Attachment 4
Revised Civil Engineering Plans and
Response
Response to Council’s Information Request –
Combined Applications for a Development
Permit for a Material Change of Use and
Operational Works Permit to Establish Multiple
Dwellings (11 x Units)

5 Pearl Street and 54 Elm Street, Cooroy 4563 QLD
Lot 2 on RP153798 and Lot 2 on RP64750


4CD DEVELOPMENTS PTY LTD (A.B.N. 28 649 018 904)
Full text of the other 13 pages

Page 2

            18th August 2021

            Ref:      MCU21/0117 OPW21/0199

            Noosa Council
            PO Box 141
            TEWANTIN QLD 4565


            Attention:                          Wilhelm Koschade

            Dear Sir,

                         Re:                    Information Request
                         At:                    5 Pearl Street & 54 Elm St, Cooroy, QLD, 4563


            With reference to the abovementioned information request for the development
            application (ref: MCU21/0117 OPW21/0199), we have prepared an update to the
            engineering aspects of the submission to address the issues raised in the Request for
            Information as follows:

                    4. Please demonstrate that an on-going right to discharge through the downstream
                    land is available to the applicant, either through confirmation from the owner of the
                    land that the current management as an environmental/conservation area will
                    continue and permission to discharge is granted, or through confirmation from the
                    downstream landowner of agreement to register a drainage easement in favour of
                    the development site.

            The internal drainage network has been redesigned to discharge stormwater run-off from
            the site to the Pearl Street site frontage drainage system, being the legal point of
            discharge for the development. Please refer to the updated Stormwater Engineering
            Report and Roads and Drainage Layout Plan for further details.

                    5. Please provide revised sizing/modelling and associated engineering drawings
                    for the detention storage proposed for the development site, which achieves the
                    following:
                        a) Utilises a hydrologic model and is undertaken using the ensemble storms
                            approach of ARR2019;
                        b) Is undertaken generally in accordance with the procedures documented in
                            QUDM Section 5.6.2;
                        c) Demonstrates no increase in peak flows for all events up to and including
                            the 1%AEP event, for the range of durations applicable to the downstream
                            land;
                        d) Accurately represents the site catchment areas and the position and
                            catchment of each detention storage within the site;
                        e) Accurately represents any external catchments conveyed through the site;
                        f) Accurately represents any areas of the developed site which bypass the
                            detention storage(s);




P +61 7 5211 1003           A 37 Mary St, Noosaville Qld 4566      E [email protected]      recorconsulting.com

Page 3

                       g) Accurately represents the existing catchment and flows reporting to the
                          proposed discharge point from the site, as the comparison for the
                          developed-site discharge; and
                       h) Provides existing and developed catchment plans, showing the above areas

            The drainage network and detention storage has been redesigned for the site to address
            the points raised. Pre and post development catchment plans have been prepared to
            represent the site catchments flows to each element of the drainage system, external
            catchments conveyed through the site and areas bypassing the site detention systems.

            As the pre-development site drainage flows into private property rather than the legal
            point of discharge, there is currently no predevelopment peak flow from the development
            into the legal drainage point for the site to achieve. Rather, the proposed development
            has been modelled to demonstrate that there is sufficient capacity within the internal
            drainage network at the discharge point and in the table drain along Pearl Street. This
            takes into account the upstream and downstream catchments draining to the table drain,
            to determine the maximum discharge rates from the development with minimal impacts
            to upstream or downstream properties for storms up to the 1% AEP. Please refer to the
            updated Stormwater Engineering Report for details.

                    6. Please provide MUSIC modelling and updated engineering plans which
                    demonstrate compliance with PO6 and AO6.2 of the Water Quality and Drainage
                    Code.

            The site and the treatment train proposed for the development has been modelled in
            MUSIC in accordance with the Water by Design MUSIC Modelling Guidelines for
            Southeast Queensland. The results demonstrate that the site achieves compliance with
            PO6 and AO6.2, being reductions in excess of 90% of gross pollutants, 80% of total
            suspended solids, 60% total phosphorous and 45% total nitrogen at the discharge point.
            Please refer to the updated Stormwater Engineering Report for further details.

                    7. Is the1200x600 grated inlet outside POD B a sag gully (this is unclear due to
                    limited design levels)? If it is a sag, demonstrate that the minimum 300mm
                    freeboard required by AS3500 to the adjacent building floor levels is achieved.

            This pit has been removed, however pits in the driveway area are on grade, and within the
            bioretention areas, a minimum of 300mm freeboard to the adjacent building floor levels is
            achieved.

                    8. Provide calculations/HGL analysis demonstrating that the surcharge pit outlet
                    from the
                    site will not surcharge the upstream pits during the design event due to the limited
                    grade.

            A hydraulic analysis of the proposed stormwater drainage design has been undertaken
            for the critical 1% AEP storm event, which demonstrates that there is no surcharge . Please
            refer to the updated Stormwater Engineering Report for details of the HGL analysis.




P +61 7 5211 1003           A 37 Mary St, Noosaville Qld 4566    E [email protected]       recorconsulting.com

Page 4

                    9. Please provide a subsequent plan detailing the proposed footpath, kerb and
                    channel, vehicle crossover (demonstrating compliant grades are achieved to
                    prevent water from flowing into the driveway from the street), any verge reshaping
                    works and tie in details to the existing pavement and surrounding features in
                    accordance with Councils/relevant standards.

            The Roads and Drainage Layout plan has been updated to include additional information
            to detail the requested aspects. The driveway grades have been adjusted to ensure a
            minimum 250mm elevation above the invert of the kerb and gutter to prevent water
            entering the driveway from the street, and tie in details and surface levels have been
            provided.


            We believe the revised design meets the requirements of the RFI and should further
            information be required please contact this office.

            Yours faithfully,
            RECOR Pty Ltd


            SIGNATURE




            Josh Overell
            Director
            BEng (Hons) MIEAust CPEng NER APEC Engineer IntPE(Aus) RPEQ




P +61 7 5211 1003           A 37 Mary St, Noosaville Qld 4566   E [email protected]      recorconsulting.com

Page 5

                                                                                                                                                                                                  OP WORKS
THE BELVEDERE ON PEARL                                                                                                                                                                                    ISSUE


5 PEARL STREET, COOROY QLD 4562
CIVIL WORKS


 NOTE:                                                                    6.   THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND
                                                                               SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN
 THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS                ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES
 BEFORE                                                                        CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO
 ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PROVIDE        IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL
 A                                                                             DIRECTION PRIOR TO COMMENCING CIVIL WORKS.

 MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD     7.   ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL
 THE                                                                           BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS,
                                                                               CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD
 CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE              PAVEMENTS.
 RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO      8.   CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO
 THE                                                                           AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR
 SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE                    REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION
 RE-INSPECTED WITH                                                             OF INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL.

 ALL REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR.                     9.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL
                                                                               WORKPLACE HEALTH AND SAFETY REQUIREMENTS.
 a.   PRESTART
                                                                          10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE                         SITE BOUNDARY
 b.   EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT       PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,
      AND EROSION CONTROL MEASURES UNSUITABLE GROUND                          CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES
 c.   SIDE AND CUT OFF DRAINS                                                 NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND
                                                                              INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION
 d.   STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL                       EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
 e.   STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT            11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
 f.   STORMWATER STRUCTURE BASE SLABS                                         THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
                                                                              WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
 g.   SEWER RETICULATION
                                                                          12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL
 h.   WATER RETICULATION                                                      CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT
 i.   PAVEMENT SUBGRADE                                                       REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO
                                                                              NOTE COUNCILS ADAC REQUIREMENTS.
 j.   PAVEMENT REINFORCING
                                                                          13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT
 k.   PAVEMENT PRIOR TO SEALING (PRESEAL)                                     APPROVALS.
 l.   RETAINING WALL FOOTING REINFORCING                                  14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,
 m.   RETAINING WALL BLOCKWORK PRIOR TO CORE FILL                             LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL
                                                                              CONSTRUCTION.
 n.   STEEL REINFORCEMENT OF CONCRETE STRUCTURES
                                                                          15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION
 o.   PRACTICAL COMPLETION                                                    WORKS COMMENCING ON SITE.
 p.   ON MAINTENANCE                                                      16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS
 q.   OFF MAINTENANCE                                                         AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.

