Council archive · source document
06/2689 - Request for further Info [As Published] · 132006.2689
Nick Cooper, 07 5449 5108
Email: [email protected]
Application Ref: 2006/2689
31 May 2007
Morgan & Beiers Pty Ltd
CARE Ken Hicks & Associates Pty Ltd
PO Box 6380
MAROOCHYDORE BC QLD 4558
Dear Sir or Madam,
Re: Application for Commercial Business Type 1 - Office situated at 249, 247&
253 David Low Way Peregian Beach, described as Lot 1 & 2 on RP903222
and Lot 26 on P9315
I refer to the above application and advise that following preliminary examination of the
plans, the following information is required to be submitted:-
Land Use
1. Please amend plans or provide justification with reference to non-compliance with
Scheme requirements relating to:
1.1. Front Boundary Setbacks – please provide a greater setback from the front
boundary, the proposed setback is considered inconsistent with existing
front setbacks for the area.
2. Please provide further details of building materials / finishes proposed. Please
note that the extensive use of glass finishing is considered to provide the
buildings with a commercial appearance / nature. Where as the buildings should
present a domestic form of architecture, rather than commercial.
Land Development
Survey
3. It is noted that survey information has been supplied as part of the response to
Council’s initial Information Request, however the plan does not provide all of the
information that Council previously requested.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
3.1. In this regard please arrange the licensed land surveyor to amend their
plan by including the information that was previously requested but not
provided. Specifically, the plan shall show all services (including their
alignment, size, depth, invert level, etc), all vegetation, existing building
structures (on the subject site and on the adjoining allotments), pathways,
the edge of the frontage road (the David Low Way), topography of the site
and surrounding land (with contours at 200mm intervals) and any other
relevant information.
3.2. The amended plan should also show all existing vegetation within the road
reserve and adjoining properties (including their girth, height and canopy
cover).
This information is required to assess whether their will be any impact to
adjoining properties and vegetation particularly in light of the extensive
earthworks proposed in order to construct the proposed basement carpark.
All level information shall be to the Australian Height Datum (AHD).
Level Information
4. It is noted that only some level information has been provided as part of the
response to Council’s initial Information Request.
4.1. In this regard it would be helpful to know the levels of the upper level
carpark and driveway areas so that Council can establish the impacts to
adjoining properties.
4.2. It is also noted that the floor levels proposed for the building, as shown on
the plans, are not consistent with the elevations where it appears that the
floor to floor dimensions are proposed to be 2.8m, whereas the plan levels
suggest a 2.7m floor to floor dimension. In this regard it is important to
ensure that the plans and elevations accurately reflect what is being
proposed and that the Council can establish the correct height of the
proposed building in relation to the 8m-height limit.
4.3. It is further noted that the driveway ramp grades need to be determined
based on the inside radius of the ramp (i.e. where the ramp grades will be
steeper) as opposed to the grade at the centre of the ramp. This is outlined
in the Australian Standard for Off-Street Car Parking (AS2890.1) and will
need to be addressed.
4.4. Furthermore, the applicant will need to demonstrate in accordance with
Specific Outcome O17 of Table 14-46 of the Driveways & Carparking Code,
that a basement level of RL7.1 (as presently proposed) can in fact drain by
gravity means without the need for pumping.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Page 3
In this regard the applicant will need to arrange a surveyor to establish the
invert levels of Council’s existing drainage system and demonstrate how
the basement will be drained to this drainage system. If this cannot be
achieved the applicant will need to investigate the option of raising the
basement level (to ensure the basement can drain by gravity means)
and/or upgrading the existing Council drainage system such that it is at a
level that can drain the basement carpark. These issues will need to be
resolved prior to Council issuing a Development Permit for the proposed
Material Change of Use, as Council must be sure that the development is
suitable and can actually work.
Car Parking
5. Demonstrate that the proposed driveway and carparking area comply with all
aspects of the Australian Standard (AS2890.1) for Parking Facilities, Part 1: Off
Street Car Parking.
5.1. In this regard it is noted that the present proposal contains, blind corners
and blind aisles with no provision for vehicles to turn around. As such,
designated turning bays must be provided and it is recommended that they
be at least 3m wide (to allow ease of access and departure) and at least
5.4m long. To this end:
One turning bay should be provided adjacent to the proposed
stairs located at the south-eastern corner of the basement (space
number 30), and
One turning bay should be provided on the eastern side of the
basement, immediately to the north of the proposed tank (space
number 22).
5.2. The proposed driveway ramp that provides access to the carpark needs to
be amended as:
It appears that two laneways will need to be separated by a cental
median, with each lane having a minimum width of 3.9m measured
between kerbs.
The proposed ramp grades must be determined by the inside radius of
the ramp (i.e. where the ramp grades will be steeper) not the middle of
the ramp.
Headroom between the ramp and the entrance to the basement
carpark must be designed such that vehicles will not hit the upper
level, as this will require changes to the upper level and/or the
driveway grades.
5.3. Amend the proposal plan such that clear access is available to all stairs
cases. In this regard it is noted that clear access cannot be obtained to the
proposed stair at the south-eastern corner of the upper level carpark. A
clear passage of at least 1.5m in width should be available to the stairs,
free of any carparking spaces or wheel-stops that would impede pedestrian
movements.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Page 4
5.4. Given the overall size of this development and the number of separate
tenancies proposed, please provide at least 2-disabled car park spaces on
site.
