Skip to the record
Beware of cheap imitations.

Original source · versioned page text

CHANGE - Engineering Plans

of 30

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

                                                     GENERAL NOTES                                                                                    22. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE                                                                            MATTER AND STONES, WITH MAXIMUM PARTICLE SIZE OF 100MM AND CAPABLE                      INSPECTIONS:
                                                                                                                                                          BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF                                                                           OF BEING COMPACTED INTO COHERENT FILLING TO THE SPECIFIED
                                                     1.    ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.                                     THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD                                                                        STANDARD. THE MATERIAL SHALL HAVE A MAXIMUM PLASTICITY INDEX OF 15%,                    THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
                                                                                                                                                          RESERVE, PARKS/OPENSPACE, EASEMENTS.                                                                                                 A SHRINK-SWELL INDEX OF LESS THAN OR EQUAL TO 1% AND A MINIMUM C.B.R.                   BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO
                                                     2.    ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.                                                                                                                                                                    OF 10%.                                                                                 PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS.
                                                           CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY                                                                                                                                                                                                                                                                   SHOULD THE CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR
                                                                                                                                                      23.    THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION
                                                           SETOUT THE WORKS.                                                                                                                                                                                                                                                                                                           WILL BE RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE
                                                                                                                                                             DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.                                                                               7.     ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE
                                                                                                                                                                                                                                                                                                                                                                                       INSPECTED TO THE SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO
                                                                                                                                                                                                                                                                                               CONTENT FOR STANDARD COMPACTION.
                                                     3.    ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT                                                                                                                                                                                                                                                                      BE RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID BY THE
                                                                                                                                                      24.    ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN                                                                                                                                                               CONTRACTOR.
                                                           SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE                                         ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND                                                               8.     ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE
                                                           CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT                                         CONSTRUCTION CODE (2013).                                                                                                         PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF RETAINING
                                                           GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED STANDARD                                                                                                                                                                                                                                                            a. PRESTART
                                                                                                                                                                                                                                                                                               WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN CUT. RETAINING
                                                           DRAWINGS AND SPECIFICATIONS U.N.O.                                                         25. CONTOURS IN ADJACENT PROPERTIES HAVE BEEN GENERATED USING LIDAR                                                                      WALLS ARE TO BE PREPARED IN ACCORDANCE WITH STRUCTURAL ENGINEERS
                                                                                                                                                          TOPOGRAPHY DATA FROM THE NOOSA-GYMPIE 2015 PROJECT AND JOINED TO                                                                     SPECIFICATIONS,   AND  IN    CONFORMANCE     WITH   CONSTRUCTION                         b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT
                                                     4.    SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF                                  SURVEY DATA FOR CONCEPTUAL PURPOSES ONLY. DUE TO THE NATURE OF                                                                       REQUIREMENTS OF GEOTECHNICAL REPORT.                                                        AND EROSION CONTROL MEASURES UNSUITABLE GROUND
                                                           THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND                                  LIDAR TOPOGRAPHY, DISCREPANCIES BETWEEN SURVEY LEVELS AND
                                                           LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT                                   ADJOINING LEVELS MAY ARISE. IN THESE INSTANCES, SURVEY LEVELS ARE TO                                                          9.     REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION                            c. SIDE AND CUT OFF DRAINS
                                                           THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR.                                TAKE PRECEDENCE.                                                                                                                     OF RETAINING WALL COLOUR AND FINISH.
                                                                                                                                                                                                                                                                                                                                                                                        d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
                                                     5.    EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH                         STANDARD SIGNS AND LINE MARKING NOTES                                                                                             10.    ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2' SOIL
                                                           THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS TAKEN BY                                                                                                                                                                  ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF AS 3798.
                                                           RECOR OR THE PRINCIPAL FOR THE ACCURACY AND COMPLETENESS OF THIS                           1.   GENERAL                                                                                                                                                                                                                      e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
                                                                                                                                                        a. ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH THE                                                                      THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE
                                                           INFORMATION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO                                                                                                                                                                          CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN
                                                           ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF ALL EXISTING                                     QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
                                                                                                                                                                                                                                                                                               CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS                           f. STORMWATER STRUCTURE BASE SLABS
                                                           SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY DISCREPANCIES                                 (CURRENT EDITION).                                                                                                                  AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE TO THE REQUIRED
                                                           SHALL BE REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO LOCATE                              2. SIGNS                                                                                                                                 BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES AS SPECIFIED BY
                                                           AND PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS.                                                                                                                                                                                                                                                                      g. PAVEMENT SUBGRADE
                                                                                                                                                        a. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS NOTED                                                                 THE GEOTECHNICAL REPORT.
                                                                                                                                                           OTHERWISE.
                                                     6.    THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND                                                                                                                                                                   11.    ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO                            h. PAVEMENT REINFORCING
                                                                                                                                                        b. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO EDGE OF
                                                           SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN ON                                                                                                                                                                  98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX OF AT
                                                           THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES                                  SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE POSTS BARRIER
                                                                                                                                                                                                                                                                                               LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN LAYERS OF                        i.   PAVEMENT PRIOR TO SEALING (PRESEAL)
                                                           PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO IMMEDIATELY                                 KERB 300 FROM FACE MOUNTABLE KERB 500 FROM FACE OF KERB.
                                                                                                                                                                                                                                                                                               250MM LOOSE THICKNESS (PRIOR TO COMPACTION).
                                                           REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL DIRECTION                                 c. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING TRAFFIC
                                                           PRIOR TO COMMENCING CIVIL WORKS.                                                                                                                                                                                                                                                                                             j. RETAINING WALL FOOTING REINFORCING
                                                                                                                                                           AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO BE TURNED                                                             12.    COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS PER
                                                                                                                                                           AWAY BY 5° FROM THE NORMAL TO APPROACHING HEADLIGHT.                                                                                VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED 300MM IN
                                                     7.    ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL                                                                                                                                                                   ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL EARTHWORKS                           k. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
                                                                                                                                                      3. SIGN SUPPORTS
                                                           BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS,                                                                                                                                                                          TESTING IN ACCORDANCE WITH GEOTECHNICAL ENGINEER AND LOCAL
                                                                                                                                                        a. SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS WHERE THEY
                                                           CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS.                                                                                                                                                                     AUTHORITY REQUIREMENTS.                                                                  l.   STEEL REINFORCEMENT OF CONCRETE STRUCTURES
                                                                                                                                                           ARE IN A PAVED SURFACE.
                                                     8.    CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO                                4. LINEMARKING
                                                                                                                                                        a. REDUNDANT LINEMARKING IS TO BE GROUND OFF.                                                                                   13.    FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN                            m. PRACTICAL COMPLETION
                                                           AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT                                                                                                                                                                    ACCORDANCE WITH LANDSCAPE DRAWINGS.
                                                           TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF                                         b. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.
                                                           INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL.                                                                                                                                                                                                                                                                            n. ON MAINTENANCE
                                                                                                                                                                                                                                                                                        14.    ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.

