NOOSA COUNCIL
APPROVED PLAN
OPW17/0123.01 10 OCT 2017
[OCR of page images]
}
a |
I
I
Scctss
re"""
SS SS
|
,
|
(-_\ KEY PLAN
\e J Scale 1:1000 @ A1
VA. ra
i
AN
‘VEGETATION TO BE
RETAINED - ANY CLEARING
‘OF THIS AREA WILL BE
SUBJECT TO SEPARATE OPW
APPLICATION
Wwe!
Ail
|
VEGETATION TO BE
Ke AINED - ANY CLEARING
‘OF THIS AREA WILL BE
SUBJECT TO SEPARATE OPW
‘APPLICATION,
VEGETATION TO BE
RETAINED - ANY CLEARING
(OF THIS AREA WILL BE
SUBJECT TO SEPARATE OPW
[APPLICATION
= |
al
. mM
Hp Hl |
/ I
ZB
|
ii
“ian
ia
ee ee oP
VMO0O7
!
|
Ve
Fix barrier mesh
with at least two
wire ties to each
picket.
SINGLE TREE
Protective fence to be
installed. Refer Note 1. If —_—r
there is inadequate space
ot for this fence, refer to PLAN VIEW
2 Drawing B in this detail. Wrap trunk with low- .
z| grade geotextile fabric. =
Oo
S &
a 3mm thickness €
wire ties. Fix to 8
batten with 2 N
MULTIPLE TREES _heavy duty
oa Kane Heres
T battens.
Star pickets Maximum
t i Tet nit
maximum 3m 8 spacings 2Omm. Zt NAN
centres, . TTT
Vivi FU eid
—|/F =| lf-ll “IFAT AFA
PLAN VIEW PICKET DETAIL ELEVATION
A Tree Protection Using Mesh B Protection of Individual Tree
Barrier dnd whore eveavaters and simiarare elngused
nearby.
(-_ TREE PROTECTION FENCE - REFER PLANS FOR LOCATION
XK Not to Scale
I
I
I
I
I
I
I
I
I
al
A. PROJECT MANAGEMENT
A.1_— General
A copy of the VMP (Council approved copy) is to be provided to all involved project stakeholders.
A.2_ Roles and responsibilities
Superintendent
The Superintendent will fulfill the duties as described within AS4000 and will be a RPEQ Civil Supervisor and will
project manage the civil contractor including clearing works.
Superintendent's Representative (SR)
The superintendent's representative delegated to manage vegetation issues will be the Landscape Architect.
The Landscape Architect will liaise and seek approval from the Council ecologist/ environmental officer
regarding any change to the tree retention strategies described on the approved VMP. The SR will organise the
project arborist as required when any works are to occur under trees illustrated on the VMP. No works are to
occur until this approval is received from Council.
Contractor
The contractor is to follow the requirements of this VMP as part of their WUC. Instructions are to be given by
the Superintendent and his/her representative on the responsibilities and restrictions placed on works with
regards to the revegetation and rehabilitation of the site. The contractor is to advise the superintendent
whenever works are programmed around trees to ensure the arborist can be present.
Pre-Start Meeting with Council
At the commencement of works, a pre-start meeting is to be held between the Council, contractor, the
Superintendent and the Superintendent's Representative. This meeting is to inform the contractor of the intent
of the VMP and to help locate areas or trees that have specific requirements, and to set up a system of regular
inspections by the SR to ensure the VMP is being adhered to. Any tree protection fencing (construction barriers)
required should be installed at this time for approval by the Council.
B.1 Clearing Procedures:
e Prior to commencement of clearing operations, the site is to be inspected and locations of fauna and fauna
habitat noted by a qualified wildlife officer (fauna spotter) capable of assessing, treating and relocating fauna.
e All cleared vegetation, with the exception of fertile weed material, is to be chipped and stockpiled for reuse
on site or taken offsite for lawful disposal.
e Any detection of a Koala will require a mandatory stopworks.
The nature of the supervised clearing operation will be such that any Fauna will have the opportunity to retreat
into any protected or uncleared areas of the site or adjacent the site. Clearing is to be staged in a way that
directs fauna to adjacent habitat areas beyond the clearing works. Clearing shall begin at the furthest point
from the desired habitat vegetation and be cleared towards it. The fauna spotter shall be present during these
operations to ensure safe travel for any fauna spotted in trees or in the vicinity.
