   FM – 6.3.5 Emergency Management Plan template

    7.5 Unconscious Persons

   Wardens will use “implied consent” for any unconscious person in imminent danger only. Move
   them to the nearest fire safe area or compartment.

   The Warden will nominate a person – preferably a First Aid Officer or another Warden, to stay
   with the unconscious person in a safe place. This must be reported to the Chief Warden. When
   using exits, all doors should be closed to provide isolation from the danger area. If you are
   moving the unconscious person into an emergency stair, allow able-bodied staff to evacuate
   first.

   Do not move the person more than is necessary, as you may be unaware of the extent of their
   injuries. If the unconscious person is not in imminent danger do not move them but ensure
   someone remains with that person and the Chief Warden is notified of their location.


    7.6 Refusal to Evacuate or Follow Warden Directions

   Should an occupant refuse to follow directions given by a Warden from the Emergency Control
   Organisation:

       •   Ensure the person clearly understands the direction to evacuate the building is because
           the emergency situation may be life threatening; and
       •   Notify the Chief Warden (Evacuation Coordinator) who will advise the Officer in Charge
           of the attending Emergency Service who can take appropriate action to remove the
           person.


    7.7 Contractors & Visitors

   All effort must be made to provide for the safety and welfare of contractors that may be working
   on site. In an evacuation, where practicable, the ECO personnel should check that all persons
   are cleared from the floor or area of their responsibility. The ECO personnel should report the
   result of the check to the Chief Warden.

   The Site Contractor & Visitor Sign Register is the record of contractors on site, and the Register
   should be made available to the ECO for reference in the event of an emergency.

   Wardens should be informed of any visitor or contractor that will be in their area of responsibility
   so that their whereabouts can be accounted for during an evacuation.




Document Title:                            Issue: 6                                  Next review date:
FM – 6.3.5 Emergency Management Plan       Review date: February 2026                June 2026
Noosa Resort
Document Owner:                            Authorised by:                            Page: 31 of 77
Health Safety & Wellbeing                  Manager HSW

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 2A - Emergency Management Plan Noosa - Final.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.