                                                     9.    CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL
                                                                                                                                                      JOINTING NOTES                                                                                                                                                                                                                    o. OFF MAINTENANCE
                                                                                                                                                                                                                                                                                        15.    ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED
                                                           WORKPLACE HEALTH AND SAFETY REQUIREMENTS.                                                  1.     ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE                                                                            MANAGEMENT PLANS.
                                                                                                                                                             REQUIREMENTS OF AS3727.1:2016.
                                                                                                                                                                                                                                                                                                                                                                                        p. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
                                                     10.   WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE                              2.     SAW CUT JOINTS MUST BE:
                                                                                                                                                                                                                                                                                        16.    CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE                                  DEVELOPMENT APPROVAL)
                                                                                                                                                           a. BETWEEN 1 AND 1 OF CONCRETE PAVEMENT DEPTHS.
                                                           PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,
                                                                                                                                                                                                                                                                                               INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT FENCE ETC IN
                                                           CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES                                              4     3
                                                                                                                                                                                                                                                                                               ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN
                                                           NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND                                 b. CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.
                                                           INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION
                                                                                                                                                        c. PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS.                                                                  17.    ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR
                                                           EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
                                                                                                                                                      3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT TO                                                                     RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER RELEVANT
                                                                                                                                                           ALLOW EXPANSION AND CONTRACTION MOVEMENTS.                                                                                          AUSTRALIAN STANDARDS AND LEGISLATION.
                                                     11.   PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE
                                                                                                                                                      4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO
                                                           DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN
                                                                                                                                                           CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES IN THE                                                             18.    DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED
                                                           CONFIRMATION THAT WORKS CAN COMMENCE.
                                                                                                                                                           CONCRETE SLAB AND AVOID MISMATCHED JOINTS.                                                                                          ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT LEVEL TO
                                                                                                                                                      5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES ONLY                                                                     SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO COVER
                                                     12.   CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL                                           AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB SURFACE.                                                                   OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL TO RESTRICT
                                                           CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT                                      6. DOWEL BARS ARE TO BE                                                                                                                  DUST MOVEMENT.
                                                           REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO                                a. FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT 400MM
                                                           NOTE COUNCILS ADAC REQUIREMENTS.
                                                                                                                                                           CENTRES                                                                                                                      19.    PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS
                                                     13.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT                                b. FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT 300MM                                                                    DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN
                                                           APPROVALS.                                                                                      CENTRES                                                                                                                             CONFIRMATION THAT WORKS CAN COMMENCE.
                                                                                                                                                        c. FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT 300MM
                                                     14.   CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,                                                                                                                                                                    20.    ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE
                                                                                                                                                           CENTRES
                                                           LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL                                                                                                                                                                            REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE
                                                           CONSTRUCTION.                                                                                                                                                                                                                       GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY
                                                                                                                                                                                                                                                                                               UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED AT
                                                                                                                                                      EARTHWORKS NOTES                                                                                                                         1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M IN
                                                     15.   CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION
                                                                                                                                                      1.     FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL                                                                         HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE GEOTECHNICAL
                                                           WORKS COMMENCING ON SITE.
                                                                                                                                                             INVESTIGATION REPORT BY GEOTECHNICAL ENGINEER. IT IS RECOMMENDED                                                                  ENGINEER.
                                                                                                                                                             THAT THE GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE
                                                     16.   CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS
                                                                                                                                                             SOIL CONDITIONS PRIOR TO EARTHWORKS COMMENCING.                                                                            21.    WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED,
                                                           AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
                                                                                                                                                                                                                                                                                               TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE OF A
                                                                                                                                                      2.     GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM                                                                   SPECIALIST SHORING CONTRACTOR.
                                                     17.   CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING
                                                                                                                                                             OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE AND
                                                           PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT
                                                                                                                                                             STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING AREAS. TOPSOIL                                                           22. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
                                                           OF ANY WORKS ON SITE.
                                                                                                                                                             MATERIALS MUST NOT BE USED IN STRUCTURAL FILL.                                                                                 SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE CARRIED
                                                                                                                                                      3.     UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT                                                                  OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ STRUCTURAL
                                                     18.   CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED                                 MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING SUBGRADE                                                                        ENGINEER.
                                                           IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO                                         PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE MATERIAL TO BE
                                                           ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND                                       REMOVED FROM SITE AT CONTRACTORS EXPENSE.                                                                                  23. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY
                                                           BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH
                                                                                                                                                                                                                                                                                            CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES ON THE SITE
                                                           ALL CLEARED VEGETATION ANDSTOCKPILE ON SITE OR REMOVE FROM SITE
                                                                                                                                                      4.     COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES SUBSTANTIAL                                                                   HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF
                                                           AS DIRECTED.
                                                                                                                                                             VOLUMES OF WATER COMBINED WITH VIBRATORY COMPACTION EQUIPMENT.                                                                 SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR SATISFACTION.
                                                                                                                                                             CARE MUST BE TAKEN TO ENSURE THERE ARE NO IMPACTS ON SURROUNDING
                                                     19.   DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECT, SURVEYOR,
                                                                                                                                                             STRUCTURES. MATERIAL TO BE COMPACTED IN ACCORDANCE WITH                                                                    24. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF
                                                           HYDRAULICS, ETC. CONSULTANT AND CONTRACTOR DRAWINGS.
                                                                                                                                                             GEOTECHNICAL REPORT AND AS1289.                                                                                                TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING DRAWINGS FOR
                                                                                                                                                                                                                                                                                            BUILDING SLAB THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR
                                                     20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:
                                                                                                                                                      5.     A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED                                                                DRAINAGE FOR DETERMINATION OF REQUIRED BULK EARTHWORKS SURFACE.
                                                         ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS
                                                                                                                                                             ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN AREAS TO IMPROVE
                                                         WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS
                                                                                                                                                             TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE REQUIRED PRIOR TO                                                        25.    ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
                                                         ASSOCIATED WITH IMPLEMENTATION OF THE TMP.
                                                                                                                                                             MOBILISATION AND TRAFFICKING OF ANY HEAVY MOBILE PLANT ON THE SITE.                                                               GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW FOR
                                                                                                                                                                                                                                                                                               THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE
                                                     21.   ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY
                                                                                                                                                      6.     IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED                                                                    THE PRELOADING OPERATIONS.
                                                           APPROVALS RECEIVED FOR THE PROJECT AND IN ACCORDANCE WITH OPW
                                                                                                                                                             WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED AND AS OTHERWISE
                                                           APPROVALS BY COUNCIL.
                                                                                                                                                             NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED GENERAL                                                              26. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
                                                                                                                                                             FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL FREE OF ORGANIC


