   FM – 6.3.5 Emergency Management Plan template

   Stage 3 – 12 Hours from imminent cyclone
         All Key Emergency Personnel have completed their duties under Stage 2 of the
    
         emergency plan.
        The Emergency Incident Log is updated.
        All guests and staff advised to move to the Designated Safe Area.
        The CEO, Executive GM and RACV Public Affairs have been notified.
        Regular Cyclone Warning updates are received and Cyclone Tracking Map updated.
         All guest rooms are checked to ensure everyone has vacated the rooms to the
    
         Designated Safe Area.
         Sandbags and pumps have been deployed and taping / boarding of windows
    
         commenced.
        Water and food supplies are available for the Designated Safe Area.
        Critical information and IT systems have been backed up.
        Linen, amenities and refreshments are available in the Designated Safe Area.
        The SES has been contacted.
        Crash Shut Down is enacted if required.
        Guests are advised of the current weather conditions.


   Stage 4 – Post emergency / clean up
        Confirm the cyclone emergency has passed.
         All Key Emergency Personnel commenced tasks under Stage 4 of the emergency
    
         response plan.
        The Emergency Incident Log is updated.
        Work Teams coordinated to report on damage and safety.
        Guest rooms are checked for safety and whether they can be re-occupied.
        The SES has been advised if their assistance is required.
        Utilities are restored to normal operation as required (electricity, water, gas etc.).
        Photographs and reports of building damage is completed.
        Any injured guests or staff and referred for further medical treatment as required.
        A First Aid room and supplies have been returned.
        Kitchen/Restaurant areas checked for serviceability & restored to operational status.
        IT systems are returned to operational status.
        Guests are returned to rooms once they have been declared safe.
        The CEO, Executive GM and RACV Public Affairs have been notified.
        Sand-less sandbags and pumps are returned once no longer needed.
        All taping and boarding is removed where no longer required.
        All machinery and equipment, outdoor furniture etc. is checked and returned to service.
Document Title:                            Issue: 6                                   Next review date:
FM – 6.3.5 Emergency Management Plan       Review date: February 2026                 June 2026
Noosa Resort
Document Owner:                            Authorised by:                             Page: 50 of 77
Health Safety & Wellbeing                  Manager HSW

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 2A - Emergency Management Plan Noosa - Final.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.