5	1	1	1	13	17	1991	572	106	59	33	Ne
5	1	1	1	13	18	2109	598	19	5	86	~
5	1	1	1	13	19	2137	592	73	48	33	~\'
5	1	1	1	13	20	2281	579	82	44	31	aS
5	1	1	1	13	21	2710	578	78	53	54	\
5	1	1	1	13	22	2825	584	37	54	0	NN
5	1	1	1	13	23	3121	592	72	26	27	ae
4	1	1	1	14	0	526	602	2651	67	-1	
5	1	1	1	14	1	517	611	24	49	37	10
5	1	1	1	14	2	550	611	62	49	31	ARS
5	1	1	1	14	3	624	611	50	49	24	NN
5	1	1	1	14	4	698	625	128	25	33	BN
5	1	1	1	14	5	1119	602	50	49	34	me
5	1	1	1	14	6	1201	616	68	40	50	CN
5	1	1	1	14	7	1343	616	76	37	40	PULL
5	1	1	1	14	8	1496	622	132	33	55	MR,
5	1	1	1	14	9	1724	639	5	8	0	.
5	1	1	1	14	10	1996	626	42	24	44	oJ
5	1	1	1	14	11	2244	616	84	53	39	SS
5	1	1	1	14	12	2340	629	14	17	84	\
5	1	1	1	14	13	2970	623	138	37	15	NO
4	1	1	1	15	0	526	623	2551	67	-1	
5	1	1	1	15	1	526	651	51	33	20	Gro
5	1	1	1	15	2	590	651	25	33	26	FL
5	1	1	1	15	3	614	651	31	33	34	HUN
5	1	1	1	15	4	645	651	42	33	0	CCBNOW
5	1	1	1	15	5	689	651	11	33	0	5
5	1	1	1	15	6	711	662	17	11	25	wo
5	1	1	1	15	7	734	651	52	33	51	OS
5	1	1	1	15	8	785	651	12	33	51	A
5	1	1	1	15	9	1055	639	85	46	38	sl
5	1	1	1	15	10	1149	669	12	13	30	5
5	1	1	1	15	11	1163	649	52	41	31	one
5	1	1	1	15	12	1221	640	128	46	17	=S—