                                                                                                                                   ENERGY SERVICE PROVIDERS                                                                           TELECOMMUNICATIONS
                                                                                                                                                                                                                                       SERVICE PROVIDERS                                                                                                           elstra                                         Manual of Uniform Traffic Control Devices
                           BEFORE YOU DIG                       SERVICE LOCATIONS                                                    AGL
                                                                                                                                                                   ERGON.                                                                                                                                                                                               AUSTRALIA
                                                             IT IS THE RESPONSIBILITY OF THE PRINCIPAL
                                                                                                                                                                   ENERGY
                                                                                                                                                                                       energex                                   ' yes'                       Telstra                                visionstream
                                                            CONTRACTOR TO CONTACT ALL RELEVANT                                                  origin                                                                                OPTUS                                                                                                      WARNING: OPTIC FIBRE                                                NOTE: ALL SIGNS & LINE MARKING TO BE IN
                                                            SERVICE AUTHORITIES TO VERIFY THE                                    NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM                                        NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM                                                                      EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
                                                            LOCATION OF ALL EXISTING SERVICES PRIOR                                    PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED                                           PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED                                                                   VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO                          ACCORDANCE WITH THE MANUAL OF
                                                                                                                                       PRIOR TO START OF CONSTRUCTION. PHONE DBYD                                               PRIOR TO START OF CONSTRUCTION. PHONE DBYD
                                                            TO THE START OF CONSTRUCTION                                               SERVICE LOCATIONS ON 1100 FOR DETAILS.                                                   SERVICE LOCATIONS ON 1100 FOR DETAILS.
                                                                                                                                                                                                                                                                                                                                                 BE CONFIRMED PRIOR TO START OF CONSTRUCTION.                              UNIFORM TRAFFIC CONTROL DEVICES.

