FM – 6.3.5 Emergency Management Plan template
4 Training
RACV will ensure that all workers, including full time, temporary, casual, contractor workers and
volunteers are trained and competent in fulfilling their role in an emergency situation. This
section outlines the specific training details for each role.
To ensure a consistent approach, RACV maintains an organisation wide Training Matrix which
is to ensure a consistent approach, FM – 3.2.2 Training Matrix Template is accessible on
CHARLi Health Safety & Wellbeing page.
4.1 ECO Training
The Property & Capital Works (PCW) Team manage the relationship with the training providers
and will coordinate with each sites Emergency Planning Committee (EPC) to organise regular
training for the Emergency Control Organisation (ECO) and ensure the building occupants
participate in an emergency response exercise at least once in any 12-month period.
The training program is delivered by a competent person as deemed by AS3745 on a minimum
6 monthly basis, typically the training program entails:
• Evacuation Procedures
• Bomb Threat Procedures
• Fire Awareness
• Use of Fire Extinguishers and Hose Reels
• Any other training as deemed appropriate to reflect emerging trends or site-specific
considerations.
Typically, onsite training will be conducted on the day of an emergency or evacuation trial, and
additional online training is available for EPC and ECO members.
4.2 Occupants & Visitors
A General Evacuation Instruction must be given to workers, occupants, and visitors within two
days of commencing work, and then annually. These instructions must include the location of
fire safety reference points (exits, fire equipment etc.) and the procedures for evacuating the
building safely. All occupants and visitors are to participate in the annual evacuation exercise.
4.3 Contractors & Volunteers
All Contractors and Volunteers must complete both the RACV General Contractor Online
Induction, prior to site arrival, and the Site-Specific Site Induction. The Site-Specific induction
will outline the General Evacuation Instructions that must be adhered to.
Document Title: Issue: 6 Next review date:
FM – 6.3.5 Emergency Management Plan Review date: February 2026 June 2026
Noosa Resort
Document Owner: Authorised by: Page: 23 of 77
Health Safety & Wellbeing Manager HSW
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2A - Emergency Management Plan Noosa - Final.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.