                                                          }   2, Mi) Ce                  Nf %e t>> Se s $                   é  ow               ae            =.      “SS
  Eine =                        SST        8 ee Se                                      19st TYAS NS                                         COT         ae
           ‘Cues: THA MLE OW      ty a                     eee           =X        us    4                            =    r      ——           —
  went SL ahs See Scat              —        e 2 S'* SSeS                         mat an /  Jane     i" -\t_          —  = i eo eae                                Se +
   NOD WUNED 3H SRO 9 VEREIGINCD OL aC ste _ —   ———E——————            >     >—               “           \ f ai          PS ecce77)    ET                    va i             S
          ERTL eee:            Lo                                                                                   Yee aE                                     sa
            . Ssvewas sawn tua    ) (ye        sen reny (SHE RBH ESI MAES CHITA OSH TRSNETETL leIeHLT. arg) kiprr es | ecestr ve M@eye eczpiref aerate lanes) arrests eth TP . eis pe Wp ounoenag, re q \
            ‘ATOTE SALINE      |                 mn                                                            An                   ap   LEE,                      A)    :*
     FHL GS Jey Sem UNS Od MOISES i,      pees                                                                   pus                 LLIOS       “          he      a    ¢   \
       ‘ioe ow 2oy Wk (aMDonW Sisco Tr ola YA ewe                                                                    ig wu)              ti                    é Y      4         )
                  UE 3H. rents  ms   \ i                                                                                  8 eu             gy)               CS
      ara ara     een    “ ZZ       ‘edi     ours A    pao tee wre rity mee W rere | | erynw omens x40 oof ew F194 ern ee           ary Yi)                     v) We ,
                                              a                                                                mt                   tt      SO                         4
    32 0134 UL GSS" TLE IN See g             en         arg        =   an      m1                              api   -     vy |               “iy Yi       A       i      4
  “Us0E TAVHOSLOGS FHL HU SOHMOUDIOY “WENGD ‘ 1     :                                                     =        ort         oui       244    7s Yu     \\       HS oy  5
    NLUe Re 36 SW BRUNGS® SecwaNG Ad) :      wan) Er    ari | eee  wu | ae    ey | eerie wa)  at    ik   poms   Fara       —               a     Ss               AD
   00    St een seemeee     us   e            yy  a     area | ee  eure | ony wou Seguin wre ty | edi fie gu | eee ary oR  =   my         é  aul   MG   EG         \  ‘      y
    MPO CERO FOL Ie NGO ANG a Ae  uw              —     :                            5       eee    _\_             ma    GN
5	1	1	1	32	17	2403	1119	25	10	0	arew
5	1	1	1	32	18	2718	1114	16	24	0	t
5	1	1	1	32	19	2807	1104	19	61	0	)
5	1	1	1	32	20	3008	1116	30	17	0	b
5	1	1	1	32	21	3161	1090	29	58	66	‘S
4	1	1	1	33	0	521	1104	2676	81	-1	
5	1	1	1	33	1	521	1149	43	11	42	ae
5	1	1	1	33	2	569	1111	46	78	0	Sa
5	1	1	1	33	3	854	1149	21	11	26	Se
5	1	1	1	33	4	888	1115	59	52	33	UR)
5	1	1	1	33	5	1043	1111	79	78	31	NE
5	1	1	1	33	6	1219	1135	203	11	19	Ee
5	1	1	1	33	7	1495	1137	29	11	39	Yee
5	1	1	1	33	8	1550	1137	40	11	22	Pe
5	1	1	1	33	9	1663	1137	32	12	39	ee
5	1	1	1	33	10	1718	1135	38	11	50	|e
5	1	1	1	33	11	1819	1135	36	10	40	FR
5	1	1	1	33	12	1886	1133	208	12	24	Pa
5	1	1	1	33	13	2164	1137	32	11	42	le
5	1	1	1	33	14	2298	1117	51	68	27	ca
5	1	1	1	33	15	2489	1139	39	11	33	=
5	1	1	1	33	16	2629	1142	38	11	33	NM?
5	1	1	1	33	17	2811	1104	24	65	13	)
4	1	1	1	34	0	616	1144	2581	53	-1	
5	1	1	1	34	1	616	1166	58	31	27	See
5	1	1	1	34	2	676	1172	14	12	13	D
5	1	1	1	34	3	691	1166	89	31	0	DIGIGNID
5	1	1	1	34	4	779	1166	25	31	0	F4
5	1	1	1	34	5	805	1166	16	31	68	Ol
5	1	1	1	34	6	919	1160	51	36	0	Wesh
5	1	1	1	34	7	980	1171	15	24	0	%
5	1	1	1	34	8	1157	1183	37	11	19	es
5	1	1	1	34	9	1233	1172	26	10	19	Tae
5	1	1	1	34	10	1325	1179	37	11	46	apy
5	1	1	1	34	11	1364	1167	17	31	84	|
5	1	1	1	34	12	1385	1179	40	11	7	we
5	1	1	1	34	13	1500	1181	27	11	20	mui
5	1	1	1	34	14	1529	1169	17	31	88	|
5	1	1	1	34	15	1561	1181	31	11	0	aeuiie
5	1	1	1	34	16	1654	1181	41	11	34	Syne
5	1	1	1	34	17	1701	1169	12	31	70	|
5	1	1	1	34	18	1733	1182	24	11	12	muy
5	1	1	1	34	19	1835	1183	23	10	44	zie
5	1	1	1	34	20	1867	1168	16	31	82	|
5	1	1	1	34	21	1909	1179	17	11	21	ary
5	1	1	1	34	22	2001	1179	23	11	42	rey
5	1	1	1	34	23	2035	1166	12	31	51	|
5	1	1	1	34	24	2054	1177	41	11	34	ete
5	1	1	1	34	25	2169	1181	26	11	24	eu
5	1	1	1	34	26	2198	1166	17	33	50	|
5	1	1	1	34	27	2233	1170	27	11	25	abit
5	1	1	1	34	28	2387	1174	2	2	40	bat
5	1	1	1	34	29	2526	1188	2	2	8	5
5	1	1	1	34	30	2807	1161	9	36	48	\/
5	1	1	1	34	31	2996	1169	7	8	0	\
5	1	1	1	34	32	3053	1144	26	50	29	Ny
5	1	1	1	34	33	3093	1168	15	12	69	~
5	1	1	1	34	34	3188	1174	9	12	61	A
4	1	1	1	35	0	612	1212	2566	35	-1	
5	1	1	1	35	1	612	1239	2	2	15	:
5	1	1	1	35	2	1165	1212	20	33	26	my)
5	1	1	1	35	3	1318	1224	27	12	43	we
5	1	1	1	35	4	1399	1229	18	7	45	=
5	1	1	1	35	5	1488	1227	37	11	7	ee
5	1	1	1	35	6	1652	1232	29	10	33	Draw
5	1	1	1	35	7	1718	1229	41	12	42	(Pee
5	1	1	1	35	8	1822	1224	37	12	25	ewuly
5	1	1	1	35	9	1862	1212	17	33	93	|
5	1	1	1	35	10	1886	1228	17	7	77	an
5	1	1	1	35	11	2001	1227	21	8	32	rire
5	1	1	1	35	12	2036	1211	12	34	47	|
5	1	1	1	35	13	2053	1225	39	11	0	aiaru
5	1	1	1	35	14	2171	1229	24	10	35	or
5	1	1	1	35	15	2225	1228	25	1	31	ulin
5	1	1	1	35	16	2489	1234	43	11	21	ye
5	1	1	1	35	17	2649	1240	16	7	0	~
5	1	1	1	35	18	2912	1234	16	11	19	ed
5	1	1	1	35	19	3117	1223	61	20	0	Kt
4	1	1	1	36	0	510	1221	2669	65	-1	
5	1	1	1	36	1	498	1234	73	43	0	\Boetky
5	1	1	1	36	2	574	1234	40	43	22	aL
5	1	1	1	36	3	642	1255	8	11	28	#
5	1	1	1	36	4	649	1234	37	43	44	IME
5	1	1	1	36	5	692	1234	65	43	28	TN
5	1	1	1	36	6	756	1234	48	43	30	eM
5	1	1	1	36	7	803	1234	21	43	43	TY
5	1	1	1	36	8	854	1253	21	13	34	6
5	1	1	1	36	9	986	1221	41	65	50	My
5	1	1	1	36	10	1057	1245	33	10	17	=”
5	1	1	1	36	11	1162	1270	16	6	67	—
5	1	1	1	36	12	1186	1263	74	11	0	fs
5	1	1	1	36	13	1319	1267	43	11	18	——}—\
5	1	1	1	36	14	1683	1232	6	11	0	;
5	1	1	1	36	15	1822	1269	105	6	19	pers
5	1	1	1	36	16	1996	1270	3	1	45	—
5	1	1	1	36	17	2235	1265	28	11	0	Kh—
5	1	1	1	36	18	2336	1250	28	11	10	oe)
5	1	1	1	36	19	2402	1252	28	11	10	ae
5	1	1	1	36	20	2639	1240	23	11	25	=
5	1	1	1	36	21	2902	1267	23	9	38	*
5	1	1	1	36	22	2942	1225	24	48	0	ta
5	1	1	1	36	23	3000	1243	5	20	91	|
5	1	1	1	36	24	3040	1224	58	49	0	.’)
5	1	1	1	36	25	3113	1223	66	57	65	r\s
4	1	1	1	37	0	548	1252	2653	57	-1	
5	1	1	1	37	1	548	1276	276	14	25	NSARM
5	1	1	1	37	2	643	1265	66	34	0	SeRENE
5	1	1	1	37	3	708	1265	52	34	40	TG
5	1	1	1	37	4	759	1265	32	34	18	SoA
5	1	1	1	37	5	855	1278	20	10	40	oa
5	1	1	1	37	6	993	1274	32	13	28	Ph
5	1	1	1	37	7	1026	1266	19	35	21	i
5	1	1	1	37	8	1163	1270	20	10	15	ih
5	1	1	1	37	9	1319	1272	34	7	52	‘ne
5	1	1	1	37	10	1358	1266	19	35	60	|
5	1	1	1	37	11	1385	1270	34	11	81	HR
5	1	1	1	37	12	1479	1268	18	34	17	mr
5	1	1	1	37	13	1486	1283	120	11	0	eeruewosrvet|
5	1	1	1	37	14	1615	1268	21	34	30	||
5	1	1	1	37	15	1654	1285	26	11	0	baxycw
5	1	1	1	37	16	1704	1283	69	11	0	eure
5	1	1	1	37	17	1827	1270	36	11	33	tS
5	1	1	1	37	18	1863	1266	19	37	86	|
5	1	1	1	37	19	1881	1266	35	37	50	Ma
5	1	1	1	37	20	2001	1269	23	11	47	ae
5	1	1	1	37	21	2032	1265	14	39	77	|
5	1	1	1	37	22	2067	1271	21	7	18	“Eee
5	1	1	1	37	23	2170	1272	20	10	0	Mt
5	1	1	1	37	24	2251	1270	5	7	43	5
5	1	1	1	37	25	2502	1276	26	11	0	ca
5	1	1	1	37	26	2544	1284	39	10	36	py
5	1	1	1	37	27	2820	1264	121	45	44	I
5	1	1	1	37	28	3109	1252	92	57	23	LY)
4	1	1	1	38	0	651	1305	2442	62	-1	
5	1	1	1	38	1	651	1314	176	44	0	SWHOMHLYWa
5	1	1	1	38	2	905	1319	79	43	26	SN
5	1	1	1	38	3	1043	1338	17	10	38	Fo
5	1	1	1	38	4	2322	1324	199	37	22	+I,“
5	1	1	1	38	5	2709	1342	41	12	50	EN
5	1	1	1	38	6	2889	1305	32	62	2	4
5	1	1	1	38	7	2981	1343	26	21	96	A
5	1	1	1	38	8	3089	1332	4	8	57	i
4	1	1	1	39	0	1003	1344	2186	60	-1	
5	1	1	1	39	1	1003	1363	12	41	0	(
5	1	1	1	39	2	1076	1384	2	4	0	_
5	1	1	1	39	3	1138	1370	30	10	46	HM)
5	1	1	1	39	4	1194	1371	28	11	0	ewestfe)
5	1	1	1	39	5	1225	1360	16	29	33	an
5	1	1	1	39	6	1240	1371	28	10	22	sui
5	1	1	1	39	7	1341	1358	31	29	8	alte
5	1	1	1	39	8	1377	1369	17	10	0	i
5	1	1	1	39	9	1404	1369	36	11	0	)eroy
5	1	1	1	39	10	1871	1371	21	10	42	Corie
5	1	1	1	39	11	1914	1371	27	11	0	ith
5	1	1	1	39	12	1992	1369	26	11	26	Patt
5	1	1	1	39	13	2007	1359	27	29	49	ye
5	1	1	1	39	14	2038	1371	13	10	27	a
5	1	1	1	39	15	2054	1359	29	29	11	eer
5	1	1	1	39	16	2157	1371	28	12	4	Pie
5	1	1	1	39	17	2197	1373	31	10	26	abet
5	1	1	1	39	18	2248	1372	29	11	11	m7
5	1	1	1	39	19	2326	1358	27	11	25	Sa)

