Original source · versioned page text
architecturals
Very large file (65.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
MATERIALS AND FINISHES
CODE DESCRIPTION FINISH FT3 2m Powdercoated Aluminium Screen XXXX
AWN1 Awning/Heka Hood Powder Coated Aluminium Surfmist PV1 Feature Driveway Entry Eco Outdoor Beauford Crazy Pave
AWN2 Awning/Heka Hood Powder Coated Aluminium Surfmist RN1 Render - Finecote Resene Black White
BAL2 Stainless steel and Clear glass balustrade Pre-finished RN2 Render - Finecote with Sawcuts Concrete Look
BAL3 Stainless steel and Frosted glass balustrade Pre-finished RN3 Render - Finecote with Sawcuts To Match Surfmist
BAL4 Solid Balustrade; stud with external sheeting Birch RN4 Render - Finecote over Hardies Easylap Resene Black White
CLD1 Hardies Oblique XXXX RN5 Render - Finecote with Sawcuts over Hardies Easylap Concrete Look
CLD2 External Feature Walls - Territory Panel Limed RS1 LYSAGHT Longline 305 Colorbond Surfmist
EA CONC Driveway; Exposed Aggregate Concrete Silver Frost SCN1 Aluminium Batten Screen - angled Powder Coated Aluminium Surfmist
EG1 Eaves Gutter Stratco Colorbond Surfmist SF1 Soffit lining Resene Black White
EG2 Custom Profile Eaves Gutter Colorbond Surfmist SF2 Concrete finish Pre-finished
FF1 External Tile Paradise Stone Ivory SF3 Soffit lining - Territory Panel Limed
FT1 2m High Perimeter Fencing Timber Pailing Resene Black White
FT2 1.4m Screen above Rendered Blockwork XXXX
FT3 2m Powdercoated Aluminium Screen XXXX
4.2 3.2 2.2 1.2 A.2 B.2 C.2 D.2 E.2 F.2 G.2
8M HEIGHT LIMIT UNIT 201 & 205 UNIT 202 & 206 UNIT 203 & 207 7,466 TOWNHOUSE 209
TOWNHOUSE 209 8M HEIGHT LIMIT
RS1 RS1
CLD2 CLD2
AWN1 AWN2 AWN2 AWN1 AWN1
2400 WINDOW & RN2 RN2 RN2 RN2 AWN1
W.01 W.02 W.02 W.01 W.03 W.01 W.01 W.01
DOOR HEAD HEIGHT
EG1 TERRACE TERRACE TERRACE TERRACE
RS1
AD.04 AD.05 AD.04 AD.05
EG1 CLD2 EG1 UPPER LEVEL
CLD2 RN4 BAL3 BAL3 RN4
FFL+15.470 CLD2 BAL3
BAL3 2400 WINDOW &
2400 WINDOW &
W.11 DOOR HEAD HEIGHT
DOOR HEAD HEIGHT
AWN1 RN1 RN1
RN1 RN1 RN1
W.05 2400 WINDOW & RN1 RN1 SHS SHS
SHS AD.04 SHS RN4 AD.06
UPPER LEVEL DOOR HEAD HEIGHT
CL TERRACE TERRACE CL CL TERRACE TERRACE CL W.07 W.07 UPPER LEVEL
FFL+13.420 BAL3 BAL3 FFL+13.440
SCN3 SCN3
GROUND LEVEL
FFL+12.500 AC AC AC AC RN4 CLD2 RN1
W.04 AD.04 AD.05 W.04 W.04 AD.04 AD.05 W.04
2400 WINDOW & 2400 WINDOW &
W.11 RN1 RN1 NATURAL GROUND
DOOR HEAD HEIGHT DOOR HEAD HEIGHT
RN1 FINISHED GROUND
CL
GROUND LEVEL GROUND LEVEL
AC NATURAL GROUND FENCE SHOWN DASHED
FFL+10.320 AD.07 AD.07 AD.01 AD.10 FFL+10.340
