Original source · versioned page text
12. OBoat Hire - Noosa Plan Codes
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance Outcomes Acceptable Outcomes Comments
Character, amenity & access - prescribed tidal works outside Noosa Waters Estate
(e) cluttering of waterways is prolongation of the The proposed works will improve
avoided; boundaries; the amenity of the area from both
the land and the waterway. The
(f) public access to beaches and (ii) are not more than 1.2 vessels will be moored in an
foreshores is not impeded, metres in width; and orderly fashion and contained
including the pocket sandy within the boundaries of the lease
beaches and other (iii) have no head and are
area.
foreshores along the Noosa located such that when
River; a vessel is berthed, it
does not encroach over (d) Complies:
(g) excessive traffic volumes the prolongation of a
within foreshore areas and boundary (Refer Figure The proposed works are contained
adjoining lands are avoided; 9.4.9.3B). within the seabed lease
boundaries, the area for which has
(h) materials blend with the been approved for “maritime
natural surrounds; and AO9.3 facility”. The use in the
surrounding water and adjoining
(i) they reflect the character and For lots that adjoin those described
lands will not be affected.
setting of the immediate in AO9.2, a jetty or pontoon is
surrounds of the locality. located well away from the common
boundary. (e) Complies:
The proposed works are contained
within the seabed lease
boundaries. The works will allow
for a more ordered berthing
arrangement reducing the “ad-hoc”
arrangement necessary to safely
store the vessels.
(f) Complies:
The proposed works will take place
within the existing seabed lease
area so public access to the beach
and foreshore in this area remains
unaffected.
(g) Complies:
The existing traffic volume will not
increase as a result of the proposal.
The redevelopment relates only to
providing safer mooring of and
safe access to the existing hire
vessels.
(h) Complies:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.