                                                                                                                             Se Pe |             on         & Wa f So)      I)     p
             | yo 0 aw     y)  CA;    ya                                    Su                                                          E K cur                <4 CY        j
            ~~              KC      SAU AE MEU Nel RD A GH Me) ACE Te A ae ni rz SdH amo sve yr es al car eben alee) ere lsh Were er tira aces weer yeas |e rye ¥ A=! a dip ) Nee ay |
     Catemienreee           | y a                                                                                                 rN                  AY              hi     SR
         OMENS a oN Yee     =                                                                                                          —=       |         i           a >   oH;
     ware                    7                                                                         PAK                         ba ORM                                       aw
                                  I             _——                                                      Ge = aA                                                            ()
 wo WLVDDA Ow TaN TeaRON Seos wou Rg t oS Se ey  i                                  SoS,                Pon              “SN CI           2 Oy           ™                        el
 SRS                           AL                                                   Ff         Pee Phan                    YP AB          ORO              ORR                   OG
         1 oo ¥oI — Arm Jo Dre yy J    i  ko:      \      |           \             °    J           {oe         CO)           Ke ar    os “SY             to >         6           q
         Sacre              8p SO                     IC         6S                Se                   Ly Pes                       I        LF 9 OF Nee                    _-
     wmmrenamumn            WEL           \\          SR         RO OES                                          MS                      “SACS
           AMWNIITaYd              =F) - \_ \         a      ‘                SZ _ A                    ~     HA            Vora    moe          —      <       Se
                                 Ses)    ——       =a         NN             _*                           .        iS    SS                 ae          =        ~~      <9    .
                  swag           ~~    \         be      sat            —<—              } {;         '?       oo  YY —_                Se Te               : OX          ie,
                              —            \                      —      —                   -           ss Cy    i           ~          a                -              \
     Co             a                   N                       SLL                            OE    St          if.                         \       eee                       ~
   si Ee ont mat              —                                         RSTO           TN)                          Cl                            mS                        ce,
        OL LOTS Oy OD Ae                                                       —      .                       ~           ~   ~                                 ~
     1 SRS SL WI CGRIIOO NOLO Ff
                wollrmalswoo
       22 LEFGRGANO) G wed GEE
          OLS OW BES                                                                                                                                                a)
     Wy CALYOT] 38 OL Se SNES CMLSEG Tt
           rns aes                                                                                                                                                         ~~
                 Sa10N                    vy LNAWHOVLLV

