Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Att12 - Emergency Management Plan

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  EMERGENCY MANAGEMENT PLAN
         To be read in conjunction with Bushfire Evacuation Plan

LOT 7 ON RP216403, LOT 394 ON M371117, AND LOT 650 ON M37380
             48-59 KABI ROAD, COOTHARABA, QLD
Log in to download the original file

Att12 - Emergency Management Plan.pdf · 327 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 6 pages

Page 2

Emergency Management Plan
Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380 – 48-59 Kabi Road, Cootharaba

DOCUMENT CONTROL

Document              Emergency Management Plan
Client                Christian Youth Council
Project Number        1302-01 (architects project reference)
Project               CYC Noosa Campsite
Site                  Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380
                      48-59 Kabi Road, Cootharaba, QLD


 Version           Date               Distribution Author/s                Approved
       1           01/09/2022         Carlie Grant – CYC
                                      Elevation
                                      Architecture

Page 3

Emergency Management Plan
Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380 – 48-59 Kabi Road, Cootharaba


Contents
Introduction ......................................................................................................................................................... 4
Details of Premises .............................................................................................................................................. 4
Roles and Responsibilities ................................................................................................................................... 4
Contact Details of Emergency Services ............................................................................................................... 4
Emergency Events ............................................................................................................................................... 5
Evacuation Location ............................................................................................................................................ 6
Transportation ..................................................................................................................................................... 7
Evacuation Routes ............................................................................................................................................... 7

Page 4

Emergency Management Plan
Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380 – 48-59 Kabi Road, Cootharaba


Introduction
This Emergency Management Plan (EMP) has been designed to assist management to protect life
and property in the event of an emergency or pending emergency on the proposed Site. The site is formally
described as Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380 located at 48-59 Kabi Road,
Cootharaba QLD. The site is the subject of a proposed Other Change Application to be submitted to Noosa
Council.

The EMP aims to establish pre-planning guidelines for an evacuation of the premises where there is a need
to relocate personnel from one place to another to enhance the protection of those people. This evacuation
plan is in partnership with the Bushfire Evacuation Plan (BEP) prepared by North Coast Environmental
Services which in turn forms part of a more comprehensive report undertaken over the subject area to
assess and recommend fire mitigation measures for bushfire protection; Bushfire Hazard Assessment &
Management Plan. It is recommended both documents be read and stored together.

Details of Premises
Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380 48-59 Kabi Road, Cootharaba QLD

Type of facility: Tourist accommodation (youth camp)

Type of building (Class): Class 3 and 9 habitable buildings.

Roles and Responsibilities
 KEY PERSONNEL         RESPONSIBILITIES
 Group Leader          Determine seriousness of incident. Notify relevant emergency services. Notify relevant CYC
                       staff (Program Coordinator, CEO). Administer appropriate first aid
 Activity Leader       Group control. Administer appropriate first aid under instruction of the Group Leader
 Teachers              Group control


 Police, Ambulance, Fire              000
 Program Coordinator (Noosa)          Freddy Kamen – 0458 422 813
 Program Coordinator (Burleigh)       Jemma Lowe – 0449 711 544
 Education Manager                    Dom Spier – 0431 670 347
 Operations Manager                   Sam Tilley – 0497 674 008
 CEO                                  Andrew Grant – 0438 190 398
 CYC Burleigh                         07 5535 1324


Contact Details of Emergency Services
Name of Organization              Name/ Place of Contact Phone Number

Pomona Fire Station               11/9 Reserve St, Pomona QLD 4568 (07) 5489 4304 Emergency 000 Pomona
Police Station                    22 Red St, Pomona QLD 4568 (07) 5480 1733 Emergency 000 Tewantin
Ambulance Station                 4 Cooroy Noosa Rd, Tewantin QLD 4565 (07) 5420 9990 Emergency 000

Sunshine Coast Council            (07) 5475 7272 (including after-hours emergency service)

State Emergency Service           132 500 QLD Ambulance Service 000

Noosa Hospital                    111 Goodchap St, Noosaville QLD 4566 (07) 5455 9200

Page 5

Emergency Management Plan
Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380 – 48-59 Kabi Road, Cootharaba


