Council archive · source document
20180333 - Letter from Engineer · OPW18/0264
Attached to the e-mail Operational Works Application OPW18/0264.
le ESTERA PARTNERS Our Ref: Pl:cr $18-003Ltr01 Westera Partners Pty Ltd Brisbane Office P 07 38524333 13 August 2018 JW Constructions (Qld) Pty Ltd PO Box 178 PEREGIAN BEACH QLD 4573 Attention: Jason Warren Email: [email protected] Dear Sir RE: PROPOSED TEMPORARY SHEET PILING RETENTION SYSTEM AT 24 ARAKOON CRESCENT, SUNSHINE BEACH This is to confirm that we have been commissioned as the Structural Engineers on this project and we have reviewed the drawings provided by Meso Design Pty Ltd for the temporary sheet pile retention system, Drawing numbers SH100 to SH107 Revision A dated 03.08.2018. We are satisfied that the design addresses the temporary retention requirements of the project and that the system is compatible with the structural elements of the building. Should you require further information in this regard, please do not hesitate to contact me at the Brisbane office. Ve Ide BE (Hons) | RPEQ 5319 Director | Structural Project Engineer Westera Partners Pty Ltd SUNSHINE COAST BRISBANE GOLD COAST NORTHERN NSW P:02 6674 8047 F;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20180333 - Letter from Engineer.PDFRelated documentApplication case desk ↗
About this file
- File size
- 406 KB (small file)
- File type
No other editions are linked here.