                                                       L202 HOYVIN SL                                                     VONADSV ONILAAW AALLINNOD IWYANSD

Section 65

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021


                                                    Attachment 6




                                    Page 65 of 80

Attachment 6
                 SSS
     PLANS AND DOCUMENTS
     referred to in the REFERRAL     .
     AGENCY RESPONSE              =—
     SARA ref;   1908-13367SRA                 oS          Fr       ;     rl     |       SALI                         ,    z                          ae. |
     Date:       28 May 20200000        |              Ls TREATMENT.    a         )  tHEW RTM                                                          <a
                                        j          TJ    *                            1   ive   hws
           2S                ae          ok     ip 36m of          Y        | |  ;   Zim ENTRY TAPER 17m STORAGE hsm EXIT TAPER]
         a vi  p             BS                 oS               ’               |                  :                                         SESS
       bite Se,            Lf gps                   MR             SJ”      ;     As EA 3 en      Se i bus ror)  .      Se        Pre        cae
          ae a et                 |                    a                   NOOO                                           .     1 ha RS                   i
            er           Tae    sie G  fee         Eg     5 pees        ES             Ne oe           See ee                  ate    HE     i
       ——— ———————S ey ca ee cisao. | (hsenciadaheahesnsiieiieaaane Deane                                            a            ee ae               7
      |       PS PR EER          ete         NNT   AT LAT RT  ee TE , {FCP NET           7                        uy    =     :      CS     SEE TE TEI LEB IOE,
          os             AEG, CLLG                                    aS                                    a a                         ULL yyyy
       ee     my   ~~        -    Pe PPMMMLLLELIS SIS EL ESD               ee,   eed) al    -   ,              SE TE      ~       me    ~~      8
       (om                   eel gate          i              eee    aca   §            Se       ?         :   Ne an eed     SS       a          er    ees
          SS            Se       ee                      RESET aa                           e    S                  e               eee   oe gale ecm &
       SRE          OO aa:        F     i:         peu 15 lag eS                 Tait ak! Realred, eek etc) hk. pee eM                    ae oa ee oy
        eae              aod                        Se tc                     Pais    GLCHR TREATMENT   cre ed aS               .     Re         RR   «Ry
           eral       3      pra  ee            yo      ee!          aes.      ee           =              ies                    DS       RR i ae die. 9h
  i       pe               ae                   Ny Yee     ake        Be             ie                  i      ea                ely.   Cease
  3)     Be oe       oa                 A ee                           a ae                 er         oe                 + ee                 ae
  :    :    ae Bt    Nak Bet ag         eb                se        a  ib         Ki       2"        ree          F    toe A         ae     et            A
  §|                                                                      DETAIL A
  3                                                    FUNCTIONAL LAYOUT - LEFT & RIGHT TURN TREATMENT
  :                     ‘ro.                                        oe a                              ie    ee             ee
                                                     =                ET              ae eo           :           ee    i           nt, VS,
                    -           tee            as       . 3         an   ae            =     ;       Pe      wh ea    a    S|        a      ~
             ee       yen      eg                  oe   a,    yy    a i    5	1	1	1	31	10	1949	1442	16	17	22	a
5	1	1	1	31	11	1983	1438	15	30	32	ae
5	1	1	1	31	12	2222	1447	10	12	0	g
5	1	1	1	31	13	2289	1450	13	8	34	ie
5	1	1	1	31	14	2438	1443	10	15	58	is
5	1	1	1	31	15	2687	1455	3	5	0	,
5	1	1	1	31	16	2734	1458	5	2	19	*
5	1	1	1	31	17	2783	1442	41	7	33	rae
5	1	1	1	31	18	2874	1443	5	3	89	4
5	1	1	1	31	19	2956	1452	10	12	8	Ca
4	1	1	1	32	0	532	1444	2379	81	-1	
5	1	1	1	32	1	532	1481	12	25	67	?
5	1	1	1	32	2	786	1473	36	28	36	ret
5	1	1	1	32	3	875	1485	37	23	0	ps
5	1	1	1	32	4	936	1472	3	9	26	‘
5	1	1	1	32	5	966	1481	75	44	10	Say
5	1	1	1	32	6	1210	1481	18	7	26	se
5	1	1	1	32	7	1308	1488	16	19	47	7
5	1	1	1	32	8	1388	1498	1	9	72	P
5	1	1	1	32	9	1786	1502	6	3	0	.
5	1	1	1	32	10	1901	1483	76	11	30	ari
5	1	1	1	32	11	2017	1486	20	26	22	A
5	1	1	1	32	12	2066	1460	38	50	0	\
5	1	1	1	32	13	2222	1465	86	38	30	jes
5	1	1	1	32	14	2345	1444	60	67	40	Se,
5	1	1	1	32	15	2497	1486	9	15	0	$
5	1	1	1	32	16	2785	1485	1	3	6	\
5	1	1	1	32	17	2850	1487	5	1	57	|
5	1	1	1	32	18	2854	1486	57	18	31	ai
4	1	1	1	33	0	532	1494	2433	44	-1	
5	1	1	1	33	1	532	1510	13	23	73	5
5	1	1	1	33	2	756	1512	28	13	16	Pe
5	1	1	1	33	3	855	1508	52	15	34	ey
5	1	1	1	33	4	990	1495	23	43	14	ae
5	1	1	1	33	5	1634	1511	9	17	26	vt
5	1	1	1	33	6	2044	1507	54	5	23	aa
5	1	1	1	33	7	2222	1526	4	4	28	4
5	1	1	1	33	8	2382	1494	89	43	94	DETAIL
5	1	1	1	33	9	2478	1506	18	20	94	A
5	1	1	1	33	10	2795	1506	114	20	83	DETAILB
5	1	1	1	33	11	2950	1508	3	2	0	B
4	1	1	1	34	0	532	1522	2457	38	-1	
5	1	1	1	34	1	532	1537	11	17	42	3
5	1	1	1	34	2	675	1530	46	35	40	LS!
5	1	1	1	34	3	748	1530	18	35	21	ee
5	1	1	1	34	4	805	1534	122	16	26	hee
5	1	1	1	34	5	1217	1544	6	1	71	=
5	1	1	1	34	6	1308	1536	56	22	47	=e
5	1	1	1	34	7	1460	1531	47	11	38	aa
5	1	1	1	34	8	1808	1542	3	1	52	=
5	1	1	1	34	9	2054	1546	3	1	45	el
5	1	1	1	34	10	2063	1537	23	30	39	ic
5	1	1	1	34	11	2206	1526	5	10	38	4
5	1	1	1	34	12	2290	1531	5	6	0	r
5	1	1	1	34	13	2425	1533	2	3	0	:
5	1	1	1	34	14	2501	1531	87	29	34	Hee
5	1	1	1	34	15	2636	1522	27	16	50	*
5	1	1	1	34	16	2983	1535	6	7	39	r
4	1	1	1	35	0	532	1544	2440	82	-1	
5	1	1	1	35	1	532	1556	15	70	62	:
5	1	1	1	35	2	669	1574	12	9	0	~
5	1	1	1	35	3	761	1556	40	35	53	ms
5	1	1	1	35	4	918	1572	168	23	0	diate
5	1	1	1	35	5	1176	1564	10	35	20	rt
5	1	1	1	35	6	1182	1589	35	4	32	Se
5	1	1	1	35	7	2208	1577	7	18	69	|
5	1	1	1	35	8	2247	1568	57	27	40	ae
5	1	1	1	35	9	2390	1586	28	3	0	a.
5	1	1	1	35	10	2470	1544	13	34	2	i
5	1	1	1	35	11	2508	1560	67	31	10	Re
5	1	1	1	35	12	2660	1582	3	3	0	:
5	1	1	1	35	13	2722	1572	15	27	0	«
5	1	1	1	35	14	2833	1570	23	14	8	ce
5	1	1	1	35	15	2970	1569	2	9	9	’
4	1	1	1	36	0	685	1592	2307	34	-1	
5	1	1	1	36	1	607	1600	104	18	4	—.
5	1	1	1	36	2	761	1600	40	20	31	<3]
5	1	1	1	36	3	871	1592	558	29	15	““LL’WW@WZW|@_
5	1	1	1	36	4	1439	1592	221	25	23	Hi
5	1	1	1	36	5	2284	1594	283	26	0	ee
4	1	1	1	37	0	532	1612	2367	32	-1	
5	1	1	1	37	1	532	1628	13	11	18	Bl
5	1	1	1	37	2	615	1617	186	25	24	ee
5	1	1	1	37	3	1228	1614	268	27	37	ane
5	1	1	1	37	4	1576	1618	42	8	49	SS
5	1	1	1	37	5	1821	1618	329	26	0	Eee
4	1	1	1	38	0	531	1637	2434	50	-1	
5	1	1	1	38	1	531	1643	14	31	33	5
5	1	1	1	38	2	626	1643	20	31	12	De
5	1	1	1	38	3	683	1663	3	2	4	a
5	1	1	1	38	4	752	1641	37	35	21	ST
5	1	1	1	38	5	912	1655	8	14	16	ni
5	1	1	1	38	6	981	1653	55	8	26	a
5	1	1	1	38	7	1132	1644	3	2	25	a
5	1	1	1	38	8	1200	1659	111	28	0	eee
5	1	1	1	38	9	1421	1641	130	34	0	esse
5	1	1	1	38	10	1539	1637	24	46	0	®
5	1	1	1	38	11	1615	1654	10	20	0	e
5	1	1	1	38	12	1627	1644	94	35	0	yeme
5	1	1	1	38	13	1739	1637	23	46	57	of
5	1	1	1	38	14	1808	1645	1	9	32	i
5	1	1	1	38	15	1842	1641	8	36	33	ae
5	1	1	1	38	16	2031	1643	120	32	10	chee]
5	1	1	1	38	17	2212	1639	20	44	0	rn
5	1	1	1	38	18	2376	1642	166	20	24	FR
5	1	1	1	38	19	2563	1637	25	47	8	Aa
5	1	1	1	38	20	2654	1637	55	47	0	aro
5	1	1	1	38	21	2868	1661	1	2	16	A
5	1	1	1	38	22	2949	1644	16	28	26	Bik
4	1	1	1	39	0	532	1660	2442	44	-1	
5	1	1	1	39	1	532	1678	12	14	83	2
5	1	1	1	39	2	621	1675	63	21	23	=>
5	1	1	1	39	3	845	1679	34	14	60	=
5	1	1	1	39	4	946	1674	98	26	30	ee
5	1	1	1	39	5	1065	1687	3	2	0	:
5	1	1	1	39	6	1109	1677	202	23	12	Se
5	1	1	1	39	7	1377	1674	19	3	0	—
5	1	1	1	39	8	1427	1667	10	37	4	oe
5	1	1	1	39	9	1449	1667	40	37	34	ae.
5	1	1	1	39	10	1501	1677	4	4	21	~
5	1	1	1	39	11	1613	1697	3	5	24	:
5	1	1	1	39	12	1637	1675	32	17	32	et
5	1	1	1	39	13	1687	1672	27	26	61	an
5	1	1	1	39	14	1859	1687	18	11	21	es
5	1	1	1	39	15	1922	1674	9	15	31	di”
5	1	1	1	39	16	1965	1681	2	3	24	SEE
5	1	1	1	39	17	2104	1694	2	2	0	,
5	1	1	1	39	18	2235	1691	21	3	32	Kz
5	1	1	1	39	19	2351	1696	3	2	0	,
5	1	1	1	39	20	2438	1674	34	13	22	2s
5	1	1	1	39	21	2615	1679	3	2	2	’
5	1	1	1	39	22	2720	1671	40	24	29	ee
5	1	1	1	39	23	2868	1660	12	45	4	er
5	1	1	1	39	24	2897	1660	25	36	42	Pe
5	1	1	1	39	25	2954	1674	20	26	35	i
4	1	1	1	40	0	533	1673	2458	56	-1	
5	1	1	1	40	1	533	1693	11	32	61	5
5	1	1	1	40	2	635	1685	47	38	0	Te
5	1	1	1	40	3	893	1682	64	41	34	ae
5	1	1	1	40	4	979	1698	59	27	31	pS
5	1	1	1	40	5	1059	1691	68	35	11	Feige
5	1	1	1	40	6	1143	1679	83	45	32	Ce
5	1	1	1	40	7	1409	1700	86	26	1	Lee
5	1	1	1	40	8	1638	1675	37	54	22	3
5	1	1	1	40	9	1691	1713	2	2	40	;
5	1	1	1	40	10	1809	1701	36	25	9	ry
5	1	1	1	40	11	1849	1688	34	12	30	a
5	1	1	1	40	12	1924	1673	37	47	29	a
5	1	1	1	40	13	2058	1686	21	41	26	se
5	1	1	1	40	14	2122	1699	19	15	32	Me
5	1	1	1	40	15	2214	1716	3	4	19	me
5	1	1	1	40	16	2578	1694	71	30	2	at
5	1	1	1	40	17	2718	1701	92	21	19	as
5	1	1	1	40	18	2824	1700	67	27	26	ck
5	1	1	1	40	19	2908	1705	7	8	14	Mh
4	1	1	1	41	0	532	1706	2438	42	-1	
5	1	1	1	41	1	532	1726	13	16	0	'
5	1	1	1	41	2	624	1712	51	24	28	ey
5	1	1	1	41	3	905	1722	24	9	27	oy:
5	1	1	1	41	4	938	1725	53	4	33	as
5	1	1	1	41	5	1043	1729	37	9	25	PO
5	1	1	1	41	6	1143	1721	45	16	0	-)
5	1	1	1	41	7	1413	1729	2	2	0	;
5	1	1	1	41	8	1484	1708	27	35	24	en
5	1	1	1	41	9	1618	1720	47	15	44	yey
5	1	1	1	41	10	1794	1708	22	35	4	rs
5	1	1	1	41	11	1933	1725	39	6	17	ya
5	1	1	1	41	12	2081	1720	14	19	11	Pe
5	1	1	1	41	13	2366	1719	4	10	16	|
5	1	1	1	41	14	2573	1734	4	4	0	Se
5	1	1	1	41	15	2637	1718	103	30	28	etn
5	1	1	1	41	16	2702	1713	30	39	30	es
5	1	1	1	41	17	2756	1717	33	23	23	ee
5	1	1	1	41	18	2827	1727	3	1	28	a
5	1	1	1	41	19	2954	1711	8	35	13	Fs
4	1	1	1	42	0	534	1729	2362	53	-1	
5	1	1	1	42	1	534	1744	13	16	44	2}
5	1	1	1	42	2	606	1733	63	29	30	ae
5	1	1	1	42	3	791	1735	4	4	5	ee
5	1	1	1	42	4	879	1736	2	3	16	ak
5	1	1	1	42	5	930	1723	37	43	43	22.5
5	1	1	1	42	6	976	1723	55	43	37	TAPER
5	1	1	1	42	7	1045	1723	29	43	8	Mae
5	1	1	1	42	8	1418	1760	4	2	34	feed
5	1	1	1	42	9	1457	1742	47	20	20	Ck
5	1	1	1	42	10	1532	1731	44	22	18	ron
5	1	1	1	42	11	1568	1723	51	43	18	ie
5	1	1	1	42	12	1629	1723	39	43	25	Gee
5	1	1	1	42	13	1769	1746	74	16	20	i
5	1	1	1	42	14	1868	1733	136	32	8	Roe
5	1	1	1	42	15	2045	1740	15	19	27	A
5	1	1	1	42	16	2068	1734	249	23	18	ee
5	1	1	1	42	17	2589	1733	69	33	11	rE
5	1	1	1	42	18	2666	1730	62	33	0	A
5	1	1	1	42	19	2731	1731	109	51	0	 .
5	1	1	1	42	20	2942	1738	45	21	38	ee
4	1	1	1	43	0	532	1745	2453	47	-1	
5	1	1	1	43	1	532	1761	15	29	51	3
5	1	1	1	43	2	614	1762	45	20	23	2a
5	1	1	1	43	3	829	1769	26	17	5	oe
5	1	1	1	43	4	920	1760	28	25	31	be
5	1	1	1	43	5	978	1760	49	25	19	ORC
5	1	1	1	43	6	1082	1760	49	25	32	re)
5	1	1	1	43	7	1150	1762	3	2	13	Ra
5	1	1	1	43	8	1318	1756	27	39	63	[sz
5	1	1	1	43	9	1348	1756	20	39	42	em
5	1	1	1	43	10	1326	1763	172	22	0	DECELERATION
5	1	1	1	43	11	1517	1756	20	39	0	MY
5	1	1	1	43	12	1532	1760	36	25	18	git
5	1	1	1	43	13	1591	1760	57	27	3	Sis
5	1	1	1	43	14	1673	1760	36	27	0	a-
5	1	1	1	43	15	1756	1766	20	18	8	Sn
5	1	1	1	43	16	1857	1777	9	8	9	|
5	1	1	1	43	17	1865	1761	88	25	13	cee
5	1	1	1	43	18	1962	1763	48	16	23	Si
5	1	1	1	43	19	2097	1768	2	2	35	in
5	1	1	1	43	20	2209	1768	20	13	13	Ca
5	1	1	1	43	21	2248	1773	29	17	33	vite
5	1	1	1	43	22	2310	1762	4	22	30	ie
5	1	1	1	43	23	2334	1759	26	28	4	9
5	1	1	1	43	24	2357	1755	34	39	32	ays
5	1	1	1	43	25	2529	1745	22	42	52	¥
5	1	1	1	43	26	2587	1759	67	30	13	abi
5	1	1	1	43	27	2685	1764	63	28	15	sar
5	1	1	1	43	28	2729	1755	22	41	16	4,
5	1	1	1	43	29	2779	1759	40	27	13	bes
5	1	1	1	43	30	2880	1776	32	11	4	a
4	1	1	1	44	0	533	1779	2455	46	-1	
5	1	1	1	44	1	533	1792	11	20	84	8
5	1	1	1	44	2	644	1782	20	43	13	bE
5	1	1	1	44	3	816	1785	67	10	52	a
5	1	1	1	44	4	1023	1796	1	3	41	tee
5	1	1	1	44	5	1062	1791	137	22	21	are
5	1	1	1	44	6	1346	1800	15	10	0