 r.   ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER           17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING
      DEVELOPMENT APPROVAL)                                                   PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT
                                                                              OF ANY WORKS ON SITE.
 s.   ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE
                                                                          18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED
      RELEVANT TO THEIR CERTIFICATION SCHEME
                                                                              IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO
                                                                                                                                                   LOCALITY PLAN
                                                                              ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND            NOT TO SCALE
 GENERAL NOTES                                                                BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH
                                                                              ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE
 1.   ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.              AS DIRECTED.
 2.   ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.    19. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING
      CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY               CONSULTANTS/CONTRACTORS DRAWINGS:                                                                     02/07/21   ISSUED FOR OPW                -    MVP
      SETOUT THE WORKS.                                                                                                                                                              DATE              REVISION             MARK CHK
                                                                                     SURVEYOR:     SKYLINE SURVEYORS
 3.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT                                                                                                                        PROJECT ENGINEER
                                                                                     ARCHITECT:    ZEST BUILDING GROUP
      SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE
      CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT                      HYDRAULICS:   TBC
      GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED
      STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.                                    STRUCTURAL:   RECOR

 4.   SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF                  LANDSCAPE:    ZEST BUILDING DESIGN
      THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND       20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:
      LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT            ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS
      THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR.         WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS                                        E [email protected]
                                                                              ASSOCIATED WITH IMPLEMENTATION OF THE TMP.
 5.   EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS                                                                                                                  A 37 MARY ST NOOSAVILLE, QLD
      SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS      21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH THE FOLLOWING                                             P +61 7 5211 1003
      TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND                    LOCAL AUTHORITY APPROVALS: T.B.A
      COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE                                                                                                             CLIENT
      CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF        22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW
      ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY          APPROVALS BY COUNCIL.                                                                                   VIVIDO
      DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT.              23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE                                             PROJECT
      CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING            BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF
      PROPOSED WORKS.                                                         THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD                                           THE BELVEDERE ON PEARL
                                                                              RESERVE, PARKS/OPENSPACE, EASEMENTS.
                                                                                                                                                                                      5 PEARL STREET, COOROY
                                                                          24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION
                                                                              DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.
                                                                                                                                                                                    TITLE
                                                                          25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN
                                                                              ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND                                            COVER SHEET AND
                                                                              CONSTRUCTION CODE (2013).
                                                                                                                                                                                      LOCALITY PLAN

                                                                                                                                                                                    PROJECT NO.      DRAWING NO.   STATUS

                                                                                                                                                                                       21011           C01         OPW
                                                                                                                                                                                    DRAWN            DESIGNED      SCALE         ISSUE

                                                                                                                                                                                        MVP            BRP           1:200        A

Page 6

                                                                                                                                                                                                                                         OP WORKS
                                                                                                                                                                                                                                                  ISSUE
NOTE:
1.   FOR GENERAL NOTES REFER DWG No. C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR
     TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.                                                                                                                                                                                    LEGEND
2.   THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING FEATURES OF THIS                                                                                                                                                                FIRE HYDRANT
     SITE AND ENSURE ANY ADDITIONAL WORKS NOT SHOWN ON THIS PLAN ARE INCLUDED IN THE                                                                                                                                                              SIGN
     CONTRACT.                                                                                                                                                                                                                                    PALM TREE
                                                                                                                                                                                                                                                  TREE
3.   CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE PRIOR TO
                                                                                                                                                                                                                                                  WATER METER
     COMMENCEMENT OF WORKS.
                                                                                                                                                                                                                                                  SURVEY STN
4.   CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR TO ANY DEMOLITION WORKS                                                                                                                                                                  PERMANENT SURVEY MARK
     COMMENCING ON SITE.                                                                                                                                                                                                                          POWER POLE
5.   SERVICES ON NEIGHBOURS DEVELOPMENTS SHOWN AS EXISTING AS ASSUMED WILL BE                                                                                                                                                                     STREET LIGHT
                                                                                                                                                                                                                                                  ELECTRICITY MARKER
     CONSTRUCTED PRIOR TO COMMENCEMENT OF WORKS.
                                                                                                                                                                                                                                                  ELECTRICITY PILLAR
6.   ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED AND REMOVED                                                                                                                                                                  TELECOMMUNICATIONS MARKER
     FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION CLEARING PLAN (BY OTHERS) OR                                                                                                                                                                GAS LINE MARKER
     IF SCHEDULED STOCKPILE FOR USE BY LANDSCAPER. REFER VEGETATION CLEARING PERMIT                                                                                                                                                               WATER LINE MARKER
     FOR DETAILS.                                                                             EXISTING POWER CONNECTION TO BE                                                                                                                     STORMWATER M/H
                                                                                              REMOVED. REMOVAL AND ANY                                                                                                                            WATER VALVE
7.   CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE SUITABLE                                                                                                                                                                        SEWER MANHOLE
                                                                                              REPLACEMENT REQUIRED TO BE ARRANGED
     ARRANGEMENTS TO HAVE DISCONNECTED.                                                                                                                                                                                                           TRAFFIC LIGHTS
                                                                                              BY SITE SUPERINTEND
8.   PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE                                                                                                                                                                   TRAFFIC SIGNAL CONTROL BOX
     CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT WORKS                                                                                                                                                                    TELSTRA PIT
     CAN COMMENCE.                                                                                                                                                                                                                                STORM WATER
                                                                                                                                      EXISTING BUILDING TO
9.   CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND                                                                                                                                                                     SEWER MAIN
                                                                                                                                      BE DEMOLISHED AND
     COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.                                                             REMOVED OFFSITE                                                                                             GAS MAIN
10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS AND SERVICES                                                                                                                                                                   WATER MAIN
    WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
                                                                                                                                                                                                                                                  COMMUNICATION CABLES
                                                                                                                                                                                                                                                  TELSTRA CONDUIT
                                                                                                                                                                                                                                                  ELECTRICITY
             NOTE:                                                                                                                                                                                                                                SITE BOUNDARY
             EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN
             DRAWINGS, ALL IN-GROUND SERVICES WITHIN THE PROPERTY
             BOUNDARY INCLUDING BUT NOT LIMITED TO: STORMWATER
             DRAINAGE,    SEWERAGE,   WATER,    GAS,  ELECTRICAL  AND
             COMMUNICATIONS TO BE SAFELY BE DISCONNECTED, REMOVED
             FROM SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR TO                                                               EXISTING BUILDING TO
             ARRANGE ALL NECESSARY APPLICATIONS AND PERMITS WITH THE                               EXISTING DRIVEWAY
                                                                                                   TO BE DEMOLISHED                 BE DEMOLISHED AND
             RELEVANT    AUTHORITIES.  SERVICES   TO   BE CAPPED IN                                                                 REMOVED OFFSITE
             ACCORDANCE      WITH     RELEVANT     SERVICE   PROVIDER
             SPECIFICATIONS AND STANDARD DETAILS




                                                                                       EXISTING DRIVEWAY TO
                                                                                       BE DEMOLISHED AND                                                     EXISTING BUILDING TO
                                                                                       AREA MADE GOOD                                                        BE DEMOLISHED AND      EXISTING WATER TANLK
                                                                                                                                                             REMOVED OFFSITE        TO BE DEMOLISHED
                                                                                                                                                                                    AND
                                                                                                                                                                                    REMOVED OFFSITE




                                                                                                                                                                                     EXISTING POWER CONNECTION TO BE
                                                                                                                                                                                     REMOVED. REMOVAL AND ANY
                                                                                                                                                                                     REPLACEMENT REQUIRED TO BE ARRANGED
                                                                                                                                                                                     BY SITE SUPERINTENDENT




                                                                                                                                                                                                                           02/07/21   ISSUED FOR OPW                      -    MVP
                                                                                                                                                                                                                            DATE              REVISION                   MARK CHK
                                                                                                                               EXISTING DRIVEWAY TO BE                                                                     PROJECT ENGINEER
                                                                                                                               DEMOLISHED AND REPLACED
                                                                                                                               WITH NEW FULL SITE
                                                                                                                               FRONTAGE. REFER TO DWG
                                                                                                                               C30 FOR DETAILS




                                                                                                                                                                                                                            E [email protected]
                                                                                                                                                                                                                            A 37 MARY ST NOOSAVILLE, QLD
                                                                                                                                                                                                                            P +61 7 5211 1003
                                                                                                                                                                                                                           CLIENT

                                                                                                                                                                                                                             VIVIDO
                                                                                                                                                                                                                           PROJECT

