Delegated Report - Code - Planning - OPW26 0058 (As Published)

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                   Real property description:       Lot 6 RP 216711

                   Planning Scheme:                 Noosa Plan 2020 (20 March 2026)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Operational Works - Vehicle Crossover
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.

                            Plan No.            Rev.     Plan/Document Name                          Date

                            S24-043-SW01        -        Preliminary Stormwater Management Plan April 2024
                                                         Sheet 1 of 2, prepared by Westera Partners
                                                         Annotated by Council

                            S24-043-SW02        -        Preliminary Stormwater Management Plan July 2022
                                                         Sheet 2 of 2, prepared by Westera Partners
                                                         Annotated by Council

               CURRENCY PERIOD
               2.      The Currency Period for this development approval lapses if the development has not
                       substantially started by, unless an application to extend the currency period is approved by
                       Council.
               SITE SPECIFIC CONDITIONS
                       Bonds
               3.      A site control and/or compliance bond of $5,000 is to be submitted to Council prior to the pre-
                       start meeting. The pre-start meeting will only be held once Council's Construction
                       Engineering Officer has confirmation that the bond monies have been received by Council.
                       The bond will be refunded less any costs incurred by Council in ensuring compliance with
                       these conditions or any additional inspections incurred for substandard work or work
                       undertaken not in accordance with this permit.
               4.      Bonds must:
                       a.      have approval of the bond calculations and amount from Council prior to lodgement
                       b.      be lodged with Council and accompanied by the Bond Administration Fee/s.
                       c.      be requested for release by writing to Council, when relevant approval requirements
                               have been met.




                                                                                                         Page 4 of 8

Document Set ID: 24831825
Version: 4, Version Date: 20/07/2026


[OCR of page images]
Real property description: | Lot 6 RP 216711
Planning Scheme: Noosa Plan 2020 (20 March 2026)

2. DECISION DETAILS

Council decided to issue the following type of approval:

e Development Permit for Operational Works - Vehicle Crossover

3. CURRENCY PERIOD OF APPROVAL

The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS

APPROVED PLANS

1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.

Plan No. Rev. Plan/Document Name Date
$24-043-SW01 - Preliminary Stormwater Management Plan | April 2024
Sheet 1 of 2, prepared by Westera Partners
Annotated by Council
$24-043-SW02 - Preliminary Stormwater Management Plan | July 2022
Sheet 2 of 2, prepared by Westera Partners
Annotated by Council

CURRENCY PERIOD

2. | The Currency Period for this development approval lapses if the development has not
substantially started by, unless an application to extend the currency period is approved by
Council.

SITE SPECIFIC CONDITIONS
Bonds

3. Asite control and/or compliance bond of $5,000 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.

The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.

4. Bonds must:
a. have approval of the bond calculations and amount from Council prior to lodgement
b. be lodged with Council and accompanied by the Bond Administration Fee/s.

Cc. be requested for release by writing to Council, when relevant approval requirements
have been met.

Page 4 of 8

Document Set ID: 24831825
Version: 4, Version Date: 20/07/2026
Log in to download the original file

Delegated Report - Code - Planning - OPW26 0058 (As Published).pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.