                                                            Pa    TS oe             Pits         RS        SERS RR          aU       eed Sus        GS    te
  i                                              DETAIL B                                                                     LOCALITY PLAN
  #                              FUNCTIONAL LAYOUT - NORTHBOUND APPROACH                                                      WOT TOS   PRELIMINARY]
  5                                                                                                                                      ADVICE ONLY       |
  o                                                                                                                                      rROELINIINANT
  3
  g                                                                                                                                      ed
                                                                                                AROATARENONEPARC ANOS cuecinouse [iT                 [A
  E       SS                              “                                                       5	1	1	1	51	5	2800	2001	4	3	91	=
5	1	1	1	51	6	2933	2002	2	2	32	°
4	1	1	1	52	0	532	1998	2475	53	-1	
5	1	1	1	52	1	532	1999	619	36	53	SSS
5	1	1	1	52	2	1178	2009	332	42	17	ae
5	1	1	1	52	3	1700	1974	50	91	22	Tw
5	1	1	1	52	4	1756	2017	151	18	41	CONSULTING
5	1	1	1	52	5	1916	2017	39	18	60	rv
5	1	1	1	52	6	1966	2017	42	18	21	TD
5	1	1	1	52	7	2014	1974	69	91	0	[
  7EK_L#I_(                                                                amenomen             —                                             =          _
  =e — tm Bee -                                                                                                                               —
  E i+]                         ode ee ®                                   ac                      FUNCTIONAL LAYOUT - LEFT & RIGHT TURN TREATMENT       eo
  ese                                                                      {PEs
Document Set ID: 21137907
‘Version: 1, Version Date: 29/05/2020

                                                                                        Page 65 of 80

Section 66

GENERAL COMMITTEE MEETING AGENDA                                               15 MARCH 2021


   10   FINANCIAL PERFORMANCE REPORT - FEBRUARY 2021

   Author             Manager Financial Services, Trent Grauf
                      Corporate Services Department

   Index              ECM/ Subject/ 22.09 – Monthly Financial Performance Report

   Attachments        1.   Statement of Income and Expenditure (Profit & Loss and
                           Capital)
                      2.   Statement of Financial Position
                      3.   Statement of Cash Flows
                      4.   Summary of Materials and Services Expenditure



   EXECUTIVE SUMMARY
   Year to date (YTD) operating performance against current budget as at 28 February 2021 is
   positive, with operating revenues performing above forecast due largely to Council facilities
   and business activity sales outperforming COVID-19 budget assumptions. The budget
   review 3 (BR3) process, which addresses any realised budget variations or emergent
   requests, is currently underway and will be presented to the April round of Council meetings.