                                                                                                                                                                                                                              THE BELVEDERE ON PEARL
                                                                                                                                                                                                                              5 PEARL STREET, COOROY
                                                                                                                                                                                                                           TITLE

                                                                                                                                                                                                                             EXISTING FEATURES
                                                                                                                                                                                                                             LAYOUT PLAN

                                                                                                                                                                                                                           PROJECT NO.      DRAWING NO.         STATUS

                                                                                                                                                                                                                              21011         C02                 OPW
                                                                                                                                                                                                                           DRAWN            DESIGNED            SCALE         ISSUE

                                                                                                                                                                                                                               MVP            BRP                 1:200        A

Page 7

SEDIMENT RELEASE GUIDELINES
1.   ALL RELEASES OF STORMWATER CAPTURED ONSITE, UNLESS OTHERWISE
                                                                          FIELD INLET
                                                                          15. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION REFER TO
                                                                                                                                                                       OP WORKS
     NOTED IN THIS STANDARD, MUST NOT EXCEED THE FOLLOWING LIMITS:
                                                                              INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST                                 ISSUE
                                                                              PRACTICES STANDARD DRAWING ESC-02 GRATED STORMWATER (FIELD)
  1.1.   50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A MAXIMUM
                                                                              INLET SEDIMENT TRAP.
         CONCENTRATION;
  1.2.   TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE BACKGROUND;
                                                                          OPERATION AND MAINTENANCE
  1.3.   pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT WHERE, AND TO
         THE EXTENT THAT, THE NATURAL RECEIVING WATERS LIE OUTSIDE THIS
                                                                          16. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC MEASURES SHALL BE                             LEGEND
                                                                              INSPECTED:
         RANGE.
                                                                              · AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) OR WEEKLY (WHEN
2. THE CONCENTRATION OF TSS RELEASED BY DEWATERING MAY ONLY                                                                                                                       CONSTRUCTION ENTRY/EXIT
                                                                                 WORK IS NOT OCCURRING ON SITE)
     EXCEED 50mg/L WHERE IT CAN BE DEMONSTRATED AND SUPPORTED                                                                                                                     SHAKEDOWN AREA
                                                                              · WITHIN 24 HOURS OF EXPECTED RAIN; AND
     THROUGH DOCUMENTATION THAT:
                                                                              · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF SUFFICIENT
  2.1.   FURTHER SIGNIFICANT RAINFALL IS FORECAST TO OCCUR BEFORE THE                                                                                                             SEDIMENT FENCE
                                                                                 INTENSITY AND DURATION TO MOBILISE SEDIMENT ON SITE).
         TSS CONCENTRATION IS LIKELY TO BE REDUCED TO 50mg/L;                                                                                                                     (INDICATIVE LOCATION)
                                                                          17. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF ESC
  2.2.   RELEASING A HIGHER CONCENTRATION OF TOTAL SUSPENDED SOLIDS
                                                                              MEASURES SHALL OCCUR IN ACCORDANCE WITH THE FOLLOWING TABLE:
         WILL RESULT IN A BETTER ENVIRONMENTAL OUTCOME BY PROVIDING
         STORAGE FOR THE CAPTURE AND TREATMENT OF RUN-OFF FROM THE
         IMMINENT RAINFALL AND RUN-OFF.                                                           MAINTENANCE SCHEDULE
  2.3.   ALL REASONABLE AND PRACTICABLE STEPS HAVE BEEN TAKEN TO               ESC MEASURES           MAINTENANCE TRIGGER
                                                                                                                              TIMEFRAME FOR COMPLETION
                                                                                                                                   OF MAINTENANCE
         TREAT THE WATER WITHIN BEST-PRACTICE TIME FRAMES;
  2.4.   FLOCCULENT HAS BEEN APPROPRIATELY APPLIED AND THE
         CONCENTRATION OF TSS IN THE CAPTURED WATER HAS ALREADY
         SIGNIFICANTLY DECREASED.
3. FOR ALL OTHER STORMWATER RELEASES, FLOWS AND DISCHARGES FROM
     THE SITE, THE RELEASE LIMIT PRESCRIBED IN (1a) ABOVE MUST NOT BE     REPORTING
     EXCEEDED UNLESS THE DEVELOPMENT IS IN FULL COMPLIANCE WITH THIS      18. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC MAINTENANCE
     STANDARD.                                                                AND CONTROL OF ALL STAGES OF WORK FOR APPROVAL BY THE
                                                                              SUPERINTENDENT.
NOTE:     IT IS RECOMMENDED THAT A SITE-SPECIFIC RELATIONSHIP BETWEEN
TURBIDITY AND SUSPENDED SOLIDS IS DETERMINED FOR EACH SEDIMENT BASIN.
ONCE A CORRELATION BETWEEN SUSPENDED SOLIDS AND TURBIDITY HAS BEEN        NOTES
ESTABLISHED FOR A SEDIMENT BASIN, TESTING STORMWATER FOR COMPLIANCE
WITH RELEASE LIMITS, PRIOR TO RELEASE, CAN BE DONE ON SITE WITH A         1.   CONTRACTOR TO PROVIDE FINAL ESC DESIGN TO SUIT
TURBIDITY TUBE OR CALIBRATED TURBIDITY METER. THIS HAS THE ADVANTAGE           PROPOSED CONSTRUCTION METHODOLOGY
OF PROVIDING IMMEDIATE ASSESSMENT TO JUSTIFY A RELEASE RATHER THAN        2.   ALL DISTURBED SURFACES TO BE LANDSCAPED IN
WAITING FOR LABORATORY RESULTS TO CONFIRM CONCENTRATION LEVELS                 ACCORDANCE WITH LANDSCAPE CONSULTANTS DRAWINGS
AND COMPLIANCE. NOTE THAT     POST-RELEASE TSS VALIDATION IS              3.   CONCRETE WASHOUT TO NOT BE UNDERTAKEN ON SITE, OR
APPROPRIATE TO DEMONSTRATE THAT THE NTU/TSS CORRELATION IS BEING               TO BE UNDERTAKEN ON A DESIGNATED LOCATION.
MAINTAINED.                                                                    CONTRACTOR TO ESTABLISH CONCRETE WASHOUT AS PER
                                                                               IECA GUIDELINES.
SEDIMENT CONTROL
1.   ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN ACCORDANCE
     WITH INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA
     GUIDELINES AND THE SPECIFICATIONS.
2.   SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM
     REQUIREMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL
     ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY THROUGHOUT
     CONSTRUCTION.
3.   THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL
     DEVICES IN A FUNCTIONAL ORDER AND REPLACE ALL BLOCKED SEDIMENT
     DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF WORKS.
4.   CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE
     SATISFACTION OF THE SUPERINTENDENT. SHALL BE COMPLETED AND
     EFFECTIVE PRIOR TO:
     a. STRIPPING OF TOPSOIL AND GRASS.
     b. BULK EARTHWORKS TO THE SITE.
     c. SERVICES INSTALLATION.
     d. PAVEMENT CONSTRUCTION
5.   ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL
     INSTRUCTION IS RECEIVED IN WRITING FROM THE SUPERINTENDENT TO
     REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS.
6.   THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE
     READ IN CONJUNCTION WITH THE APPROVED DRAWINGS.
7.   PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE
     OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION OF THE SITE
     ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE MAINTAINED
     THROUGHOUT THE CONSTRUCTION PERIOD.
8.   IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO BE
     DIFFERENT OR FAILED IN SERVICE, CORRECTIVE ACTION IS TO BE                  SEDIMENT AND EROSION CONTROL:
     UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS' ADDITIONS              CONTRACTOR TO ALLOW FOR PROVISION OF ALL
     TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH                        REQUIRED SEDIMENT AND EROSION CONTROL
     AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED                  DEVICES IN ACCORDANCE WITH IECA AND NOOSA
     NECESSARY AND RELEVANT.                                                     COUNCIL POLICIES AND GUIDELINES

9.   OVERALL
     a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED
        AROUND THE WORK SITE WHERE POSSIBLE.
     b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED
        AND BE OPERATIONAL BEFORE COMMENCING UP-SLOPE EARTHWORKS.
     c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED
        SURFACES TO BE EITHER MULCHED, COVERED WITH EROSION CONTROL
        BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED
        FOR MORE THAN 14 DAYS.