----      ----   ----                                                  ----      ----      North Point    Approved                                                                                                                                                                                                              Project Address                                                  Title

----      ----   ----                                                  ----      ----
                                                                                                          EOIN WHITMORE
                                                                                                                                                                                                                                                                                                                                45 MAPLE ST, COOROY AND 9 MYALL GENERAL NOTES
                                                                                               N
----      ----   ----                                                  ----      ----                     31423     17/04/2026                                                                                                                                                                                                  ST COOROY
----      ----   ----                                                  ----      ----                     For and on behalf of RECOR Pty Ltd.

----      ----   ----                                                  ----      ----                     Scale                                                                                                               ENGINEERING & PROJECT SERVICES                                                                    Client Details                                                   Project Name                                                              Sheet Size
                                                                                                                                                                                                                                 SUNSHINE COAST | BRISBANE
----      ----   ----                                                  ----      ----                                                           NTS                                                                             www.recor.au | ABN 89 647 469 707                                                               MYALL RISE PTY LTD                                               COOROY SOCIAL HOUSING                                                        A1
 A     17/04/2026 ISSUED FOR OWP APPROVAL                              AY       EW                                                                                                         COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's                                                                                   Project Number                                           Drawing Number    Revision
                                                                                                                                                                                           client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as

Rev     Date                  Revision Description                  Drawn Check                                                  DO NOT SCALE, IF IN DOUBT ASK                                                                   'Issued For Construction' in the revision description.                                                                                                          P0478-26-001                                             C002                A

Log in to download the original (CHANGE - Engineering Plans.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.