    YTD Financial Performance Summary
                             Budget        Actual     Variance      Variance       Status
                                $m            $m           $m             %
    Operating Revenue          $85.8        $90.6          $4.8         5.6%      On Track
    Operating Expense          $63.0        $62.8          $0.2         0.3%      On Track
    Operating Position         $22.8        $27.8          $5.0        21.7%
    Capital Revenue             $4.9         $7.1          $2.2        45.1%   Above Budget
    Capital Expenditure        $14.9        $15.2         -$0.4        -2.6%      On Track

   Financial statements including Statement of Income & Expenditure, Statement of Financial
   Position (balance sheet), and Statement of Cash Flows are included as attachments for
   information for Council.




                                                                                 Page 66 of 80

Section 67

GENERAL COMMITTEE MEETING AGENDA                                                         15 MARCH 2021


   Figure 1: Actual Performance Compared to Budget

     $100
                                                 YTD Budget ($m)
                          $85.8       $90.6
      $90
                                                 YTD Actual ($m)
      $80
      $70
                                                                      $63.0      $62.8
      $60
      $50
      $40
      $30
      $20
      $10
        $-
                        Operating Revenue                          Operating Expenditure

   Council’s performance against key measures of financial sustainability have been calculated
   as at February 2021. These indicators enable the reader to assess Council’s success in
   managing its budget, cash and debt as well as undertaking sustainable asset management.
   The table below contains a snapshot of a number of key measures, with full detail included
   in the report.

    YTD Measures of Financial Sustainability
                                       Target      Current         Actual YTD
                                                   Budget
    Operating Surplus Ratio            0-10%        -3.0%             30.7%          On Track
    Net Financial Liabilities Ratio    <60%         -8.5%             -48.4%         On Track
    Cash Cover Ratio                  3 months    7.9 months       12.5 months     Above Target
    Asset Sustainability Ratio         > 90%       100.1%             59.9%          On Track


   RECOMMENDATION
   That Council note the report by the Manager Financial Services to the General Committee
   Meeting dated 15 March 2021 outlining February 2021 year to date financial performance
   against budget, including performance against key financial sustainability indicators.



   REPORT
   Operating Revenue (YTD Benchmark 66.67%)
   Council has received 93% ($90.6 million) of its operating revenue budget ($96.9 million).
   Commentary on each revenue category is provided below.

    Category              Summary                         Comments
    Rates and Levies      $69.3 million (101%) of the     •    Waste utility charges $836k above YTD
                          annual budget of $68.4               budget (107% or $13.2 million of $12.4
                          million has been earned              million budget earned), due to recovery of
                                                               collection services previously impacted
                                                               by the COVID-19 pandemic (partially
                                                               offset by additional contractor operating
                                                               costs)


                                                                                           Page 67 of 80

Section 68

GENERAL COMMITTEE MEETING AGENDA                                                    15 MARCH 2021


    Category        Summary                          Comments
    Fees and        $5.1 million (78%) of the $6.6   •     Development assessment fees $196k
    Charges         million annual budget has              above YTD budget (78% or $1.2 million of
                    been earned                            $1.6 million budget earned) – offset by
                                                           additional    consultancy    and   other
                                                           application processing costs
                                                     •     Building application fees $135k above
                                                           YTD budget (84% or $558k of $667k
                                                           budget earned)
                                                     •     Plumbing application fees $94k above
                                                           YTD budget (76% or $761k of $1.0 million
                                                           budget earned)
    Sale of Goods   $7.4 million (102%) of the       •     Holiday Park sales $1.5 million above
    and Services    $7.3 million budget has been           YTD budget (160% or $2.6 million of $1.6
                    received                               million budget earned) – Parks reopened
                                                           earlier than forecast following COVID-19
                                                           pandemic closures. Positive revenue
                                                           variances that hold through the financial
                                                           year will be offset in part by additional
                                                           variable operating costs
                                                     •     Community Facilities (NAC, NLC and The
                                                           J) $871k above YTD budget (110% or
                                                           $1.6 million of $1.45 million budget
                                                           earned) – Facilities reopened earlier than
                                                           forecast following COVID-19 pandemic
                                                           closures. Positive revenue variances that
                                                           hold through the financial year will be
                                                           offset in part by additional variable
                                                           operating costs
                                                     •     Waste management disposal fees and
                                                           sale of recoverable materials $401k
                                                           above YTD budget (76% or $3.0 million of
                                                           $4.0 million budget earned)
    Interest        $481k (55%) of the $870k         •     Interest revenues on cash invested will
    Received        annual budget has been                 need ongoing monitoring given further
                    earned                                 recent interest rate cuts and impacts on
                                                           term deposit / cash fund rates
    Unitywater      On track                         Nil
    Dividend and
    Tax
    Other Revenue   $1.6 million (82%) of the $2.0   •     Recoupment of Unitywater charges from
                    million budget has been                lessees $97k above YTD budget - offset
                    earned                                 by additional utility charge expenses
                                                     •     Commercial lease revenue $134k above
                                                           YTD budget (84% or $772k of $919k
                                                           budget earned)
    Operating       $3.6 million (59%) of the $6.1   •     50% ($1.2 million) of the financial
    Grants,         million budget has been                assistance grant was prepaid in May
    Subsidies       received                               2020 and may impact on Council’s
                                                           2020/21 final operating position if the
                                                           prepayment approach is discontinued by
                                                           the Australian government
                                                     •     All operating grants are in line with budget
                                                           expectations at this stage
    Unitywater      On track                         •     Unitywater distributions are fixed each
    Distributions                                          year so there is little budget variance risk


                                                                                      Page 68 of 80

Section 69

GENERAL COMMITTEE MEETING AGENDA                                                                        15 MARCH 2021



   Figure 2: Operating Revenue Position by Type (Excluding Rates)

     $8.0                                              $7.5

     $7.0
                                                                                   YTD Budget ($m)
     $6.0          $5.1                                                            YTD Actual ($m)
            $4.5                                $4.6
     $5.0
     $4.0                                                                                   $3.5 $3.6
                                                                                                        $2.9 $2.9
     $3.0
     $2.0
                                                                     $1.0
                                         $0.5                 $0.8
     $1.0                   $0.5                                             $0.6 $0.7

     $0.0



                                                               Income




                                                                                 Other
               Charges




                                                                                              Grants




                                                                                                          Unitywater
                                                 Goods &
                                                 Services
                                                 Sales of




                                                                Rental
                              Interest
               Fees &




                                                                                                           Share of
   Operating Expenditure (YTD Benchmark 66.67%)
   Actual operating expenditure is currently 63% ($62.8 million) of full year budget ($99.9
   million). Detailed commentary for each expenditure category is provided below.

    Category              Summary                                        Comments
    Employee              $22.0 million (63%) of the                     •   Under expenditure for permanent staff
    Costs                 annual budget of $34.8                             salaries and wages ($2.2 million) partially
                          million has been expended                          offset by additional spend on casual staff
                                                                             and external labour hire ($858k) as well as
                                                                             overtime and allowances ($163k)
    Materials and         $27.0 million (61%) of the                     •   Council buildings and facilities $94k below
    Services              $44.5 million annual budget                        YTD budget (45% or $468k of $1.0 million
                          has been expended                                  budget spent) – timing of utilities as well as
                                                                             scheduled maintenance and cleaning
                                                                             services
                                                                         •   Libraries services $91k below YTD budget
                                                                             (46% or $503k of $1.1 million budget spent)
                                                                             – timing of library collection purchases and
                                                                             programs
                                                                         •   Waste Management costs $74k below YTD
                                                                             budget (65% or $6.3 million of $9.8 million
                                                                             budget spent) – collection bin purchases
                                                                             lower than forecast (offset by lower revenue
                                                                             recovery)
                                                                         •   Development application costs (including
                                                                             legal appeals) $61k above YTD budget
                                                                             (96% or $201k of $210k budget spent) –
                                                                             offset by additional application revenues
                                                                         •   Noosa Aquatic Centre $75k above YTD
                                                                             budget (80% or $513k of $643k budget
                                                                             spent) – variable operating costs from
                                                                             facility reopening earlier than budgeted
                                                                             following COVID-19 pandemic related
                                                                             closures - offset by additional revenues
                                                                         •   Schoolies-related costs $80k unbudgeted –
                                                                             to be addressed at Budget Review 3


