Council archive · source document
SBC Master Plan Stage 1 Concepts · 132002.220285
Plans and drawings: the text below has words only, no drawings.
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 1 6 19.3.1.6 The master plan will be prepared in consultation with relevant stakeholders including the developer, Noosa Council, State Government agencies and the focal design community and key Stakeholders in the area. If will also include consultation with the general community. The plan will require approval from Noosa Council and relevant State Government agencies. 19.3.1.7 The sequencing of development will be consistent with the master plan and the needs of the community. Design Considerations 19.3.1.8 Whilst the development will have entry Statements on its access points, the overall development will have an internal focus and not be reliant on main road exposure. AS a consequence, significant landscape buffering will be provided fo Eenie Creek Road and the Emu Mountain Road- Eenie Creek Road route. 19.3.1.9 The design of the overall Shire Business Centre, together with individual elements within it, will be distinctive and unique. Its design will be determined by its setting and will be recognisable as a development within Noosa Shire. To achieve this, the Shire Business Centre and particularly the retail, business, office and community components wilf have an outdoor focus, with the site’s topographic, vegetation and focal climatic features integrated into the development. Key features will include:- * Fetention of existing vegetation as key . landscape elements; e &£xisting drainage paths as key drainage patterns; e A low rise form of mainly single storey buildings; e integrated approaches to establishing land use arrangements, development designs and landscaping; e Energy efficiency in the design of buildings and the operation of the centre; and FIGURE 22 e Separate buildings, rather than large bulky developments under a single roof. 19.3.1.170 Drainage systems will be designed to prevent water quality impacts in Eenie Creek. Such drainage systems will be designed for the collection of part of the runoff waters from the existing industrial estate in order to improve runoff water guality from that area. 19.3.1.11 Dedication of a significant open space area adjacent to Eenie Creek, which connects fo the drainage system of the site and to the key gathering places and open space areas within the centre. 19.3.1.12 Development will meet the requirements of the Environmental Management Aims and adhere to Strategic Principles, 25.1-25.4 and Development Principles 26.1-26.9. External Traffic Movements 19.3.1.13 The development will contribute towards the construction of external roadworks through a construction and contributions strategy which has regard to the sequencing requirements of 19.3.1.3 and 19.3.1.5. This strategy will recognise the staging programme and provide for the timing of any construction and contributions consistent with that programme. 19.3.1.14 Access points to and from Eenie Creek Road and to any new route between Emu Mountain Road-Eenie Creek Road will be minimised and strictly controlled to avoid traffic hazards and congestion and fo prevent ribbon development. It is preferable that there be one point of access to each road. Traffic movements at intersections will be controlled by roundabouts. 19.3.1.15 Traffic movements should be based on bringing traffic into the site away from the external roads and then dispersing that traffic to appropriate carpark areas. External roads will not form part of the dispersal system. 19.3.1.16 A transport link should be provided between Production Street and the new route, Emu Mountain Road-Eenie Creek Road. Eenie Creek Road, plus suitability.on A HAShire Business Centre\NSC MasterPian\Master Plan.doc We Final, endorsed by Council 24/05/2001 “\ oon? Cre extension over Weyba Creek State 60-80 kmihr’ 4 At grade Limited Unsuitable Suitable’ Emu Mountain Road-Eenie ‘Creek Road Counci! 60-80 kmihr' 2’ Al grade Limited Unsuitable Unsuitable " Excluding urban areas. BR, ee y\e" oo oO? ~. c
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SBC Master Plan Stage 1 Concepts.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.