SEDIMENT FENCE                                                                                                                                           02/07/21   ISSUED FOR OPW                        -    MVP
10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER TO
                                                                                                                                                          DATE              REVISION                MARK CHK
    INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
    PRACTICES STANDARD DRAWINGS SF-01 AND SF-02 SEDIMENT FENCE.                                                                                          PROJECT ENGINEER

TEMPORARY CONSTRUCTION ENTRY/EXIT
11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND SPECIFICATION
    REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA
    (IECA) BEST PRACTICES STANDARD DRAWINGS EXIT-01 AND EXIT-02
    CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION SITES ONLY), EXIT-03 -
    ROCK PADS FOR BUILDING SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION
    EXIT - VIBRATION GRID.

KERB INLET
12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION REFER TO
                                                                                                                                                          E [email protected]
    INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST                                                                                     A 37 MARY ST NOOSAVILLE, QLD
    PRACTICES STANDARD DRAWING ESC-03 KERB INLET SEDIMENT TRAPS
                                                                                                                                                          P +61 7 5211 1003
CHECK DAMS
13. FOR CHECK DAM STANDARD DETAIL AND SPECIFICATION REFER TO                                                                                             CLIENT
    INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
    PRACTICES STANDARD DRAWING RCD-01 CHECK DAMS.                                                                                                          VIVIDO
REVEGETATION                                                                                                                                             PROJECT
14. FOR REVEGETATION STANDARD SPECIFICATION REFER TO INTERNATIONAL
    EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES                                                                                           THE BELVEDERE ON PEARL
    STANDARD DRAWING R-01 REVEGETATION GENERAL.
                                                                                                                                                            5 PEARL STREET, COOROY
                                                                                                                                                         TITLE

                                                                                                                                                           EROSION AND SEDIMENT
                                                                                                                                                           CONTROL PLAN

                                                                                                                                                         PROJECT NO.      DRAWING NO.      STATUS

                                                                                                                                                            21011         C10               OPW
                                                                                                                                                         DRAWN            DESIGNED          SCALE             ISSUE

                                                                                                                                                             MVP            BRP                1:200           A

Page 8

EARTHWORKS NOTES                                                                        OP WORKS
1.  FOR GENERAL NOTES REFER DWG C01, WHICH IS TO BE REQUESTED AND                                ISSUE
    VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
2. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM
    OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE AND
    STOCKPILED FOR FUTURE USE AS NON-STRUCTURAL FILL IF REQUIRED, OR
    REMOVE FROM SITE.
                                                                                           LEGEND
3. WHERE SITE TOPSOIL IS TO BE RESPREAD ON SITE, CONTRACTOR TO
    ALLOW TO SCREEN THE TOPSOIL OF ALL UNSUITABLE AND OVERSIZED                                  PROPOSED 1m MAX. HEIGHT
    MATERIAL. ALL UNSUITABLE MATERIAL GENERATED FROM SCREENING TO BE                             RETAINING WALL
    REMOVED FROM SITE AT CONTRACTORS EXPENSE.
                                                                                                 FINISHED SURFACE LEVEL
4. CONTRACTOR TO ALLOW FOR ALL COSTS ASSOCIATED WITH ROCK
    EXCAVATION WITHIN CONTRACT RATES.                                                            PROPOSED CUT
5. COMPACT THE EXPOSED SUBGRADE OR LOOSE TOP LEVEL MATERIAL TO A                                 EARTHWORKS
    MINIMUM 98% STANDARD MAXIMUM DRY DENSITY TO AS1289 5.1.1. ANY 'SOFT
    SPOTS' IDENTIFIED BY THE PROOF ROLLING SHALL BE REMOVED AND                                  PROPOSED FILL EARTHWORKS
    REPLACED WITH A COMPACTED IMPORTED GENERAL FILL MATERIAL TO THE
    ABOVE COMPACTION REQUIREMENTS.
6. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED
    WHERE NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED
    GENERAL FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL FREE OF
    ORGANIC MATTER AND STONES GREATER THAN 150mm AND CAPABLE OF
    BEING COMPACTED INTO COHERENT FILLING TO THE SPECIFIED STANDARD.
    THE MATERIAL SHALL HAVE A LINEAR SHRINKAGE NOT GREATER THAN 8%
    AND A MINIMUM C.B.R. OF 10%.
7. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE
    PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF
    RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN
    CUT.
8. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION
    OF RETAINING WALL COLOUR AND FINISH.
9. ALL RETAINING WALL STRUCTURAL DESIGN AND CONSTRUCTION
    CERTIFICATION BY MANUFACTURER / INSTALLER.
10. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2' SOIL
    ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF AS 3798.
    THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE
    CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN
    CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS
    AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE WITH A MINIMUM
    150KPA BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES.
11. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO
    98% STANDARD MAXIMUM DRY DENSITY (AS 1289 5.1.1) IN LAYERS NOT
    EXCEEDING 150MM COMPACTED THICKNESS.
12. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE
    CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN
    CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS.
13. CONTRACTOR TO UNDERTAKE ALL EARTHWORKS TESTING TO COMPLY WITH
    THE PROJECT SPECIFICATION AND LOCAL AUTHORITY REQUIREMENTS.
14. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN
    ACCORDANCE WITH LANDSCAPE DRAWINGS.
15. FINISHED EARTHWORKS SURFACES TO BE STABILISED
16. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE
    CONTENT.
17. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING.
18. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED
    MANAGEMENT PLANS.
19. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE
    INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT FENCE ETC.
20. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR
    RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER RELEVANT
    AUSTRALIAN STANDARDS AND LEGISLATION.
21. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON
    UNPAVED ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT
    LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS
    ARE TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL
    TO RESTRICT DUST MOVEMENT.
22. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS
    DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN
    CONFIRMATION THAT WORKS CAN COMMENCE.
23. ALL BATTERS TO BE KEYED/STEPPED INTO EXISTING MATERIAL AS DIRECTED
    BY GEOTECHNICAL ENGINEER. CONTRACTOR TO ALLOW FOR ALL
    KEYING/STEPPING AS REQUIRED.
24. ALL TEMPORARY AND FINAL BATTER SLOPES ARE TO BE INSPECTED AND
    APPROVED BY GEOTECHNICAL ENGINEER. CERTIFICATION OF LONG TERM
    STABILITY TO BE PROVIDED BY GEOTECHNICAL ENGINEER PRIOR TO
    PRACTICAL COMPLETION.
25. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ALL
    CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES ON THE
    SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF
    SAFETY GREATER THAN OR EQUAL TO 1.5 AGAINST GEOTECHNICAL
    FAILURES.
26. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE
    OF TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING DRAWINGS FOR
    BUILDING SLAB THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR
    DRAINAGE FOR DETERMINATION OF REQUIRED BULK EARTHWORKS
    SURFACE.
                                                                          02/07/21   ISSUED FOR OPW                  -     MVP
27. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE
    OF 100mm TOPSOIL LAYER.                                                DATE              REVISION              MARK CHK
28. FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL             PROJECT ENGINEER
    INVESTIGATION REPORT. IT IS RECOMMENDED THAT THE GEOTECHNICAL
    CONSULTANT BE CONTACTED TO CONFIRM THE SOIL CONDITIONS PRIOR TO
    EARTHWORKS COMMENCING.
29. WHERE NOMINATED ON THE PROJECT DRAWINGS, PRELOADING IS TO
    OCCUR IN ACCORDANCE WITH THE PROJECT DRAWINGS, PROJECT
    SPECIFICATION AND GEOTECHNICAL REPORT. CONTRACTOR TO ALLOW FOR
    THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE
    THE PRELOADING OPERATIONS. CONTRACTOR TO ALLOW TO INSTALL
    SETTLEMENT PLATES AT LOCATIONS NOMINATED BY THE GEOTECHNICAL
    ENGINEER AND ALLOW FOR WEEKLY MONITORING AND REPORTING BY
    SURVEY. PRELOAD IS NOT TO BE REMOVED UNTIL DIRECTED BY THE             E [email protected]
    SUPERINTENDENT.                                                        A 37 MARY ST NOOSAVILLE, QLD
30. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
                                                                           P +61 7 5211 1003
                                                                          CLIENT

                                                                            VIVIDO
                                                                          PROJECT

                                                                             THE BELVEDERE ON PEARL
                                                                             5 PEARL STREET, COOROY
                                                                          TITLE