                                                                                                            Page 69 of 80

Section 70

GENERAL COMMITTEE MEETING AGENDA                                                                       15 MARCH 2021


    Category                   Summary                                     Comments
                                                                           • Governance legal fees $247k unbudgeted –
                                                                              to be addressed at Budget Review 3
                                                                           • Holiday parks $414k above YTD budget
                                                                              (114% or $983k of $861k budget spent) –
                                                                              variable    operating  costs   (including
                                                                              commission) from parks reopening earlier
                                                                              than    budgeted following COVID-19
                                                                              pandemic related closures - offset by
                                                                              additional revenues
    Finance Costs              On track                                    Nil
    Depreciation               On track                                    Nil
    Other                      On track                                    Nil
    Expenses

   Figure 3: Operating Expenditure Position by Type

    $30.0
                                          $26.6 $27.0

    $25.0                                                                    YTD Budget ($m)
               $22.6 $22.0
                                                                             YTD Actual ($m)
    $20.0

    $15.0                                                                            $12.6 $12.7

    $10.0

     $5.0
                                                         $1.0 $1.0
                                                                                                       $0.1 $0.2
     $0.0
                                                           Finance Costs
                                             Materials




                                                                                        Depreciation
                   Employees




                                                                                                         Other




   Capital Revenue
   YTD capital revenue of $7.1 million received comprises cash contributions from developers
   ($1.4 million) and capital grants ($5.7 million). Note that the timing of capital grant receipts
   are generally dependent on the timing of grant conditions and also capital delivery
   performance, and that the timing of the receipt of developer contributions (both cash and
   contributed) is unpredictable.




                                                                                                          Page 70 of 80

Section 71

GENERAL COMMITTEE MEETING AGENDA                                                          15 MARCH 2021


   Figure 4: Capital Revenue by Type

     $6.0
                                                            $5.3

     $5.0
                                                                   YTD Budget ($m)
                                                                   YTD Actual ($m)
     $4.0
                                             $3.1
     $3.0

     $2.0
                  $1.2                $1.2
     $1.0
                                                                        $0.0             $0.0
     $0.0
                      Contributions




                                                Subsidies




                                                                           Contributed
                                                 Grants /




                                                                             Assets
                         Cash




   Capital Program
   Actual capital expenditure (excluding commitments) is $15.2 million (YTD budget $14.9
   million). Detailed discussion of progress in the delivery of the capital works program is
   provided through a separate report by the Asset Planning Manager.

   Figure 5: Capital Program Delivery Performance

    $12.0                         $11.4
                 $10.9

    $10.0                                       YTD Budget ($m)
                                                YTD Actual ($m)
     $8.0

     $6.0

     $4.0
                                                                       $2.4              $2.4
     $2.0                                    $1.6           $1.4


     $0.0
                  Capital works              Other capital            Loan redemption



   Cash Management and Investment Performance
   Total cash on hand at the end of February was $82 million. Included in this balance are funds
   held in trust and for restricted purposes (e.g. unexpended levy and grant funds), cash inflows
   from the January rate levy, prepaid grants including the financial assistance grant and other
   capital works grants, as well as any other monies committed for funding capital projects which
   are underway and will continue during the financial year.

   The following pie charts present the mix of cash held at February 2021 by agency (graph on
   the left) and by credit risk rating (graph on the right). All funds have been invested in
   accordance with the Investment Policy and in consideration of the principles of ethical
   investment, preservation of capital, return on investment and counterparty thresholds.

                                                                                                Page 71 of 80

Section 72

GENERAL COMMITTEE MEETING AGENDA                                                                            15 MARCH 2021



   Figure 6: Closing Cash Held by Agency and Credit Rating



                              CBA                                                        A1 +
                              3%                                                    (Commercial Banks)
                                                                                          3%




                                                                                            A1 +
                          QTC                                                              (QTC)
                          97%                                                               97%




   The following chart monitors the 12-month trend on total cash and the agencies invested.
   Payments received in February from bi-annual rates generated a significant increase in cash,
   which was has been invested in short term QTC deposits in line with Council’s Investment
   Policy.

   Figure 7: 12 Month Trend of Cash Invested by Agency
    100,000,000

     90,000,000

     80,000,000

     70,000,000

     60,000,000

     50,000,000

     40,000,000

     30,000,000

     20,000,000

     10,000,000

             -
                 Mar-20   Apr-20   May-20   Jun-20   Jul-20   Aug-20    Sep-20   Oct-20   Nov-20   Dec-20    Jan-21   Feb-21


                  Bendigo TD         Westpac TD        NAB TD          Suncorp TD         CBA TD       QTC        CBA Operating




                                                                                                               Page 72 of 80

Section 73

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                           15 MARCH 2021


   Measures of Financial Sustainability
   The following table incorporates a set of financial sustainability indicators to further assist in
   managing Council financial performance. There are no current emerging risks regarding
   financial performance year to date.

    Category                                                                                                                                                                    Comments
    Operating Surplus Ratio                                                                                                                                                     •   Intent: Identifies the extent
                                         90%                                                                                                                                        to which revenues cover
                                         80%
                                                77.3%                                                                                                                               operational expenses, to
                                         70%
                                                                                                                                                                                    ensure community equity is
                                         60%
                                                        59.1%                                                                                                                       not degraded.
                                         50%                       43.2%                                                                                                        •   Target: 0 – 10%
                                                                                                            37.9%
                                         40%                                 30.9%                                     30.7%                                                    •   Result: 30.7%
                                         30%                                                                                                                                    •   Comment: The ratio will
                                                                                       15.7%
                                         20%                                                                                                                                        decline from February to
                                         10%                                                         4.6%                                                                           June as the January rates
                                          0%                                                                                                                                        is expended on delivery of
                                         -10%                                                                                                                                       Council services.
                                                 Jul        Aug        Sep       Oct       Nov       Dec        Jan        Feb        Mar        Apr       May       Jun


                                                        Actual                         Budget                          Minimum                              Target


    Cash Expense Cover                                                                                                                                                          •   Intent: Indicates how long
                                         14.0                                                                                                                                       Council     can     continue
                                                                                                                                                                     12.5
                                                                                                                                                                                    paying     its    day-to-day
     Months (Cash to Cover Operations)




                                                 11.5                                                11.5
                                         12.0                                                                   11.1       10.7                                                     expenses from cash at
                                                            10.2                                                                      10.1
                                                                       9.5                                                                                 9.7                      bank     without    needing
                                         10.0                                              8.7                                                   9.1
                                                                                 8.6
                                                                                                                                                                                    additional cash flows.
                                          8.0
                                                                                                                                                                                •   Target: > 3 months
                                          6.0                                                                                                                                   •   Result: 12.5 months
                                          4.0                                                                                                                                   •   Comment: Whilst current
                                                                                                                                                                                    cash cover remains above
                                          2.0
                                                                                                                                                                                    target, business as usual
                                           -            -          -         -         -         -          -          -          -          -         -         -          -       expenditure and any other
                                                 Mar        Apr        May       Jun       Jul       Aug        Sep        Oct        Nov        Dec       Jan       Feb            unforeseen          financial
                                                            Actual                                                               Minimum (>0 months)                                impacts through to 30 June
                                                            Target (3 months)                                                    Maximum (6 months)                                 2021 will degrade Council’s
                                                                                                                                                                                    cash holdings.
    Asset Sustainability Ratio                                                                                                                                                  •   Intent:    Measures      the
                                         120%                                                                                                                                       extent to which assets are
                                                                                                                                                             100.1%                 being replaced as their
                                         100%                                                                                                                                       condition     degrades    to
                                                                                                                                                                      90%           ensure service potential is
                                          80%                                                                                                                                       maintained.
                                                                                                                59% 60%                                                         •   Target:        90%         of
                                          60%                                                        55%
                                                                                           45%                                                                                      depreciation budget spent
                                          40%                          29%
                                                                                 34%                                                                                                on renewals annually
                                                                                                                                                                                •   Result: In line with budget
                                          20%               13%
                                                                                                                                                                                •   Comment: The ratio will
                                                  1%
                                           0%                                                                                                                                       progressively       increase
                                                  Jul       Aug        Sep       Oct       Nov       Dec        Jan        Feb        Mar        Apr       May       Jun            each month as expenditure
                                                                                                                                                                                    on renewals occurs.
                                                  Actual Renewal Spend (%)                                 Target (%)                    Renewals Budget (%)




