Council archive · source document
Attachment 2A - Emergency Management Plan Noosa - Final · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
FM – 6.3.5 Emergency Management Plan template
3 Roles and Responsibilities
3.1 Emergency Control Organisation (ECO)
The structure of the Emergency Control Organisation is illustrated below and are issued with
coloured hats to assist with easy identification:
Chief / Deputy Warden Deputies shall be appointed to all positions
(White Hat) where the primary role is not available.
Floor / Area Warden The lines of communication begin & end
with the Chief Warden. This role is vital in
(Yellow Hat) the efficient gathering of information and
Warden coordination of an emergency situation.
(Red Hat) It is the role of the ECO to organise and
supervise the safe movement of all
First Aid occupants in an emergency where the
(Green Hat with White Cross)
primary role is not available.
Chief/Deputy Warden hats are kept at the Fire Panel. Floor / Area Warden hats are kept in
each department where the Floor / Area Warden primary works, with the remaining Evacuation
Warden hats are kept in each department of the main central facilities building.
Appointed members of the ECO must:
• Be physically capable of performing their duties;
• Have leadership qualities and command authority;
• Have maturity of judgment, good decision-making skills and be capable of remaining
calm under pressure;
• Be familiar with their areas of responsibility;
• Be available to undertake their appointed duties;
• Have clear diction and be able to communicate with the majority of occupants and
visitors; and
• Be willing and able to undergo relevant training.
ECO training shall be provided six monthly and an annual trial evacuation shall also be provided.
Document Title: Issue: 6 Next review date:
FM – 6.3.5 Emergency Management Plan Review date: February 2026 June 2026
Noosa Resort
Document Owner: Authorised by: Page: 18 of 77
Health Safety & Wellbeing Manager HSW
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2A - Emergency Management Plan Noosa - Final.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.