12. OBoat Hire - Noosa Plan Codes

Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance Outcomes              Acceptable Outcomes                  Comments
Design, Construction and Safety for jetties, wharves and pontoons - prescribed tidal works outside
Noosa Waters Estate
(c) conflicts with uses on the                                      (a) Complies:
    foreshore and adjoining lands; AO13.4
                                                                    The proposed works are contained
    and                            A pontoon head has a maximum
                                                                    within the seabed lease boundaries.
                                   width of 3 metres and a maximum
(d) unacceptable risks to personal length of 5 metres (Refer Figure The works will allow for a more
    and public safety.                                              ordered berthing arrangement
                                   9.4.9.3C).
                                                                    reducing the “ad-hoc” arrangement
                                                                    necessary to safely store the
                                   AO13.5
                                                                    vessels.
                                   For “Y” and “T” shaped jetty
                                   heads—                           (b) Complies:

                                                                       The existing traffic volume will not
                                  (a) a maximum area 10.5m²            increase as a result of the proposal.
                                      excluding any walkway is         The redevelopment relates only to
                                      provided; and                    providing safer mooring of and
                                                                       safe access to the existing hire
                                  (b) a walkway with a minimum         vessels.
                                      length of 3 metres is
                                      provided (Refer Figure           (c) Complies:
                                      9.4.9.3D).
                                                                     The proposed works are contained
                                                                     within the seabed lease boundaries,
                                  AO13.6                             the area for which has been
                                  Gangways and walkways serving      approved for “maritime facility”.
                                                                     The use in the surrounding water
                                  jetties and pontoons have at least
                                                                     and adjoining lands will not be
                                  one rigid handrail fitted and meet
                                                                     affected.
                                  the following—
                                                                     (d) Complies:

                                  (a) for dwelling houses – a      The whole purpose of the
                                      minimum width of             redevelopment is to improve safety
                                      750 millimetres and a        to all users at the facility. The
                                      maximum width of 1.5 metres; vessels will be more securely
                                                                   moored and the pontoon fingers
                                  (b) for other residential uses – will allow a safer access into the
                                                                   vessels for all users.

                                          (i) the gangway for a        Proposed access walkways have an
                                              single berth pontoon     internal width of 1.2m and have
                                              has a minimum width      handrails both sides. The concrete
                                              of 900 millimetres;      surface of the pontoon fingers will
                                                                       have a “coarse broomed finish” to
                                          (ii) the gangway for a
                                                                       ensure non-slip finish.
                                               multiple berth
                                               pontoon has a
                                               minimum width of 1.2
                                               metres if fitted with
                                               one handrail and 900
                                               millimetres if fitted
Log in to download the original file

12. OBoat Hire - Noosa Plan Codes.pdf · 477 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.