                                                                                                                                                                                                  OP WORKS
THE BELVEDERE ON PEARL                                                                                                                                                                                    ISSUE


5 PEARL STREET, COOROY QLD 4562
CIVIL WORKS


 NOTE:                                                                    6.   THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND
                                                                               SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN
 THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS                ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES
 BEFORE                                                                        CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO
 ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PROVIDE        IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL
 A                                                                             DIRECTION PRIOR TO COMMENCING CIVIL WORKS.

 MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD     7.   ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL
 THE                                                                           BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS,
                                                                               CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD
 CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE              PAVEMENTS.
 RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO      8.   CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO
 THE                                                                           AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR
 SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE                    REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION
 RE-INSPECTED WITH                                                             OF INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL.

 ALL REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR.                     9.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL
                                                                               WORKPLACE HEALTH AND SAFETY REQUIREMENTS.
 a.   PRESTART
                                                                          10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE                         SITE BOUNDARY
 b.   EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT       PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,
      AND EROSION CONTROL MEASURES UNSUITABLE GROUND                          CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES
 c.   SIDE AND CUT OFF DRAINS                                                 NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND
                                                                              INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION
 d.   STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL                       EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
 e.   STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT            11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
 f.   STORMWATER STRUCTURE BASE SLABS                                         THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
                                                                              WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
 g.   SEWER RETICULATION
                                                                          12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL
 h.   WATER RETICULATION                                                      CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT
 i.   PAVEMENT SUBGRADE                                                       REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO
                                                                              NOTE COUNCILS ADAC REQUIREMENTS.
 j.   PAVEMENT REINFORCING
                                                                          13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT
 k.   PAVEMENT PRIOR TO SEALING (PRESEAL)                                     APPROVALS.
 l.   RETAINING WALL FOOTING REINFORCING                                  14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,
 m.   RETAINING WALL BLOCKWORK PRIOR TO CORE FILL                             LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL
                                                                              CONSTRUCTION.
 n.   STEEL REINFORCEMENT OF CONCRETE STRUCTURES
                                                                          15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION
 o.   PRACTICAL COMPLETION                                                    WORKS COMMENCING ON SITE.
 p.   ON MAINTENANCE                                                      16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS
 q.   OFF MAINTENANCE                                                         AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.

 r.   ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER           17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING
      DEVELOPMENT APPROVAL)                                                   PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT
                                                                              OF ANY WORKS ON SITE.
 s.   ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE
                                                                          18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED
      RELEVANT TO THEIR CERTIFICATION SCHEME
                                                                              IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO
                                                                                                                                                   LOCALITY PLAN
                                                                              ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND            NOT TO SCALE
 GENERAL NOTES                                                                BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH
                                                                              ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE
 1.   ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.              AS DIRECTED.
 2.   ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.    19. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING
      CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY               CONSULTANTS/CONTRACTORS DRAWINGS:                                                                     02/07/21   ISSUED FOR OPW                -    MVP
      SETOUT THE WORKS.                                                                                                                                                              DATE              REVISION             MARK CHK
                                                                                     SURVEYOR:     SKYLINE SURVEYORS
 3.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT                                                                                                                        PROJECT ENGINEER
                                                                                     ARCHITECT:    ZEST BUILDING GROUP
      SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE
      CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT                      HYDRAULICS:   TBC
      GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED
      STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.                                    STRUCTURAL:   RECOR

 4.   SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF                  LANDSCAPE:    ZEST BUILDING DESIGN
      THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND       20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:
      LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT            ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS
      THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR.         WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS                                        E [email protected]
                                                                              ASSOCIATED WITH IMPLEMENTATION OF THE TMP.
 5.   EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS                                                                                                                  A 37 MARY ST NOOSAVILLE, QLD
      SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS      21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH THE FOLLOWING                                             P +61 7 5211 1003
      TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND                    LOCAL AUTHORITY APPROVALS: T.B.A
      COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE                                                                                                             CLIENT
      CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF        22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW
      ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY          APPROVALS BY COUNCIL.                                                                                   VIVIDO
      DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT.              23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE                                             PROJECT
      CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING            BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF
      PROPOSED WORKS.                                                         THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD                                           THE BELVEDERE ON PEARL
                                                                              RESERVE, PARKS/OPENSPACE, EASEMENTS.
                                                                                                                                                                                      5 PEARL STREET, COOROY
                                                                          24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION
                                                                              DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.
                                                                                                                                                                                    TITLE
                                                                          25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN
                                                                              ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND                                            COVER SHEET AND
                                                                              CONSTRUCTION CODE (2013).
                                                                                                                                                                                      LOCALITY PLAN

                                                                                                                                                                                    PROJECT NO.      DRAWING NO.   STATUS

                                                                                                                                                                                       21011           C01         OPW
                                                                                                                                                                                    DRAWN            DESIGNED      SCALE         ISSUE

                                                                                                                                                                                        MVP            BRP           1:200        A

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU21.0117 OPW21.0199-Att 4 Civil Eng.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.