MCU21.0117 OPW21.0199-Att 4 Civil Eng · MCU21/0117
g) Accurately represents the existing catchment and flows reporting to the
proposed discharge point from the site, as the comparison for the
developed-site discharge; and
h) Provides existing and developed catchment plans, showing the above areas
The drainage network and detention storage has been redesigned for the site to address
the points raised. Pre and post development catchment plans have been prepared to
represent the site catchments flows to each element of the drainage system, external
catchments conveyed through the site and areas bypassing the site detention systems.
As the pre-development site drainage flows into private property rather than the legal
point of discharge, there is currently no predevelopment peak flow from the development
into the legal drainage point for the site to achieve. Rather, the proposed development
has been modelled to demonstrate that there is sufficient capacity within the internal
drainage network at the discharge point and in the table drain along Pearl Street. This
takes into account the upstream and downstream catchments draining to the table drain,
to determine the maximum discharge rates from the development with minimal impacts
to upstream or downstream properties for storms up to the 1% AEP. Please refer to the
updated Stormwater Engineering Report for details.
6. Please provide MUSIC modelling and updated engineering plans which
demonstrate compliance with PO6 and AO6.2 of the Water Quality and Drainage
Code.
The site and the treatment train proposed for the development has been modelled in
MUSIC in accordance with the Water by Design MUSIC Modelling Guidelines for
Southeast Queensland. The results demonstrate that the site achieves compliance with
PO6 and AO6.2, being reductions in excess of 90% of gross pollutants, 80% of total
suspended solids, 60% total phosphorous and 45% total nitrogen at the discharge point.
Please refer to the updated Stormwater Engineering Report for further details.
7. Is the1200x600 grated inlet outside POD B a sag gully (this is unclear due to
limited design levels)? If it is a sag, demonstrate that the minimum 300mm
freeboard required by AS3500 to the adjacent building floor levels is achieved.
This pit has been removed, however pits in the driveway area are on grade, and within the
bioretention areas, a minimum of 300mm freeboard to the adjacent building floor levels is
achieved.
8. Provide calculations/HGL analysis demonstrating that the surcharge pit outlet
from the
site will not surcharge the upstream pits during the design event due to the limited
grade.
A hydraulic analysis of the proposed stormwater drainage design has been undertaken
for the critical 1% AEP storm event, which demonstrates that there is no surcharge . Please
refer to the updated Stormwater Engineering Report for details of the HGL analysis.
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU21.0117 OPW21.0199-Att 4 Civil Eng.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.