Emergency Management Plan
Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380 – 48-59 Kabi Road, Cootharaba

SHELTER IN PLACE DIRECTIVE

In the event of an emergency where sheltering on site is deemed the necessary action prior to full site
evacuation (or in the case of a flood – necessary due to the inability to evacuate from site), guests and
employees will shelter in place within the large central hall building (refer Central Hall on the plan of
development). This building is positioned near the centre of the site, 250m from the entry and situated on
the peak of a hill.

The maximum park occupancy is reported to be approximately 350 people including day staff. Commonly
used emergency shelter in place requirements is 1.5m²/person hence the central hall building can
adequately cater for shelter in place numbers. It is further noted that the directly adjacent reception and
kitchen building can offer food and amenities thereby ensuring the comfort of patrons during an emergency
period. In the event of a shelter in place directive being issued, the 24/7 onsite manager is to ensure all
occupants, staff and visitors have taken refuge in the central hall building with a record of such made in a
residents and visitors register to be kept in the reception building of which is directly adjacent to the central
hall.

Transportation
Visitors and staff are to either walk or use personal vehicles to gain access to the central hall building and
vehicles are to be parked in convoy along the roadside in case a site evacuation order is issued. Under such
circumstances visitors and staff personal vehicles are to be used to evacuate the site. Road access for
emergency evacuation is to be from the only entry exit in the southwest corner of the site.

Evacuation Routes
Evacuation can take place via internal road network and foot pathways from each village to appropriate
Assembly areas or the Shelter in Place Building.




  Figure 2. Site Evacuation routes, Assembly Area and Shelter in Place Building
Log in to download the original file

Att12 - Emergency Management Plan.pdf · 327 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.