Original source · versioned page text
2021-03-15 General Committee Agenda
The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 15 MARCH 2021
The application was supported by a range of supporting material including:
• Town Planning Report
• Acoustic Report
• Traffic Engineering Report
• Geotechnical Investigation Report
• Ecological reports
• Engineering Services Report
• Bushfire Hazard Assessment and Management Plan
• Economic Need Assessment
• Community Needs Assessment
• Infrastructure Agreement
• Unitywater Decision Notice
It is the applicant’s position that the proposal provides for the following community benefits,
a number of which are proposed to be delivered via an Infrastructure Agreement between
Council and the applicant.
Supporting the viability of an important community sports club (the Cooroy Golf Club)
The Cooroy Golf Club is an important community use which has been experiencing financial
hardship as a result of a declining membership base.
GemLife agree to be bound by an Infrastructure Agreement that will deliver a number of
financial and social benefits to the Cooroy Golf Club in an effort to make sure the club stays
viable into the future. A summary of these committed benefits is provided below:
a) Guaranteed membership boost – Guaranteeing 1 golf membership per new dwelling
in the GemLife resort for a period of 10 years.
b) New clubhouse facilities – Construction and fitout of a new golf clubhouse with a
dedicated pro shop, restaurant, café, function room, outdoor deck and terrace area.
This clubhouse has been designed to accommodate weddings and functions so that
the club will have the ability to generate supplementary income from such events (in
addition to golf course activities).
c) New and safer access – Safer vehicle access to the golf course and clubhouse via a
new private road and associated access rights. This is a significant improvement upon
the existing access and car park from Myall Street.
d) New and larger car park – A new car park with 97 dedicated car spaces to cater for
patrons of the golf course and clubhouse (significantly more than the current car park
capacity).
e) New golf buggy storage facilities – A new golf buggy storage shed with space for
the permanent storage of 40 carts.
f) Modifications to golf course – Reconfiguring the golf course to maintain 18 holes
whilst accommodating a newly re-located club house, car park and associated access.
Promoting synergy between the golf course and GemLife retirement resort – GemLife
are committed to promoting a genuine synergy between the Golf Club and the retirement
resort. The benefits of co-locating retirement living with other land uses is well documented
as being a positive impetus for social interaction and inclusion. The GemLife community will
result in a population of around 500 people on the doorstep of the golf club, many of whom
will take advantage of their included membership by taking up the sport or taking advantage
of the dining / leisure opportunities available in the clubhouse. GemLife is optimistic that this
development will re-enliven the club’s membership base and result in improved social
opportunities for both Golf Club members and GemLife Residents.
Page 26 of 80
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.