WP1323 - Working Near Overhead and Underground Electric Lines
Attached to the e-mail MCU16/0081 - Energex advice agency response - 28 Eenie Creek Road Noosaville.
Electricity Entity Requirements:
Working Near Overhead and Underground Electric Lines
6. UNDERGROUND ELECTRICAL ASSETS
6.1. Responsibilities When Working in the Vicinity of Electricity Entity Underground
Electrical Assets
Everyone has a legal “Duty of Care” that must be observed when working in the vicinity of
underground electrical assets which includes underground cables, conduits and other
associated underground equipment. When discharging this “Duty of Care” in relation to
Electricity Entity underground electrical assets, the following points must be considered:
1. It is the responsibility of the architect, consulting Engineer, developer, and principal
contractor in the project planning stages to design for minimal impact and protection of
Electricity Entity underground electrical assets. The Electricity Entity will provide plans on
request via DBYD showing the presence of the underground electrical assets to assist at
this design stage.
2. It is the constructor’s responsibility to:
(a) Anticipate and request DBYD plans of Electricity Entity underground electrical
assets for a particular location at a reasonable time before earthworks begins.
(b) Visually locate Electricity Entity underground electrical assets by use of an
electronic cable locator followed by careful non-mechanical excavation (potholing
using hydrovac or hand tools) when earthworks activities may damage or interfere
with Electricity Entity plant.
(c) After completion of steps (a) and (b) above, if there is a risk of the Electricity Entity
underground electrical assets being damaged or its structural integrity compromised
by your planned earthworks activities, contact the Electricity Entity (General
Enquiries phone number – refer page 3) for further advice.
A constructor may include but not limited to designer, project manager, installer, contractor, civil
contractor.
3. The alignments and boundaries contained within DBYD plans and maps will sometimes
differ from present alignments and boundaries “on the ground”. Accordingly, in every
case, the constructor should obtain confirmation of the actual position of Electricity Entity
cables and pipelines under the road ways by non-mechanical excavation (potholing using
hydrovac or hand tools) when earthworks activities may damage or interfere with
Electricity Entity underground electrical assets. In no case should the constructor rely on
statements of third parties in relation to the position of Electricity Entity underground
electrical assets.
6.2. Conditions of Supply of Information
Plans and details of Electricity Entity underground electrical assets provided by DBYD are
only current for 4 weeks from the date of dispatch and should not be referred to after this
period, if you go past this time, please re-apply to DBYD as underground services may
have been updated.
The Electricity Entity agrees to provide plans if an Electricity
Entity underground electrical assets location request is made to
Dial Before You Dig (DBYD) by phone on Freecall “1100”, online
at www.1100.com.au or the free iPhone Application, only on the
basis that at least 2 business day notice is given and the DBYD
applicant agrees to the terms of this agreement.
Check this is the latest version before use. Page 16of30 EGX WP1323 Ver 2
9 June 2015 EE BS001405R107 Ver 2
Joint Reference Document between Energex and Ergon Energy
Energex Limited ABN 40 078 849 055 Ergon Energy Corporation Limited ABN 50 087 646 062