Emergency Events
FLOODWATERS

Given the extent of the total catchment affecting the site (some 138 ha), the site is subject to
substantial overland flows. Due to the steepness of the catchment area, overland flows are
expected to be quick to accumulate on site and also quick to disperse downstream, unless captured
on site. In overland flow paths and site flat spots rapid rising of stormwater may occur in heavy
rainfall. This may lead to some access tracks and paths being cut off for periods during heavy
rainfall events. Due to the rural nature of the catchments, it is also possible that ground water will
continue to affect the site for some time after the cessation of rainfall.
Preliminary calculations of the depth of flow indicate that overland flows are likely contained within
existing flow paths within the site. A high-level catchment assessment reviewing the critical
locations (low points and extended flat areas) indicates that inundation up to 300mm deep may
occur at some locations. Future proposed accommodation and infrastructure should be kept clear
of these areas, as is indicated in the Layout plans by Elevation Architecture.
The preliminary calculations also indicated that the site access may be inundated during
heavy rainfall events. This was confirmed by the heavy rainfall experienced during February
2022 with reports from onsite that the entry was indeed inundated for a period of time. The
estimated calculated flow depth is in the order of 50mm, which is not considered deep for
trafficability. The estimated velocity is around 2m/s with a velocity depth product
approaching 0.1 m2/s. It may be that this inundation is considered trafficable and/or only
occurs for a short period and therefore does not substantially limit access to the site. However
further calculation and assessment as part of future design should be undertaken to confirm the
impact on the site and site operations.
A review of Councils flooding overlay mapping was undertaken which illustrated that various
routes local to the site are subject to flowing in a 1 in 100-year storm event. The following
access points flood / affected by a waterway (see Figure 2):
       - The intersection of Cootharaba Road and Lake Flat Road, approximately 1.5-2.0 km
       northwest of the site.
       - The intersection of Road 176 and Cootharaba Downs Road floods, approximately 0.9-
       1.3 km Southeast of the site.
       - Cootharaba Road is affected by waterway, approximately 1.6-1.9 km from the
       Southwest from the site.
       - The intersection of Junction Road and Loui Bazzo Drive, approximately 4.5-5.0 km
       south of the site.
The initial review indicates that there is not a flood free route for the site in the event of a
significant flood. Therefore, this EMP has been prepared to assist with site management during
potential flood events along with other emergencies.

Page 6

Emergency Management Plan
Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380 – 48-59 Kabi Road, Cootharaba




 Figure 1. Flooding and Watercourse Extents (NSRC Interactive Mapping 2020)


FIRE

Appropriate fire alarm systems will be designed within each proposed building on site, providing thermal
and smoke detection to all villages and communal areas. The triggering of these alarms will result in
appropriate sound alarms across the site and summoning of Local Fire Fighting services via Back to Base
connections. Assembly areas on site will be determined as the first step in evacuation in the event of
triggered fire alarms.

Evacuation Location
ASSEMBLY AREA

In the event of centralised emergencies, such as localised fires within village buildings, evacuation to a
centralised assembly area will be the first step prior to sheltering on site or evacuating the site. The assembly
area will be situated 20m away from any buildings on site.

In the event of an assembly emergency directive being issued for all villages (entire site) via the alarm system
or such the entire site is to evacuate to the Communal Area Assembly Area (Assembly CA - figure 2) and the
24/7 onsite manager with the help of the Group Leaders are to ensure all occupants, staff and visitors are
recorded and a record of such made in a residents and visitors register to be kept in the reception building of
which is directly adjacent to the central hall. In case of the Fire alarms being triggered, Local Fire Fighting
services are automatically summoned to site so Group Leaders and on Site Manager must liaise with Fire
service to determine severity of the situation and further steps required.

Page 7

Emergency Management Plan
Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380 – 48-59 Kabi Road, Cootharaba

SHELTER IN PLACE DIRECTIVE

In the event of an emergency where sheltering on site is deemed the necessary action prior to full site
evacuation (or in the case of a flood – necessary due to the inability to evacuate from site), guests and
employees will shelter in place within the large central hall building (refer Central Hall on the plan of
development). This building is positioned near the centre of the site, 250m from the entry and situated on
the peak of a hill.

The maximum park occupancy is reported to be approximately 350 people including day staff. Commonly
used emergency shelter in place requirements is 1.5m²/person hence the central hall building can
adequately cater for shelter in place numbers. It is further noted that the directly adjacent reception and
kitchen building can offer food and amenities thereby ensuring the comfort of patrons during an emergency
period. In the event of a shelter in place directive being issued, the 24/7 onsite manager is to ensure all
occupants, staff and visitors have taken refuge in the central hall building with a record of such made in a
residents and visitors register to be kept in the reception building of which is directly adjacent to the central
hall.

Transportation
Visitors and staff are to either walk or use personal vehicles to gain access to the central hall building and
vehicles are to be parked in convoy along the roadside in case a site evacuation order is issued. Under such
circumstances visitors and staff personal vehicles are to be used to evacuate the site. Road access for
emergency evacuation is to be from the only entry exit in the southwest corner of the site.

Evacuation Routes
Evacuation can take place via internal road network and foot pathways from each village to appropriate
Assembly areas or the Shelter in Place Building.




  Figure 2. Site Evacuation routes, Assembly Area and Shelter in Place Building

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.