Skip to the record
The gold standard in government transparency.

Council archive · source document

20180333 - Letter from Engineer · OPW18/0264

Attached to the e-mail Operational Works Application OPW18/0264.

of 1

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

le ESTERA
PARTNERS

 

Our Ref: Pl:cr $18-003Ltr01 Westera Partners Pty Ltd
Brisbane Office

P 07 38524333
13 August 2018

JW Constructions (Qld) Pty Ltd
PO Box 178
PEREGIAN BEACH QLD 4573

Attention: Jason Warren
Email: [email protected]
Dear Sir

RE: PROPOSED TEMPORARY SHEET PILING RETENTION SYSTEM AT
24 ARAKOON CRESCENT, SUNSHINE BEACH

This is to confirm that we have been commissioned as the Structural Engineers on this project and we
have reviewed the drawings provided by Meso Design Pty Ltd for the temporary sheet pile retention
system, Drawing numbers SH100 to SH107 Revision A dated 03.08.2018.

We are satisfied that the design addresses the temporary retention requirements of the project and that
the system is compatible with the structural elements of the building.

Should you require further information in this regard, please do not hesitate to contact me at the Brisbane
office.

Ve Ide BE (Hons) | RPEQ 5319

Director | Structural Project Engineer
Westera Partners Pty Ltd

SUNSHINE COAST BRISBANE GOLD COAST NORTHERN NSW

 

P:02 6674 8047 F;

    

Used in these records

About this file

File size
406 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20180333 - Letter from Engineer.PDF · 406 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.