                                                                            SITE EARTHWORKS PLAN


                                                                          PROJECT NO.      DRAWING NO.    STATUS

                                                                             21011         C20            OPW
                                                                          DRAWN            DESIGNED       SCALE           ISSUE

                                                                              MVP            BRP             1:200         A

Page 9

ROADWORKS AND DRAINAGE NOTES                                                                                                                                                                                                                                                                                                                                                                        OP WORKS
                                                                                                                                                                                                                                                                                                                                                                                                            ISSUE
1.  REFER HYDRAULIC DRAWINGS FOR BUILDING DRAINAGE DETAILS.
2.  ALL ROADWORKS AND DRAINAGE (EXTERNAL TO SITE BOUNDARIES AND/OR COUNCIL OWNED DRAINAGE
    PIPES INTERNAL TO THE SITE BOUNDARIES) CONSTRUCTION AND TESTING TO BE IN ACCORDANCE WITH
    NOOSA SHIRE COUNCIL DEVELOPMENT GUIDELINES, DRAWINGS AND SPECIFICATIONS.
3. ALL DRAINAGE CONSTRUCTION (PRIVATELY OWNED DRAINAGE LINES INTERNAL TO THE SITE BOUNDARIES)                                                                                                                                                                                                                                                                                                        LEGEND
    CONSTRUCTED AND TESTED TO BE IN ACCORDANCE WITH RELEVANT AUSTRALIAN STANDARDS.
4. DRAINAGE PITS TO BE PROVIDED WITH Ø150 STUB FOR FUTURE HYDRAULIC CONNECTION TO BE MINIMUM
                                                                                                                                                                                                                                                                                                                                                                                                            DRAINAGE PIPE
    50mm ABOVE INVERT OF PIT.
5. ALL STORMWATER DRAINAGE PIPES INTERNAL TO SITE SHALL BE MINIMUM:                                                                                                                                                                                                                                                                                                                                         FIELD INLET PIT
  a) Ø225 PP BLACKMAX OR APPROVED EQUIVALENT.
  b) Ø450 TO Ø600 PP SN8 RUBBER RING JOINTED, BLACKMAX OR APPROVED EQUIVALENT.                                                                                                                                    PROVIDE 2X5,000L SLIMLINE                           600x600 GRATED                                                                                                                        JUNCTION PIT
6. ALL STORMWATER DRAINAGE PIPES EXTERNAL TO SITE SHALL BE Ø300 AND GREATER CLASS 2 OR 3 R.C.                                                                                                                     RAINWATER ATTENUATION TANKS AS                      INLET SL: 105.87
    RUBBER RING JOINTED                                                                                                                                                                                           PER DETAIL B. OVERFLOWS TO PIT                      CLASS B GRATED LID
                                                                                                                                                                                                                  LITTER BASKET.                                                                                                                                                                            ATTENUATION TANK
7. ALL STORMWATER PIPES ARE TO BE MANUFACTURED TO RELEVANT AUSTRALIAN STANDARDS INCLUDING
    BUT NOT LIMITED TO AS4058 AND AS1992.
8. STORMWATER DRAINAGE AND STRUCTURES HAVE BEEN DESIGNED FOR OPERATIONAL LOADS ONLY.                                                                                                                                                                                                                                                                                                            1
                                                                                                                                                                                                                                                                                                                                                                                                A           SW PIT ID
    CONTRACTOR TO CONSIDER CONSTRUCTION LOADINGS AND ENSURE NO EXCESSIVE LOADS ARE PLACED
                                                                                                                                                                                     PROVIDE 5,000L SLIMLINE RAINWATER                                           1
    ON STORMWATER DRAINAGE OR STRUCTURES.                                                                                                                                                                                                                        C
9. ALL PRECAST END STRUCTURES TO BE CONSTRUCTED WITH REINFORCED CONCRETE END WALL.                                                                                                   ATTENUATION TANK AS PER DETAIL B.
                                                                                                                                                                                                                                                                                                                                                                                                            BIORETENTION AREA
10. CONTRACTOR TO CONFIRM LOCATION AND LEVEL OF EXISTING STORMWATER DRAINAGE WHERE                                                                                                   OVERFLOWS DIRECTED TO BIOGARDEN
    CONNECTING ON TO EXISTING.                                                                                                                                                                                                                                                                                 300mm PP PIPE                 12.5m² BIORETENTION AREA.
11. CONTRACTOR TO NOTIFY THE SUPERINTENDENT OF ANY UNSUITABLE FOUNDING MATERIAL WITHIN                                                                                                                                                                                                                         USIL: 104.81                                                                                 EXISTING ROAD
                                                                                                                                                                                                                                                                                                                                             650MM FILTER MEDIA
    DRAINAGE TRENCH OR STORMWATER STRUCTURES AND AWAIT DIRECTION PRIOR TO LAYING OF PIPES.                                                                                                                                         600x600 GRATED                                  1080Ø JUNCTION PIT          DSIL: 104.72                  150MM EXTENDED DETENTION DEPTH
12. TRENCH BACKFILL UNDER PAVEMENT TO BE COMPACTED TO 100% STANDARD DRY DENSITY (AS1289 5.1.1)                                                                                                                                     INLET SL: 105.87                                MANHOLE COVER               LENGTH: 13.57m                                                                               PROPOSED 2.0m WIDE
                                                                                                                                                                                                                                                                                                                                             REFER TO DETAIL A.
    IN LAYERS NOT EXCEEDING 150mm OF CBR 15 MATERIAL OR APPROVED EQUIVALENT. TRENCH BACKFILL IN                                 12.5m² BIORETENTION AREA.                                                                          CLASS B GRATED LID                              SL: 105.83                  GRADE: 0.6%                                                                                  FOOTPATH
    ROADS TO BE MINIMUM CBR15 MATERIAL UP TO ROAD SUBGRADE LEVEL.                                                               400MM FILTER MEDIA                                                                                                                                 CLASS B GRATED LID
13. ALL STORMWATER GRATES/LIDS WITHIN TRAFFICABLE AREAS TO BE CLASS "D" IN ACCORDANCE WITH                                      100MM EXTENDED DETENTION DEPTH                                                                                                                                                                                                                                              PROPOSED TYPE 'A'
                                                                                                                                                                                                                                                                                                                                             EXISTING 225 SEWER UNDER
    AS3996.                                                                                                                     REFER TO DETAIL A.                                                                                                                                                                                                                                                          DRIVEWAY CROSSOVER
                                                                                                                                                                                                                                                                                                                                             APPROX IL 104.05
14. ALL GRATES AND LIDS SHALL SIT FLAT WITH ITS SURROUND AND NOT BE LOOSE OR MOVE UNDER WHEEL                                                                                                                                                                                                                                                CONTRACTOR TO CONFIRM DEPTH ONSITE                             VERGE TURFED AREA. REFER
    LOADS.                                                                                                                                                    1
                                                                                                                                                                                                                                                                                                                                                                                                            ARCHITECTS PLANS.
15. ALL STORMWATER STRUCTURES TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT SPECIFICATION,                                                                     A                                                                                                                                                                       4
    AND LOCAL AUTHORITY GUIDELINES AND SPECIFICATIONS. WHERE STRUCTURES EXCEED MAXIMUM                                                                                                                                                                                                                                                A      600x600 GRATED
    DEPTH AS IDENTIFIED WITHIN STANDARD DRAWINGS THE CONTRACTOR WILL ENSURE AN ADEQUATE                                                                                                                                                                                                                                                      INLET SL: 105.60
    STRUCTURAL DESIGN IS UNDERTAKEN FOR THE SUBJECT STRUCTURE TO BE CONSTRUCTED TO.                                                                                                                                                                                                                                                          CLASS B GRATED LID                                           DESIGN SPOT HEIGHT
16. CONTRACTOR TO ENSURE ALL MANHOLE STRUCTURES COMPLY WITH THE MAXIMUM DEPTH SPECIFIED IN                                                                                                                                                                                               3
    THE PROJECT SPECIFICATION OR LOCAL AUTHORITY FROM FINISHED SURFACE LEVEL TO UNDERSIDE OF                                                                                                                                                                 2                           A
                                                                                                                                                                                                                                                             A                                                                                  TURF BLOCK PARKING AREA TO
    ROOF SLAB. ANY NON CONFORMANCE IS TO BE RECTIFIED AT THE CONTRACTORS EXPENSE.                                                                                                                                                                                                                                                               ARCHITECTURAL SPECIFICATION                                 ASPHALT DRIVEWAY
17. ALL FOOTPATHS TO BE CONSTRUCTED IN ACCORDANCE WITH ARCHITECTURAL/LANDSCAPING DRAWINGS                                                                                                                                                                                                                                                                                                                   CONCRETE EDGED
    AND RELEVANT AUTHORITY STANDARD DRAWINGS AND SPECIFICATIONS. FOOTPATHS TO BE                                                                                                                                                                                                                                                                                                                            150mm COMPACTED ROADBASE
                                                                                                                                                                                                             CONTRACTOR TO LOCATE
    CONSTRUCTED WITH MAXIMUM 2.5% CROSSFALL. SHOULD CONSTRUCTED FOOTPATHS EXCEED 2.5%                                                                                                    225mm PP PIPE                                                225mm PP PIPE                                                                                                                                         30mm AC14 WEARING COURSE
                                                                                                                                                                      600x600 GRATED                         EXISTING SEWER CONNECTION                                                                                                        PROVIDE 5,000L SLIMLINE RAINWATER
    CROSSFALL, THE CONTRACTOR WILL BE REQUIRED TO RECTIFY BY REMOVING AND REPLACING AT THEIR                                    TURF BLOCK PARKING AREA TO                               USIL: 105.12                                                 USIL: 104.93
                                                                                                                                                                      INLET SL: 105.70                       FROM ADJACENT LOT ON SITE                                                              225mm PP PIPE                             ATTENUATION TANK AS PER DETAIL B.
    COST.                                                                                                                       ARCHITECTURAL SPECIFICATION                              DSIL: 104.95                                                 DSIL: 104.83
                                                                                                                                                                      CLASS B GRATED LID                                                                                                            USIL: 104.95                              OVERFLOWS DIRECTED TO BIOGARDEN
18. WHERE A STORMWATER DRAINAGE TRENCH HAS BEEN CONSTRUCTED LONGITUDINALLY IN THE ROAD,                                                                                                  LENGTH: 31.5m                                                LENGTH: 9.10m
    THEN THE FINAL PAVEMENT SURFACE REPAIR WIDTH IS TO MATCH THE EXISTING LANE WIDTH AND                                                                                                 GRADE: 0.5%                        600x600 GRATED            GRADE: 1%                                     DSIL: 104.88
    TERMINATE 50mm CLEAR OF THE ROAD CENTERLINE OR LANE LINE LINEMARKING TO ALLOW FOR THE                                                                                                                                   INLET SL: 105.9                                                         LENGTH: 9.65m
