WP1323 - Working Near Overhead and Underground Electric Lines
Attached to the e-mail MCU16/0081 - Energex advice agency response - 28 Eenie Creek Road Noosaville.
Electricity Entity Requirements:
Working Near Overhead and Underground Electric Lines
Removal or replacement of LV service fuse to permit work on consumers’ mains, installation
switchboard, consumer’s terminals or eliminate an exclusion that would exist requires the
Electrical Mechanic to hold a current Queensland Electrical Mechanic Licence and perform the
work in accordance with their documented safe system of work.
NOTE: It is not permissible to replace a blown LV service fuse(s) after loss of supply
to consumer’s installation or to alter Electricity Entity LV aerial services.
4.5. Contacting Electricity Entity for Safety Advice or Authorised Person Enquiries
By phone
call Electricity Entity on General Enquiries phone number (refer page 3).
By email
Energex: [email protected] or [email protected]
Ergon Energy: [email protected]
Website
Energex: https://www.energex.com.au/safety/safety-around-the-network
Ergon Energy: https://www.ergon.com.au/network/safety/business-safety/the-outdoor-
workplace/working-near-powerlines
5. OVERHEAD ELECTRIC LINES
The following table sets out preparatory work options that may be required to be performed by
the Electricity Entity (or electrical contractor where identified as being permitted who is an
Authorised Person - Electrical) to assist a person, worker or PCBU in minimising the electrical
safety risks of, encroaching within the exclusion zone or, contact with electric lines.
Category of work Description Costing arrangement
Safety Base information Provide Safety Advice Nil cost to customer
Advice
LV Service 1. Isolation carried out by No involvement by the
Isolation of overhead or underground service by
isolation customer’s electrical Electricity Entity.
removal of the service fuse(s).
contractor May be a cost charged by
(Preferred option to isolate supply and eliminate
the customer’s electrical
the exclusion zone).
contractor.
2. Isolation carried out by Customer requested isolation of overhead or
Electricity Entity underground service by removal of the service
fuse(s);
Cost to customer.
or
Customer requested physical disconnection and
reconnection of overhead or underground service.
Insulation 3. Verification of Verification of insulation integrity to classify as
integrity insulation integrity to insulated service – Insulation integrity can only be
verification reduce exclusion zone verified at the time of inspection – visual
to no exclusion zone inspection is required before confirmation in all
prescribed e.g. no cases. When service insulation integrity verified - Cost to customer.
contact permitted no exclusion zone prescribed e.g. no contact
permitted.
This can be performed by an Electrical Contractor
who is also an Authorised Person (Electrical).
Check this is the latest version before use. Page 9of30 EGX WP1323 Ver 2
9 June 2015 EE BS001405R107 Ver 2
Joint Reference Document between Energex and Ergon Energy
Energex Limited ABN 40 078 849 055 Ergon Energy Corporation Limited ABN 50 087 646 062