The abovementioned issues outline some of the problems that have been noted
and in this regard the applicant will need to review AS2890.1 in detail to ensure
the car park and driveway ramps are designed correctly.
Vehicle Access
6. The proposed separated entry and exit for the development, similar to that which
exists for the existing house on site, is not suitable for a development of this scale
and likely traffic generation and would result in countless conflicts between
vehicles and pedestrians using the footpath especially given that the driveway
has a width of approximately 25m, which coincides with the pedestrian path. The
angle of the entry and exit would also cause vehicles to enter and leave the site
at faster speeds, which is not conducive for pedestrian safety and nor are
adequate sight lines available.
In this regard a consolidated access needs to be provided with left-in/left-out
access, and this driveway should not extend beyond the prolongation of the
southern boundary of the site (i.e. the driveway should be contained to the actual
frontage of the development and not impede onto the frontage of adjoining
properties).
7. Demonstrate that vehicles can safely enter, manoeuvre throughout the site, park
on site, and leave the site without scraping and/or bottoming. This shall be
undertaken for all types of vehicles expected to enter the site, with consideration
given to the height of such vehicles and the headroom required under the
building. This was previously requested by Council, but as the applicant has not
provided any evidence to demonstrate that the proposal will work the information
is still needed.
8. Illustrate on the proposal plans that suitable sight distances can be achieved from
the proposed access driveway to pedestrians on the pathway network and to
vehicles on the David Low Way based on the 85-percentile design speed of the
David Low Way, not the sign posted speed limit. In this regard a design speed of
70km/h would be more realistic and consideration should also be given to
existing vegetation and/or proposed vegetation that may restrict these sight lines.
End of Trip Facilities
9. Illustrate on the proposal plans all “end of trip facilities”, such as bicycle storage
lockers for staff, bicycle storage areas for customers, showers, change rooms,
seating areas, drinking fountains, etc to cater for people who walk or cycle to the
site.
Stormwater Drainage
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Page 5
10. Demonstrate that the site can be developed with no net increase in runoff from
the site for storm events up to a 1 in 100 year Average Recurrence Interval. In
this regard the stormwater drainage system designed for the site will need to
incorporate an adequate detention system (holding tanks and rainwater tanks) to
retain these flows, which can be utilised for irrigation, toilet flushing, hose down of
paved surfaces, and ground water recharging.
The present proposal and Stormwater Management Plan does not address this
issue.
In this regard additional flows into the existing drainage system in the David Low
Way will not be supported.
11. Demonstrate that the site can be drained without the use of pumps in accordance
with Specific Outcome O17 of Table 14-46 of the Driveways & Carparking Code.
In this regard the basement proposal cannot be supported unless it can be
drained by gravity means.
The applicant is also advised that given stormwater from the carparking and
driveway areas of will contain contaminants such as oil, grease, and fuel, all
stormwater runoff will need to be collected and discharged through a suitable
grease/oil arrestor and/or Gross Pollutant Traps to separate these contaminants
and prevent them from entering Council’s drainage system.
Traffic Issues
12. The previously submitted traffic report shall be amended to reflect the new
proposal plan (and any changes that may be generated as a result of this
information request) and resubmitted for Council to review.
Engineering Reports
13. Please arrange for all engineering design plans and engineering reports
submitted with the application to be certified by an appropriately qualified
Registered Professional Engineer Queensland (RPEQ), as it is noted that none of
the plans nor any of the engineering reports have been prepared, checked, and
approved by an authorised person. In this regard none of the plans or the
engineering reports will be assessed in detail until a RPEQ has authorised them.
Council therefore reserves the right to make a subsequent request for further
information upon review and assessment of the authorised documentation with
no consequence to IDAS time lines set by the Integrated Planning Act.
The applicant and any consultants assisting in the preparation of this
development proposal are advised that an independent check of some or all of
the technical reports and plans submitted may be forwarded to Council’s own
expert specialists, and the cost of this independent review will be borne by the
applicant.
Please provide four (4) copies of all information that you are providing. In addition, it
would assist Council if you could also provide an electronic copy of your response.
Please be aware that under Section 3.2.12 of the Integrated Planning Act, the applicant
is to respond to any information request within 12 months of the request or otherwise,
the application lapses.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Page 6
Under the provisions of the Integrated Planning Act 1997, you as the applicant, have
three options available in response to this Information Request. You may give the
assessment manager (in this instance Council) and each referral agency (if any):-
1. all of the information requested; or
2. part of the information requested together with a letter asking the assessment
manager and each referral agency to proceed with the assessment of the
application; or
3. a letter:-
3.1. stating that you do not intend to supply any of the information requested;
and
3.2. asking the assessment manager and each referral agency to proceed with
the assessment of the application.
The above information is required to be submitted, prior to assessment of the
application. If any further matters arise as part of assessment of this application, you
will be advised accordingly.
Should you have any further queries in relation to the above, please do not hesitate to
contact on the above number.
Yours faithfully,
Nick Cooper
PLANNING OFFICER
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Used in these records
06/2689 - Request for further Info [As Published]Related documentApplication case desk ↗
About this file
- File size
- 25 KB (small file)
- File type
No other editions are linked here.