    BITUMEN EMULSION JOINT SEAL. REINSTATEMENT OF SURFACE ADJACENT TO THE KERB OR ROAD                                                                                                                                      CLASS B GRATED LID                                                      GRADE: 0.65%                            300mm PP PIPE
    PAVEMENT EDGE TO EXTEND FULLY TO THE KERB LINE OR EDGE OF PAVEMENT.                                                                                                                                                                                                                                                                     USIL: 104.70
19. THE CONTRACTOR IS TO CONFIRM THE LOCATION OF SERVICE CONDUITS WITH THE SUPERINTENDENT                                                                                                                                                        1                                                                                          DSIL: 104.30
                                                                                                                                                                                                                                                                                           1
    PRIOR TO LAYING STORMWATER DRAINAGE. ALL TRENCH EXCAVATION AND CONSTRUCTION SHALL                                                                                                                                                            D                                                                                          LENGTH: 25.80m
                                                                                                                                                                                                                                                                                           B
    COMPLY WITH THE REQUIREMENTS OF THE QUEENSLAND WORKPLACE HEALTH AND SAFETY ACT 2011.                                                                                                                                                                                                                                                    GRADE: 1.5%
20. ROADBASE MATERIAL SHOULD BE PLACED IN LAYERS AT LEAST 75 MM THICK BUT NOT EXCEEDING 150 MM                                                                                                                                                                                                      600x600 GRATED
    IN THICKNESS, AND COMPACTED TO A MINIMUM DENSITY OF 95% OF THE MAXIMUM DRY DENSITY AS                                                                                                                                                                                                           INLET SL: 106.07
                                                                                                                                                                                                                                                        600x600 GRATED
    DETERMINED IN ACCORDANCE WITH AUSTRALIAN STANDARD AS1289.6.2.                                                                                                                                          225mm PP PIPE                                                                            CLASS B GRATED LID
                                                                                                                                                                                                                                                        INLET SL: 105.97                                                                   1200Ø JUNCTION PIT MANHOLE COVER
21. CONTRACTOR TO UNDERTAKE ROADWORKS TESTING IN ACCORDANCE WITH NOOSA SHIRE COUNCIL                                                                                                                       USIL: 105.29
                                                                                                                                                                                                                                                        GRATED LID                                                                         WITH STEP IRONS. PROVIDE WATER
    GUIDELINES, DRAWINGS AND SPECIFICATIONS.                                                                                                                                                               DSIL: 105.24
                                                                                                                                                                                                                                                                                                                                           PUMPS (MAX 64L/S) TO HYDRAULIC
22. ECOSOL LITTER BASKETS (200um filter) OR SIMILAR TO BE PROVIDED TO STORMWATER INLET PITS IN                                                                                                             LENGTH: 10.27m
                                                                                                                                                                                                                                                                                                                                           ENGINEERS SPECIFICATION.
    ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS.                                                                                                                                                          GRADE: 0.5%
                                                                                                                                                                                                                                                                                                                                           SL: 106.00
23. GRADE LANDSCAPED AND VEGETATED AREAS LOCALLY TOWARDS DRAINAGE.
                                                                                                                                                                                                                                                                                                                                           IL:103.8
                                                                                                                                                                                                    RETAINING WALL TO STRUCTURAL
                                                                                                                                                                                                    ENGINEERS SPECIFICATION
                                                                                                                                                                                                                                                  2
STANDARD SIGNS AND LINE MARKING NOTES                                                                                                                                                                                                             D
                                                                                                                                                                                                                                                                                                                                  5
                                                                                                                                                                                                                                                                                                                                          RETAINING WALL TO STRUCTURAL
1.     GENERAL                                                                                                                                                                                                                                                                                                                    A
                                                                                                                                                                                                                  225mm PP PIPE                                                                                                           ENGINEERS SPECIFICATION
  1.1.    ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH THE QUEENSLAND TRANSPORT                                                                                                                     USIL: 105.22
         MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (CURRENT EDITION).                                                                                                                                             DSIL: 104.70
2. SIGNS                                                                                                                                                                                                          LENGTH: 26.15m
  2.1.   ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS NOTED OTHERWISE.                                                                                                                           GRADE: 2%
  2.2.   SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO EDGE OF SIGN: LOCATION
         CLEARANCE NO KERB 600 BEHIND GUIDE POSTS BARRIER KERB 300 FROM FACE MOUNTABLE KERB 500
         FROM FACE OF KERB.                                                                                                                                                                                                                                                                                                                    EXISTING PROPERTY ACCESS TO BE
  2.3.   PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING TRAFFIC AT 45° TO KERB OR                                                                                                                                                                                                                                                     DEMOLISHED AND REPLACED WITH NEW
         CARRIAGEWAY EDGE. ALL OTHER SIGNS TO BE TURNED AWAY BY 5° FROM THE NORMAL TO                                                                                                                                                                                                                                                          FOOTPATH, TURF, KERB & CHANNEL FOR
          APPROACHING HEADLIGHT.                                                                                                                                                                         ACO GRATED DRAIN K2-00 /                                                                                                              FULL SITE FRONTAGE. BATTER TO MAKE
3. SIGN SUPPORTS                                                                                                                                                                                         KS2-00 OR SIMILAR. 150Ø                                                                                                               SMOOTH JOIN TO EXISTING LEVELS
  3.1.    SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS WHERE THEY ARE IN A PAVED                                                                                                               OUTLET
         SURFACE.
                                                                                                                                                                                                                                                                                                                                                       600x600 GRATED
4. LINEMARKING
                                                                                                                                                                                          2m WIDE FOOTPATH IN                                                                                                                                          INLET SL: 106.70
  4.1.   REDUNDANT LINEMARKING IS TO BE GROUND OFF.
                                                                                                                         NOTE: RAINWATER ATTENUATION TANKS TO BE INSTALLED                ACCORDANCE WITH IPWEA                                                                                                                                        CLASS B GRATED LID
  4.2.   THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.                                                                                                                                                                                                                                                       1
                                                                                                                         AS PER MANUFACTURERS SPECIFICATION AND AS PER                    STANDARD DWG RS-065. MATCH                                                                                                  E                                      300mm RCP PIPE
                                                                                                                         DETAIL. ROOF DRAINAGE TO BE FITTED WITH FIRST FLUSH              TO EXISTING LEVELS AT ENDS.
                                                                                                                                                                                                                                                                                                                                                             USIL: 106.34
                                                                                                                         DIVERTERS TO ON-SITE IRRIGATION. TANKS TO BE                                                                                                                                                                                        DSIL: 106.23
                                                                                                                         PLUMBED FOR INTERNAL AND EXTERNAL REUSE.                                                                                                                                                                                            LENGTH: 5.36m
                                                                                                                                                                                                                                                                                                                                                             GRADE: MATCH EXISTING   17/08/21   UPDATE FOR RFI                        -    MVP
                                                                                                                                                                                                                                                                                                                                                                                     02/07/21   ISSUED FOR OPW                        -    MVP
                                                                                                                                                                                                                                                                                                                                          PROVIDE M1 KERB AS PER IPWEA                DATE              REVISION                  MARK CHK
                                                                                                                                                                                                                                                                                                                                          STANDARD DWG RS-080. SAW CUT
                                                                                                                                                                                                                                                                                                                                          300mm INTO EXISTING AND MAKE               PROJECT ENGINEER
                                                                                                                                                                                                            300mm RCP PIPE                              TYPE A DRIVEWAY ENTRY IN
                                                                                                                                                                                                            USIL: 106.93                                ACCORDANCE WITH IPWEA                                                             SMOOTH JOIN. REFER DETAIL C.
                                                                                                                                                                                                            DSIL: 106.36                                STANDARD DWG RS-051.                       REMOVE EXISTING CULVERTS AND
                                                                                                                                                                                                            LENGTH: 24.59m                              250mm ABOVE KERB INVERT AT 3.5m            HEADWALLS AND REPLACE WITH NEW
                                                                                                                                                                                                            GRADE: MATCH EXISTING                                                                  MIN. Ø300 RCP AND HEADWALLS,
                                                                  DETAIL A - TYPICAL BIORETENTION GARDEN                                                                                                                                                                                           MATCHING NEATLY TO EXISTING.
                                             EXTENDED DETENTION
                                                DEPTH VARIES




