SWMP Technical Memo Climate Change as submitted with Further Advice response
ENGINEERING & PROJECT SERVICES
Sunshine Coast | Brisbane
www.recor.au | ABN 89 647 469 707
3. Relationship to the submitted SWMP
The SWMP established the lawful point of discharge to Council's network in Myall Street, adopted DRAINS
for final hydrologic and hydraulic assessment, and proposed a 75 kL OSD tank with dual discharge controls.
The values below provide the relevant basis from SWMP sections 3.3, 4.5, 4.6 and 7.2.
Table 1 - Submitted SWMP design basis
Item Value SWMP reference
Main detention tank 75.00 kL SWMP section 7.2 / Drawing C054
Submitted 1% AEP storage 74.53 m3 SWMP Table 4-2
Submitted 1% AEP water depth 1.49 m SWMP Table 4-2
Lower discharge control 170 mm at RL 116.84 SWMP Table 4-2
Secondary discharge control 245 mm at RL 117.84 SWMP Table 4-2
Outlet pipe DN375 RCP SWMP Table 4-2
Pre-development / mitigated; SWMP Table 4-
Submitted 1% AEP flow 0.179 / 0.161 m3/s
3
4. Model amendments
4.1 Climate-adjusted 1% AEP rainfall
The BoM IFD file issued 11 June 2026 for latitude -26.41952122 and longitude 152.9095387 was duplicated
as a dedicated climate scenario. Every rainfall depth in the 1% AEP column was multiplied by 1.20; all other
AEP columns were retained unchanged. The revised file was imported into DRAINS and the 1% AEP
ensemble was analysed across the relevant durations and temporal patterns.
Table 2 - Representative climate-adjusted 1% AEP rainfall depths
Duration BoM 1% AEP depth (mm) Climate-adjusted depth (mm)
5 min 26.30 31.56
10 min 41.20 49.44
15 min 52.00 62.40
20 min 60.80 72.96
25 min 68.30 81.96
30 min 74.90 89.88
45 min 91.50 109.80
4.2 ILSAX soil classification
The ILSAX soil parameter was revised from Soil Type 3 to Soil Type 2. Soil Type 2 corresponds generally to
Hydrologic Soil Group B and represents sandy or sandy-loam soils with moderate infiltration. This better
reflects the sandy character of the site while remaining conservative relative to a Soil Type 1 clean, deep
sand assumption by allowing for fines, construction disturbance and compaction within developed
P0478-26-001 | Cooroy Social Housing | RFI Item 4 Page 2 of 6