Original source · versioned page text
Compiled Approved Plans OPW21 0250
Plans and drawings: the text below has words only, no drawings.
Very large file (15.1 MB): may take a few minutes to open.
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
STRUCTURE
2
2
91 2 3k om
be
‘Scale Vert 1100 ~ AT(1200 ~ A3}
0 $1520 25m
Scale Horz 1500 - AT (T1000 - A3)
OQ
NOOSA COUNCIL
APPROVED PLAN
150mm iL 104.778 - |
jane S 5 3] 5 | s
STRUCTURE ° ® 2 y
DESCRIPTION s/s =| [2 ze Ze
NI
PRECAST HEADWALL
GRATED PIT
1/3
4/)
00 CLASSD
GRATED PIT
Ah
6/1
GRATED KERB INLET PIT
GRATED KERB INLET PIT
Tom NTEL
TR UNTEL
S| 8 S| os
5 5 g @
PW21/0250 21 JAN 2022 e g
1ZE (mm) 2 Pa ‘a 21 25 tsa
LASS PC 7 t ae ae He
PIPE GRADE (%} 158% 507% 30% oon osx
BIPE SLOPE Thin XI a ‘e oH Bao ae
FULL PIPE VELOCITY {m/s} es ie 092 00 age
PART FULL VELOCITY {m/s} te ov ser ae is
DATUM RL 93.0 89.0 88.0
one 028s ote 0.000 ons
PIPE
FLOW = a «= » - < = & * =| a S = = s . x
umecky STRUCTURE 5 3 3 3 3 3g 2 z 3 Z| 5 : 3 g z a gl
HYDRAULIC GRADE LEVEL fg a8 eB 38 ee i 2 3 ae e ae BE aE Ee 32
DEPTH TO INVERT 2 ag alg 3 als al ge e alg g sls 4 gals ge 3/8
INVERT LEVEL 2 giz 3 g/5 als als 5 ES gz - alg a 3/8 8 ie als
OF DRAIN z |e B23 3/3 ais Ss eB s/s 5 Eee IS =
DESIGN 2 z s 3 3 g S s 2 z = 3 S 3 s g 2
SURFACE 2/2 ole lB aE ole |B 7 eZ mr & Is 3 5 lz
SETOUT 3 a/ 5 Sle SIE BB SIE 3 al SIE 5 EB SIE 5 ale
CAODDINATE z 25 z aie Sie 35 SIE é Sie SE E eas E 22
CHAINAGE s s am 2 5 3080 : 3 3 e 3} ans = 2 3] cus 3] a0 8
DATUM AMD:
MAX WATTERSON
ean | Pero
2 [praar_[ saver araova 16 [si on
fovea [issuer nscsson 6 16
| OnTE REVISIONS oY
Te] on soon SeHAit oF Bax ENCINEERING Pr,
VANTRALIA PTY LTD
BAX
coving
2 PEARSONS ROAD
COOROY QLD 4563
STORMWATER DRAINAGE
LONGITUDINAL SECTION
SHEET 1 OF 2
PLAN No |160-001-403 [eeusion] B Jat
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.