                                                                        PLANTING SPECIES TO PROVIDE EFFECTIVE
     MAINTENANCE HATCH                                                  REMOVAL OF NUTRIENTS. PLANT VARIETIES                                                                                                                                                                                                                                                                         E [email protected]
     SECURE CAPPED END                                                  AND PLANTING DENSITIES TO ARCHITECTURAL
                                                                        SPECIFICATIONS                                                                                                                                                                                                                                                                                                A 37 MARY ST NOOSAVILLE, QLD
     WITH SCREWS
                                                                                                                                                                                                                                                                                                                                                                                      P +61 7 5211 1003
                 600x600 RAISED GRATE
                    FIELD INLET PIT S.L.                                                                                                                                                                                                                                                                                                                                             CLIENT
                                                                                                                                                     DETAIL B - RAINWATER ATTENUATION TANK                         ROOF DOWNPIPE CONNECTION TO                       DETAIL C - KERB AND CHANNEL TIE IN
                                                                                    1 IN 4
                                                                                             MAX
                                                                                                    EXTEND GEOFABRIC 500MM
                                                                                                                                                                                          100Ø HIGH FLOW OUTLET
                                                                                                                                                                                                                   HYDRAULIC ENGINEERS SPECIFICATIONS                                                                                       CONSTRUCT NEW M1 KERB                      VIVIDO
                                                                                                     AND PIN UNDER TOPSOIL                                                                                                                                                                                                                  AS PER IPWEA STD DWG
                                                                                                                                                                                                                                                                     SAW CUT INTO                                         300MM             RS-080                                   PROJECT
                                                                                                                                    LOW FLOW JUNCTION WITH SCREW CAP DETAIL                          5,000L SLIMLINE RAINWATER TANK                                  EXISTING SURFACE
                                                                                               SANDY LOAM FILTER MEDIA -                                      ORIFICE PLATE DISK
                                                                                                                                                              WITH 25mm ORIFICE
                                                                                                                                                                                                                                                                     AND PAVEMENT
                                                                                                                                                                                                                                                                                                                                                                  GRADE SURFACE TO
                                                                                                                                                                                                                                                                                                                                                                  MATCH TO KERB
                                                                                                                                                                                                                                                                                                                                                                                        THE BELVEDERE ON PEARL
                                                                                               DEPTH VARIES
                                                                                               (0.45MM AVERAGE PARTICLE SIZE)
                                                                                                                                                                                                               ATTENUATION VOLUME
                                                                                                                                                                                                                                                                                                                                                                                        5 PEARL STREET, COOROY
                                                                                                                                        HIGH FLOW                  TANK WALL                                         1.25KL                                                                    EXISTING SEAL
                                                                                                                                        OUTLET
                                                                                                   100MM COARSE SAND                                                                                                                                                                           EXISTING PAVEMENT                                                                     TITLE
                                                                                                   TRANSITION FILTER MEDIA
                                                                                                   (NOMINAL SIZE 0.5 - 2MM)        SCREW ON
                                                                                                                                   ACCESS CAP
                                                                                                                                                              RETENTION LEVEL
                                                                                                                                                                                                                                                                                                                                     NEW SUB-BASE COURSE                               ROADWORKS AND
                                                                                                                                                                                                            RAINWATER REUSE VOLUME
       PROVIDE
       END CAP
                                            PROVIDE SUBSOIL DRAIN AT
                                            MIN 0.5% GRADE TO PIT                   NOMINAL 200MM GRAVEL
                                                                                                                                                                                                                    3.75KL                                                                                                                                                             DRAINAGE LAYOUT PLAN
                                                                                    DRAINAGE LAYER                                                                                                                                                                                      REPLACE 150MM
                                           BIDIM A34 GEOFABRIC OR SIMILAR           (FINE AGG., NOMINAL SIZE 2 - 5MM)                    OUTLET TO        ORIFICE DISK TO BE GLUED                                                                                                      WIDE OF BASE
                                           TO BE WRAPPED AROUND                                                                          DRAINAGE         INSIDE JUNCTION. uPVC                                                                                                         COURSE MATERIAL                      150MM                           150MM
          SUBSOIL DRAIN CLEANOUT                                                                                                         NETWORK                                                                                                                                                                                                                                     PROJECT NO.      DRAWING NO.       STATUS
                                                                                                                                                          OUTLET FROM TANK TO BUTT
        (NON-SLOTTED PVC) AND 135°          WALLS AND BASE OF FILTER MEDIA                                                                                UP AGAINST ORIFICE DISK
               ELBOW CONNECTOR                                                                                                                                                                                                                                                                                                                                                          21011         C30               OPW
                                                                                                                                                                                                                                                                                                                                                                                     DRAWN            DESIGNED          SCALE             ISSUE

                                                                                                                                                                                                                                                                                                                                                                                         MVP            BRP                   1:200        B

Page 10

          EXISTING SITE CATCHMENT AREAS                                            DEVELOPED SITE CATCHMENT AREAS                                                    OP WORKS
                                                                                                                                                                              ISSUE


                                                                                                                                                                       LEGEND


                                                                                                                   C9                            C12
                                                                                                                                                                              DRAINAGE PIPE

                                                                                                                                                                              DRAINAGE PIT

                                                                                                                                                                              JUNCTION PIT

                                                                                                                                                                              BIORETENTION AREA

      C1                                                                                  C1          C2                               C3
                                                                                                                                                                              ATTENUATION TANK

                                                                                                                                                                              EXTERNAL USPTREAM
                                                                                                                                                                              CATCHMENT

                              C2                                            C6
                                                                                                                                                                              INTERNAL CATCHMENT

                                                                                                                                                                              CATCHMENT DRAINAGE
                                                                                                                         C11                                                  DIRECTION




                                                                                                                    C7

E1                                                                     E1
                                                                                                                        C4                  C5

                                                             C4
           E4                                                                        E4
                                                                                                                               C10
                                                                                                 E2
                                                C3                                                                  C8
                         E2
                                                                                                                         E5



