MCU21 0041 Approved Plans
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn APPROVED PLAN
2.75 MCU21/0041
NOOSA COUNCIL
3.0
0
8 JUNE 2022
2.75
3.00
3.2
5 3.25 3.00
R.P. DESCRIPTION
0"
21' 2
Lot 1 on R.P. 107647
Local Government : Noosa Shire Council
3.5 3.50
2 80°
0 3.25
Locality : COOROIBAH
Area : 1.415 ha 4m
97.06 3.75
3.7 3.50
5
4.00 3.75
4.0
0 4.00
ROOF BRACING
DP1 Roof bracing to comply with
4.25 truss manufacturers specification.
4.50 ROOF SHEETING
5°
4.25
DP1 (2) Custom Orb
DP1
GUTTERS
Colorbond Lysaght Quad 175
5.0
DP1 0 Colorbond Lysaght Half Round 150
5°
SHWS
SS
STORMWATER DRAINAGE
1. DP1 - 150Ø to 100Ø reducer to 100Ø downpipes to
Proposed AES Septic 5° 4. stormwater pipes / rainwater tanks as illustrated.
75
Approx. size and location 100mm min. cover. 1 in 100 min. fall.
5
4.2 Downpipe diameter based on eaves gutters
4.50 with a gradient of 1:500 or steeper.
5.2 2. DP2 - 100Ø downpipes to stormwater pipes /
5 rainwater tanks as illustrated.
5°
DP1 100mm min. cover. 1 in 100 min. fall.
Downpipe diameter based on eaves gutters
with a gradient of 1:500 or steeper.
DP2 (2) 3. Stormwater pipes to overflow to
approved rubble pit & overland flow path.
Line to prevent scouring if required to
approval of building certifier.
4. All stormwater drainage shall be in accordance
with A.S. 3500.3.
5.0
0 5. All stormwater drainage shall be in accordance
with N.S.C. guidelines to minimise erosion
and scouring. Stormwater flow other than
4.75 5.
50 natural overland flow shall not be discharged
onto neighbouring property.
5.
75
6. Provide overflows to eaves gutters (rear flashing/
TO LAKEWAY DRIVE gap to fascia) in accordance with AS 3500.3.
6.
4.50 00 7. All stormwater drainage design is preliminary
6.
25 and shall be confirmed by a licenced hydraulics
designer.
SCHEDULE OF ABBREVIATIONS
Existing Water Tank. SS : 5.94kW PV Solar Power System installed to manufacturers
SITE PLAN - ROOF DRAINAGE details.
5.
Approx. size and location
25
SHWS : Roof top Solar Hot Water System installed to manufacturers
Scale 1 : 200 details. Collector & Tank on roof.
AK B U I L D I N G D E S I G N
Dean White & Vivienne Savill Working Drawings REV D A3
DATE: 18/05/2022
© Copyright 2 Lakeway Dr. DRAWING No:
T. 07 5443 4200 E. [email protected]
A. Suite 9/50 Aerodrome Rd Maroochydore
QBCC 1060583 ABN 95 621 039 731
P.O. Box 116 Cotton Tree Qld 4558 Cooroibah 20138A / 202
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.