Vegetation must only be removed or disturbed in accordance with approved Fauna Management Plan
i B.3 Storage And Stockpiling
e Stockpile areas are to be located, away from drainage lines, native bushland, vegetation to be retained, or
tree protection areas.
e Protect all stockpiles from erosion and erect erosion protection barriers to the perimeter of stockpiles - refer
to Civil Engineering drawings for sediment and erosion control program, control measures, monitoring, and
maintenance procedures.
e Trees mulched for reuse on the site must be stockpiled and turned regularly for at least 3 months.
l
t
l
f
f
I
I
1] B.2 Clearing methodology
l
t
I
f
t
l
i
B.4___ Corrective actions and reporting reporting
If a contractor is found to be clearing vegetation indicated to be retained in the Vegetation Assessment Schedule
(VAS) found in this VMP then penalties may apply, as enforced through the Local By-Laws of Council. Where
trees to be protected are damaged, replacement of damaged vegetation shall be solely at the contractor's
expense. Costs will be determined using Australian Standard DR 99307 : Amenity trees - Guide to valuation
| NOOSA COUNCIL
APPROVED PLAN
OPW17/0123.01 10 OCT 2017
APPROVAL ISSUE
LEGEND
TREES TO BE RETAINED
AND PROTECTED
TREES POSSIBLE FOR RETENTION
THE INTENT IS TO RETAIN THESE TREES SUBJECT TO.
DETAILED DESIGN
~' ? s, TREES FOR REMOVAL
r |) REFER VEGETATION ASSESSMENT SCHEDULE
> WEED SPECIES
) REFER VEGETATION ASSESSMENT SCHEDULE
‘> DEAD TREES
| REFER VEGETATION ASSESSMENT SCHEDULE
EXISTING VEGETATION
To be retained subject to
future OPW application
EXISTING VEGETATION
To be removed
FILL
Refer Civil Plans
CUT
Refer Civil Plans
TREE PROTECTION ZONE
AS PER AS4970-2009
TPZ
Tpe1__| FREE PROTECTION FENCE
CONSTRUCTION
SEQUENCING/NOTES:
CONTRACTOR TO ALLOW FOR ALL SCOPE ON THE VMP
WITHIN THEIR PRICING.
STEP 1
STEP 2
STEP 3
STEP 4
STEP 5
Fencing to be surveyed by a licenced Surveyor
Install Fencing as shown on Plans
Arrange Inspection of Fencing by Project Arborist
NOTE: FENCING CANNOT BE MOVED OR ALTERED
IN ANY WAY WITHOUT THE PROJECT ARBORIST OR
THEIR REPRESENTATIVE PRESENT ONSITE.
Individual tree clearing in the Exclusion Zone by
Landscape Architect's Contractor Only
Civil Tree Clearing Scope - Clear all trees shown to
be removed that are outside of the Exclusion Zone
B FOR APPROVAL - MINOR CHANGE 2017-08-23 RC AG
A FOR APPROVAL 2017-02-13 RC AG
ISSUE: DETAILS: DATE: INIT: CHK'D:
JFOP
URBANCONSULTANTS
FRAN ANNA
PLANNERS
BRISBANE - SUNSHINE COAST - CENTRAL QLD
URBAN DESIGNERS BRISBANE - JFP House
76 Ernest Street,
South Brisbane Qld 4101
P 07 3012 0100 W www. jfp.com.au
SURVEYORS
ENGINEERS.
PROJECT TITLE:
PRECINCT F & E2
AT NOOSA SPRINGS
NOOSA HEADS
ALTUM
PLAN TITLE:
VEGETATION
MANAGEMENT PLAN /
COVER SHEET
COPYRIGHT © 2013 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED
OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE
WRITTEN CONSENT OF JEP URBAN CONSULTANTS PTY LTD.
Rear PEE ISSUE: NORTH:
M2652L VMO01 B
SCALE: 1:1000 @ A1
DATE:
FILE NAME:
tP/Q2/ ART PLANs - £2 AND F
COMBINED.DWG
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Approved Compiled Plans OPW17-0123.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.