                 E3                                               E3                                                            E6




      EXISTING CATCHMENT AREAS                                              DEVELOPMENT CATCHMENT AREAS
                                             FRACTION                                                                  FRACTION
CATCHMENT             AREA (Ha)                                         CATCHMENT               AREA (Ha)
                                          IMPERVIOUS (%)                                                            IMPERVIOUS (%)
     C1                         0.030                 50.0                   C1                            0.017               100.0
     C2                         0.166                 18.9                   C2                            0.020               100.0
                                                                                                                                                       02/07/21   ISSUED FOR OPW                      -    MVP
     C3                         0.004                100.0                   C3                            0.028               100.0                    DATE              REVISION                MARK CHK

     C4                         0.028                 18.8                   C4                            0.017               100.0
                                                                                                                                                       PROJECT ENGINEER


     E1                         0.054                 20.2                   C5                            0.017               100.0
     E2                         0.092                 20.6                   C6                            0.035                37.5
     E3                         0.058                 67.4                   C7                            0.003                 0.0
     E4                         0.020                100.0                   C8                            0.010                 0.0
                                                                                                                                                        E [email protected]
                                                                             C9                            0.019                 0.0                    A 37 MARY ST NOOSAVILLE, QLD
                                                                             C10                           0.017                70.4                    P +61 7 5211 1003
                                                                             C11                           0.037                54.7                   CLIENT

                                                                             C12                           0.008                 0.0                     VIVIDO
                                                                             E1                            0.044                20.4                   PROJECT


                                                                             E2                            0.067                29.3                      THE BELVEDERE ON PEARL
                                                                             E3                            0.037                76.9                      5 PEARL STREET, COOROY
                                                                             E4                            0.020               100.0                   TITLE

                                                                             E5                            0.033                23.1                     STORMWATER CATCHMENT
                                                                             E6                            0.028                54.9                     PLAN

                                                                                                                                                       PROJECT NO.      DRAWING NO.     STATUS

                                                                                                                                                          21011         C31             OPW
                                                                                                                                                       DRAWN            DESIGNED        SCALE             ISSUE

                                                                                                                                                           BRP            BRP                 1:200        A

Page 11

                                                                                                                                                                           OP WORKS
                                                                                                                                                                                     ISSUE




Unit 3 Parking Space             Unit 7 Parking Space         Unit 5 Parking Space
Representative of Units 1 to 4   Representative of U6 to U7




                                                                                                                                                             08/07/21   ISSUED FOR OPW                 -    BRP
                                                                                                                                                             02/07/21   ISSUED FOR OPW                 -    MVP
                                                                                                                                                              DATE              REVISION              MARK CHK
                                                                                                                                                             PROJECT ENGINEER



                                                                                     TURNING PATH NOTES
                                                                                     1.   TURNING CIRCLES SHOWN USING A B99 VEHICLE AS DEFINED BY AS2890.1
                                                                                          PARKING FACILITIES - OFF STREET CAR PARKING.
                                                                                     2.   REFER TO ARCHITECTURAL PLANS FOR FULL DETAILS OF DRIVEWAY AISLE
                                                                                          AND PARKING AREA DIMENSIONS.
                                                                                     3.   REFER TO ARCHITECTURAL PLANS FOR WHEEL STOP AND BOLLARD DETAILS     E [email protected]
                                                                                          WHERE NECESSARY
                                                                                                                                                              A 37 MARY ST NOOSAVILLE, QLD
                                                                                                                                                              P +61 7 5211 1003
                                                                                                                                                             CLIENT

                                                                                                  5.20
                                                                                                                                                               VIVIDO
                                                                                                                                                             PROJECT

                                                                                                                                                                THE BELVEDERE ON PEARL
                                                                                                    3.05   0.95
                                                                                                                                                                5 PEARL STREET, COOROY
                                                                                                B99 Vehicle (Realistic min radius) (2004)
                                                                                                Overall Length                              5.200m
                                                                                                Overall Width                               1.940m
                                                                                                Overall Body Height                         1.878m           TITLE
                                                                                                Min Body Ground Clearance                   0.272m
                                                                                                Track Width                                 1.840m
                                                                                                Lock-to-lock time
                                                                                                Curb to Curb Turning Radius
                                                                                                                                            4.00s
                                                                                                                                            6.250m
                                                                                                                                                               TURNING PATH ANALYSIS


                                                                                                                                                             PROJECT NO.      DRAWING NO.    STATUS

Unit 11 Parking Space            Visitor 1 Parking Space                                                                                                        21011          C40           OPW
Representative of U8 to U11
                                                                                                                                                             DRAWN            DESIGNED       SCALE         ISSUE

                                                                                                                                                                 MVP            BRP             NTS         B

Page 12

                                                              Department of Housing and Public Works

                                                              Form 15—Compliance certificate
                                                              for building design or
                                                              specification          Version 4 – July 2017


NOTE: This is to be used for the purposes of section 10 of the Building Act 1975 and/or section 46 of the
Building Regulation 2006.
RESTRICTION: A building certifier (class B) can only give a compliance certificate about whether building work
complies with the BCA or a provision of the Queensland Development Code (QDC). A building certifier (Class B)
can not give a certificate regarding QDC boundary clearance and site cover provisions.
1. Property description                   Street address (include no., street, suburb/locality and postcode)
This section need only be                  5 Pearl Street / 54 Elm Street
completed if details of street
address and property description           Cooroy                                                         Postcode 4563
are applicable.
E.g. in the case of                       Lot and plan details (attach list if necessary)
(standard/generic) pool design/shell       Lot 2 RP 153798 & Lot 2 RP 64750
manufacture and/or patio and
carport systems this section may          In which local government area is the land situated?
not be applicable.                         Noosa Shire Council
The description must identify all
land the subject of the application.
The lot and plan details (e.g.
SP/RP) are shown on title
documents or a rates notice.
If the plan is not registered by title,
provide previous lot and plan
details.
2. Description of                          Operational Works – Stormwater drainage, driveway design, earthworks,
   component/s certified
Clearly describe the extent of work        sediment and erosion control
covered by this certificate, e.g. all
structural aspects of the steel roof
beams.




3. Basis of certification
                                           Noosa Shire Council Planning Scheme
Detail the basis for giving the
certificate and the extent to which        AS2890.1 – Parking Facilities
tests, specifications, rules,
standards, codes of practice and other     AS3500.3 – Plumbing & Drainage - Stormwater Drainage
publications, were relied upon.
                                           AS3798 – Guidelines on Earthworks for Commercial and Residential Property
                                           Queensland Urban Drainage Manual (QUDM)
                                           International Erosion Control Association Best Practice Erosion & Sediment
                                           Control
                                           Water by design MUSIC modelling Guidelines

4. Reference documentation                 Architectural Plans (Project 21012)
Clearly identify any relevant
documentation, e.g. numbered               Operational Works drawings (C01, C02, C10, C20, C30, C31, C40)
structural engineering plans.




LOCAL GOVERNMENT USE ONLY
 Date received                                                        Reference Number/s

Page 13

5. Building certifier reference              Building certifier reference number
   number


6. Competent person details                  Name   in full
  competent person for building work,
means a person who is assessed by             Anita Steele
   e building certifier for the work as
competentto practice in an aspect of
                                             Com an name if a licable                   Contact erson
 he building and specification design,        RECOR                                          Mark Poynter
  f the building work because of the
 ndividual's skill, expenence and            Phone no. business hours) Mobile no.                    Fax no.
  ualifications in the aspect. The            07 5211 1003
    mpetentperson must also be
   gistered or licensed under a law          Email address
  pplying in the State to practice the
  spect.                                      [email protected]
 f no relevant law requires the              Postal address
individual to be licensed or registered       37 Mary Street
to be able to give the help, the certifier
   ust assess the individual as having        Noosaville                                                Postcode 4566
appropriate experience, qualifications
 r skills to be able to give the help.       Licence or registration number (ifapplicable)
 f the chief executive issues any
  uidelines for assessing a competent                          26K
person, the building certifier must use
the guidelines when assessing the
  erson.
  .Signature of competent                    Signature                                           Date
   person
 his certificate must be signed by the
ndividual assessed by the building
  rtifier as competent.



The Building Act 1975 is administered by the Department of Housing and Public Works

Page 14

a

G

STRATEGIC

STRATEGIC SOLUTIONS,
CREATIVE THINKING

rgstrategic.com.au

 

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU21.0117 OPW21.0199-Att 4 Civil Eng.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.