Council archive · source document
Approved Plans - MCU19-0055 & OPW19-0115 · MCU19/0055
Plans and drawings: the text below has words only, no drawings.
Very large file (10.3 MB): may take a few minutes to open.
Original PDF page 2, section 3. The text section number identifies this passage in the reader.
03/05/2019
BJH
BJH Wind Category: To engineers spec.
Site Plan
Email: [email protected] 1.0
Website: www.iconbuildingdesign.com.au Project Issue Date: 30/06/2019 Project Status: Development Application 1.0 Scale: As indicated
5 RFI 1.0 30/06/2019 BJH
Phone: 0488209840 Checked/Signed By Director: Bradley Hunt Drawn By: BJH QBCC LIC# 126221
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU19-0055 & OPW19-0115.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.