FINISHED DRIVEWAY
FINISHED DRIVEWAY
FINISHED GROUND
NATURAL GROUND
N BUILDING 2 ELEVATION E BUILDING 2 ELEVATION
- Scale 1:100 - Scale 1:100
1.2 2.2 3.2 4.2
G.2 F.2 E.2 D.2 C.2 B.2 A.2
8M HEIGHT LIMIT
UNIT 201 & 205
8M HEIGHT LIMIT 9,610 UNIT 204 & 208 7,405 7,375 7,487
RS1
EG1 EG1 EG1
RS1 CLD2 RS1 EG1 CLD2
RN2 CLD2 EG1
AWN1 AWN2 AWN2 AWN1
AWN1 AWN1
2400 WINDOW & 2400 WINDOW &
W.01 RN2 W.02 W.02 W.01 W.03 W.03 W.03 SCN1 W.03
DOOR HEAD HEIGHT SCN1 SCN1 SCN1 DOOR HEAD HEIGHT
EG1
RS1 AD.01 AD.02 AD.01 AD.02
AD.01 EG1
UPPER LEVEL CLD2 UPPER LEVEL
BAL3
BAL2 FFL+15.470 BAL3 FFL+15.470
2400 WINDOW & Bal3 RS1 EG1 RS1 EG1 Bal3
RN4
DOOR HEAD HEIGHT BALCONY BALCONY
AWN1 AWN2 AWN2 AWN1
AWN1
RN2 RN1 2400 WINDOW & 2400 WINDOW &
W.01 W.02 W.02 W.01 W.05 AD.07 W.03 STORAGE W.03 W.03 STORAGE W.03
DOOR HEAD HEIGHT UPPER LEVEL DOOR HEAD HEIGHT
BAL3 BAL3 RN1 AD.01 RN1
FFL+13.440 AD.02
CLD2 AD.02 AD.01
MP
FH FH GROUND LEVEL RN1 RN1 RN1 RN1 GROUND LEVEL
FFL+12.500 RN1 FFL+12.500
2400 WINDOW &
DOOR HEAD HEIGHT CL
NATURAL GROUND FINISHED DRIVEWAY
RN1
NATURAL GROUND GROUND LEVEL W.05
FFL+10.340 AC W.05 W.05
FINISHED DRIVEWAY AD.01
FINISHED GROUND
S BUILDING 2 ELEVATION
- Scale 1:100
W BUILDING 2 ELEVATION
- Scale 1:100
Notes:
B L A C K Project: Drawing Title: Project No. Drawn By Drawing No.
Rev Date Description Use figured dimensions in preference to scale. Contact information:
1. These drawings represent a concept design for preliminary cost analysis (MAY 2023) and are NOT FOR CONSTRUCTION E 12/07/2023 Issued for Consultant Coordination All dimensions to be varified and checked on
F 14/07/2023 Issued for Development Application site. These designs, drawings, specifications
PO Box 781 Tewantin Q 4565 79 - 83 Eumundi Noosa Road B2 - ELEVATIONS 202327 PT WD.2.06
2. The drawings and diagrams provided herewith are NOT FOR CONSTRUCTION OR BUILDING APPROVAL and to be used for preliminary D&C tendering only. Architect Registration # 5386 QLD
and the copyright thereof are the property of For CAPITAL PRUDENTIAL
Structure & Services coordination has not been undertaken.
I
J
18/08/2023
5/10/2023
D&C TENDER ISSUE
RFI SUBMISSION
Blackwood and must not be used, retained or W O O D Ph: 0416 037 424
[email protected] 79 - 83 EUMUNDI NOOSA ROAD & 26 Scale Date Project Stage Revision
copied without the written authority of
Blackwood. a r c h i t e c t u r e & d e s i g n www.blackwoodarchitecture.com.au HEADLAND DRIVE, NOOSAVILLE QLD 4566 1:100, 1:1 @ A1 5/10/2023 Concept J
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.