Original source · versioned page text
RFI - 20210153 Maple St Civil Plans
Original PDF page 8, section 2. The text section number identifies this passage in the reader.
LOCATION
\
\
\
\ SEDIMENT STORAGE
0
(
W
.8 \ \ \ (
121 \ OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE
\
\
\
\
\ ZONE
(
|S|
(
E
\
/
\ (
\
|S|
\
\ TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
\
\
\ \
/ \
/
( (
T
\
114.6
\
\
S
(
\
\ 8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN 1/3 OF THE CAPACITY
\
\
( \ ( ( OTHER ESC BY THE END OF THE
\
|S|
11
( FOUND TO BE DIFFERENT OR FAILED IN SERVICE, CORRECTIVE
W
OF ESC MEASURES IS
\
6.2
( MEASURES DAY
\
\
(
|S|
\
(
\
ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY EXCEEDED
E
114.4
W
\
\
\
.0
(
\
122
(
( INCLUDE AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED
S
(
\
\ \
\
W
\
( (
EROSION CONTROL PLANS. SUCH AMENDMENTS ARE TO BE
114.2
( (
\
\
\
E
( ( ( APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND REPORTING
\
(
\
(
\
>
119.8
\
T
( 17. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC
RELEVANT.
(
\
\
122.2 (
\
|S|
MAINTENANCE AND CONTROL OF ALL STAGES OF WORK FOR
\
\
9. OVERALL
(
\
(
(
W
(
(
(
\
\
\
119.6
APPROVAL BY THE SUPERINTENDENT.
\
\
\
\
(
( 0.2
(
( ( \
E
\
(
\
>
12
W
\
\
\
114.0
\ (
S
\
114
\
W
4
\
\
2. (
( (
115
\ (
119.4
12
115
\
\
S
\
\
E
(
\
.8 |S|
115
(
( \
(
\
.0
115
\
\
\
\
>
.2
115
\
T
\ (
.4
0.0
116 \ \
\
\
(
\
(
(
(
.6
(
12
\
(
LEGEND:
/
\
.8
(
(
\
\
\
W
.0
(
\ \
/
3.8
\
119.2
\ \
\
(
\
\ \ (
E\
>
\
\
\
11
\
(
(
|S|
S
\ ADJACENT BOUNDARY
(
W
\
( \
(
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - 20210153 Maple St Civil Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.