Original source · versioned page text
12. OBoat Hire - Noosa Plan Codes
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance Outcomes Acceptable Outcomes
Access & Connectivity
through traffic around and
bypassing Noosaville.
PO30 AO30
Development integrates with Development on land including
and extends the existing street or adjoining a key
and pathway networks including pedestrian/cycle link shown
but not limited to those in Figure 7.2.4.4 (Noosaville
identified on Figure 7.2.4.4 Framework and Character
(Noosaville Framework and plan) and Figure 7.2.4.5 (Noosa
Character plan) and Figure Business Centre Framework and
7.2.4.5 (Noosa Business Centre Character plan) facilitates these
Framework and Character connections.
plan) such that connections to
and between key local
destinations are provided and
reinforced.
Performance Outcomes Acceptable Outcomes
Environment, natural resources and recreation
PO31 AO31
Connecting Habitat Areas as
Development has no significant identified on Map SFM-4 -
adverse effects on biodiversity, Biodiversity (Strategic
natural vegetation, native fauna Framework) are protected from
habitat, landscape quality, water fragmentation and
quality or cultural heritage encroachment by development.
values, including those related
to—
(a) changes to natural drainage;
(b) disturbance to any wetland
system;
(c) management of fire risk;
(d) erosion and the transport of
sediments off site;
(e) unmanaged public access;
(f) changes to fauna habitat
and behaviour.
PO32 AO32
Open space corridors identified
Development maintains and as Ecological Linkages and Major
protects an integrated open Recreation areas on Map SFM-1
space network throughout the - Settlement and Map SFM-4 -
locality to— Biodiversity (Strategic
(a) provide for both passive and Framework) are enhanced and
active recreational pursuits; protected from fragmentation
(b) provide connectivity for and encroachment by
pedestrians and cyclists;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.