                                                                                                                                                                                              Page 73 of 80

Section 74

GENERAL COMMITTEE MEETING AGENDA                                                                                                                        15 MARCH 2021


    Category                                                                                                                                 Comments
    Net Financial Liabilities Ratio                                                                                                          •   Intent: Outlines the level
                                                                                                                                                 that net Council debt can
                      80%
                                                                                                                                                 be serviced by operating
                                                           60%
                      60%                                                                                                                        revenues. A ratio below
                                                                                                                                                 zero implies that liabilities
                      40%                                                                                                                        are less than cash (and
                                                                                                                                                 other current assets) and
                      20%                                                                                                                        there       is     adequate
                                                                                                                                                 borrowing           capacity
                                      0%                                                                                                         available if needed.
                                                        Target                            Budget                       YTD Actual
                                                                                                                                             •   Target: less than 60%
             -20%                                                                          -8%
                                                                                                                                             •   Result: -48%
             -40%                                                                                                                            •   Comment: Council has low
                                                                                                                         -48%
                                                                                                                                                 debt levels and strong cash
             -60%
                                                                                                                                                 holdings. The ratio will
                                                                                                                                                 reduce through to June as
                                                                                                                                                 cash is expended on capital
                                                                                                                                                 and operational activities.
    Investment Return                                                                                                                        •   Intent: Ensure appropriate
                                                                                                                                                 return on investment yield
                                                                                                                                                 for cash at bank.
                                                                                                                                             •   Target:     0.25%     above
                                                                                                                                                 current           Bloomberg
                                                                                                                                                 commonwealth 10 year
                                                                                                                                                 bond rate yield (0.00%)
                                                                                                                                             •   Result: 0.41%
                                                                                                                                             •   Comment: Regardless of
                                                                                                                                                 the current levels of low
                                                                                                                                                 long term bond and interest
                                                                                                                                                 rates (due to current
                                                                                                                                                 economic         conditions),
                                                                                                                                                 Council’s investment return
                                                                                                                                                 still remains above target.
    Rates in Arrears                                                                                                                         •   Intent: Ensuring that the
                                                                                                                                                 amount of unpaid rates
                                             12.0%
                                                                                                                                                 remains sustainable and
     Percentage of Annual Rates in Arrears




                                             10.0%
                                                                                                   9.6%                                          does not negatively impact
                                                     8.3%                                                                                        cash flows.
                                                            7.5%
                                              8.0%                 6.9%
                                                                          6.5%
                                                                                                          7.1%                               •   Target:     5%      industry
                                                                                                                 6.0% 5.8% 5.7%
                                              6.0%
                                                                                 5.8%                                                            benchmark
                                                                                                                                      5.0%
                                                                                           4.5%                                              •   Result: 5.0%
                                              4.0%
                                                                                                                                             •   Comment:      Arrears     %
                                              2.0%
                                                                                                                                                 progressively decreasing
                                                                                                                                                 towards      target      as
                                              0.0%                                                                                               outstanding balances are
                                                     Mar    Apr    May    Jun     Jul      Aug     Sep    Oct    Nov    Dec     Jan   Feb        collected.
                                                                                 Actual             Target




   Previous Council Consideration
   Nil.

   Finance
   As above.


                                                                                                                                                           Page 74 of 80

Section 75

GENERAL COMMITTEE MEETING AGENDA                                                    15 MARCH 2021



   Risks & Opportunities
   Council’s risk register includes a number of risks that could impact on ongoing financial
   sustainability. Effective budget management and reporting is an important risk mitigation tool.

   Consultation
   External Consultation - Community & Stakeholder
   Nil.

   Internal Consultation
   All areas of Council are consulted as part of the regular monitoring of budget performance.

   Departments/Sections Consulted:

    X     Chief Executive Officer   X   Community Services                      X   Corporate Services
          Executive Officer             Director                                X   Director
          Executive Support             Community Development                   X   Financial Services
                                        Community Facilities                        ICT
                                        Libraries & Galleries                       Procurement & Fleet
                                        Local Laws                                  Property
                                        Waste & Environmental Health                Revenue Services

    X     Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
          Director                      Director                                    Director
          Community Engagement          Building & Plumbing Services                Asset Management
          Customer Service              Development Assessment                      Buildings and Facilities
          Governance                    Economic Development                        Civil Operations
          People and Culture            Environmental Services                      Disaster Management
                                        Strategic Land Use Planning                 Infrastructure Planning,
                                                                                    Design and Delivery




                                                                                       Page 75 of 80

Section 76

GENERAL COMMITTEE MEETING AGENDA   15 MARCH 2021




                                    Page 76 of 80

GENERAL COMMITTEE MEETING AGENDA                                                                   15 MARCH 2021

                                                                                                    Attachment 1

  Profit and Loss Statement
  Revenue
    Recurrent Revenue
     Rates, levies and charges                       68,388         68,402        69,340            O47      101%
     Fees and charges                                 6.640          4490          5,148           658       78%
     Interest received                                  870            510           481           (29)       55%
     ‘Sale of Goods and major services                 7.281         4,604          7446          2.842      102%
     Sale of contract and recoverable works              23              -             5              5      21%
     Rental & lease income                             1,197                         980           158        82%
    Other income                                       726            502           657             65        83%
     Grants, subsidies, contributions and donations   6,115          3464           3,588          124       5o%
     Unitywater Distributions                         5,650         2,004          2,904              -      51%
                                                     96,958         85,788        90,557         4,768       93%
  Expenses
     Recurrent Expenses
    Employee benefits                                 4752         22,586         22,0344          562       63%
    Materials and services                           44473          26,601        26,960          (358)      61%
     Finance costs                                     1,538          1,006         054             53       62%
    Depreciation                                      18,963         12,642        12,656          (14)      67%
    Other expenses                                      189            130           178          (49)       25%
                                                     93,915         62,967        62,782           184        63%
 OperatingResutt =                                      STR
  Summary of Capital Revenue and Expenditure
  Capital Funding
     Capital cash contributions and infrastructure charges 1521       1,384         1414             3       93%
    Contributed assets                                 2.000            12            13              1       1%
     Capital grants and subsidies                     11,642         3,507         5,676          2.168      40%
     Cash / revenue                                   18,810         9,970         9,398           (571)      50%
     New loan borrowings                               3.420             -             -              -       o%
     Other capital revenue                                 -             -            11             ba       O%
 Total CapitalRevenue                                                 BTS           SISA
  Capital Expenditure
    Contributed assets                                 2.000            12            13              1       1%
     Capital works - constructed assets              28,912          10,874        11,422          548       40%
    Capital works - other capital                      4,066          1,573         1,408          (164)      35%
     Loan redemption                                   2414          2414           2414              -      100%
     acanaes a                                             -             -          1,255         1255        o%

                                                                                                      Page 76 of 80

The text continues on section 77.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.