Original source · versioned page text
12. OBoat Hire - Noosa Plan Codes
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance outcomes Acceptable Outcomes Comments
Building Design and streetscape
PO23 Complies:
Development maximises and No acceptable outcome provided
protects valued vistas and view The redevelopment proposes
lines to waterways, mountains, fixed jetty components replaced
natural features or pleasing by pontoon units which float up
architectural or landscape and down with the tidal
features in the location. changes. This will improve the
visual amenity on the waterway.
In addition, the secure mooring
of the hire vessels will provide
for a more “ordered” facility
rather than vessels being tied to
any portion of jetty available.
PO24 Not applicable:
Existing significant trees are No acceptable outcome provided
incorporated into building design The redevelopment will not
and complemented by additional involve any disturbance to
endemic vegetation. vegetation.
PO25 Not applicable:
Development for the purpose of No acceptable outcome provided
a community use or sport and The redevelopment is not for
recreation is located, designed community use or sport and
and operated to be responsive to recreation of this nature.
the sub-tropical climate and
make the most of natural light,
ventilation and on site rainwater
capture and reuse.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.